TDP calibration and processing group (CPG): activities and status Athol Kemball (for CPG) University of Illinois at Urbana-Champaign

Slides:



Advertisements
Similar presentations
SKADSMTAvA A. van Ardenne SKADS Coördinator ASTRON, P.O. Box 2, 7990 AA Dwingeloo The Netherlands SKADS; The.
Advertisements

Paul Alexander DS3 & DS3-T3 SKADS Review 2006 DS3 The Network and its Output Data Paul Alexander.
Jeroen Stil Department of Physics & Astronomy University of Calgary Stacking of Radio Surveys.
HI Stacking: Past, Present and Future HI Pathfinder Workshop Perth, February 2-4, 2011 Philip Lah.
5-6 May 2009 AWG Meeting LAX1 Technology Development Project US contributions to global.
SKADS: Array Configuration Studies Implementation of Figures-of-Merit on Spatial-Dynamic-Range Progress made & Current status Dharam V. Lal & Andrei P.
HI in galaxies at intermediate redshifts Jayaram N Chengalur NCRA/TIFR Philip Lah (ANU) Frank Briggs (ANU) Matthew Colless (AAO) Roberto De Propris (CTIO)
TDP activities in calibration and processing Athol Kemball for TDP Calibration & Processing Group (CPG) Department of Astronomy, University of Illinois.
US Technology Development Project for the SKA Jim Cordes AWG Meeting March 2008, San Francisco SKA Context TDP work plan Constraints and considerations.
Goals of DVA-1 Meeting Overall goal: build an SKA antenna with SKA feeds/receivers, verify performance and fabrication/costs for the next stages of the.
22 May 2008Lynn Baker USSKA Consortia Meeting Washington, DC1 Project Manager, Responsibilities and Tasks –Coordination between groups within the TDP –Promote.
The EVLA and SKA pathfinder surveys Jim Condon NRAO, Charlottesville.
SKA TDP Advisory Committee Report to US SKA Consortium, 17 November 2008, Madison Trish Henning.
The SKA Molonglo Prototype (SKAMP) Project SKA Meeting - April 2006 Anne Green.
22 May 2008 Jim Cordes US SKA Consortium Meeting Washington, DC1 Technology Development Project Presentation TDP OverviewJim Cordes »Programmatics »International.
LSU 07/24/2004Defining Project Tasks1 Defining the Project Tasks Project Management Unit, Lecture 4.
Petascale astronomy and the SKA Athol Kemball Department of Astronomy & Center for Extreme-scale Computing (IACAT/NCSA) University of Illinois, USA
National Center for Supercomputing Applications Observational Astronomy NCSA projects radio astronomy: CARMA & SKA optical astronomy: DES & LSST access:
DVA Series Work Flow P. Dewdney Apr 15, SPDO DVP Work Flow 2 DVA-1 CPG.
Survey Quality Jim Condon NRAO, Charlottesville. Survey Qualities Leiden 2011 Feb 25 Point-source detection limit S lim Resolution Ω s Brightness sensitivity.
Transition from SKADS to PrepSKA Richard Schilizzi Lisbon, 3 October 2008.
Copyright, 1996 © Dale Carnegie & Associates, Inc. Tim Cornwell Kumar Golap Sanjay Bhatnagar Wide field imaging - computational challenges.
Controlling Field-of-View of Radio Arrays using Weighting Functions MIT Haystack FOV Group: Lynn D. Matthews,Colin Lonsdale, Roger Cappallo, Sheperd Doeleman,
S.T. MyersEVLA Advisory Committee Meeting September 6-7, 2007 EVLA Algorithm Research & Development Steven T. Myers (NRAO) CASA Project Scientist with.
Paul Alexander & Jaap BregmanProcessing challenge SKADS Wide-field workshop SKA Data Flow and Processing – a key SKA design driver Paul Alexander and Jaap.
RadioNet First Software Forum, Jodrell Bank – 01Mar05 1 Algorthmic Issues from the First RadioNet Software Forum – a synthesis Steven T. Myers National.
The Expanded Very Large Array: Phase I Science and Technical Requirements Rick Perley NRAO - Socorro.
CRISP & SKA WP19 Status. Overview Staffing SKA Preconstruction phase Tiered Data Delivery Infrastructure Prototype deployment.
Thermal-aware Issues in Computers IMPACT Lab. Part A Overview of Thermal-related Technologies.
Fundamental limits of radio interferometers: Source parameter estimation Cathryn Trott Randall Wayth Steven Tingay Curtin University International Centre.
EVLA Software Bryan Butler. 2007May22EVLA SAGE Meeting2 Requirements and Goals of EVLA Software Maximize scientific throughput of the instrument At a.
Peter Wilkinson SKADS Workshop: Paris 10 October nd SKADS Workshop: Introduction “What is it about?” Peter Wilkinson University of Manchester.
Wide-field imaging Max Voronkov (filling up for Tim Cornwell) Software Scientist – ASKAP 1 st October 2010.
Arecibo Frontiers – 12 Sep Beyond the Frontiers: The Road From Arecibo to The Radio Synoptic Survey Telescope (RSST) Steven T. Myers National Radio.
Sanjay BhatnagarEVLA Advisory Committee Meeting May 8-9, EVLA Algorithm Research & Development Progress & Plans Sanjay Bhatnagar CASA/EVLA.
Cosmic magnetism ( KSP of the SKA)‏ understand the origin and evolution of magnetism in the Galaxy, extragalactic objects, clusters and inter-galactic/-cluster.
EVLA Data Processing PDR Scale of processing needs Tim Cornwell, NRAO.
Large Area Surveys - I Large area surveys can answer fundamental questions about the distribution of gas in galaxy clusters, how gas cycles in and out.
ASKAP: Setting the scene Max Voronkov ASKAP Computing 23 rd August 2010.
Australian SKA Pathfinder (ASKAP) David R DeBoer ATNF Assistant Director ASKAP Theme Leader 06 November 2007.
Recent progress in EVLA-specific algorithms EVLA Advisory Committee Meeting, March 19-20, 2009 S. Bhatnagar and U. Rau.
The Allen Telescope Array Douglas Bock Radio Astronomy Laboratory University of California, Berkeley Socorro, August 23, 2001.
Paul AlexanderSKA Computational Challenges Square Kilometre Array Computational Challenges Paul Alexander.
Foreground Contamination and the EoR Window Nithyanandan Thyagarajan N. Udaya Shankar Ravi Subrahmanyan (Raman Research Institute, Bangalore)
SKA: Configurations and Simulations Ramesh Bhat Colin Lonsdale Roger Cappallo Shep Doeleman Divya Oberoi Joanne Attridge MIT Haystack Observatory.
The North America Array Technology Development and the Realization of the SKA-High Steven T. Myers & Jim Ulvestad NRAO 15 Oct 2009 USSKA Consortium Meeting.
The SKA: Next Week, the Next 3 Years & Beyond Jim Cordes, Cornell University 24 August 01  Concepts  Science Goals & Payoffs  Configurations, Modes.
Observed and Simulated Foregrounds for Reionization Studies with the Murchison Widefield Array Nithyanandan Thyagarajan, Daniel Jacobs, Judd Bowman + MWA.
Future Radio Interferometers Jim Ulvestad National Radio Astronomy Observatory.
Rosie Bolton 2 nd SKADS Workshop October 2007 SKADS System Design and Costing: Update and next steps Rosie Bolton University of Cambridge.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
Big Bang f(HI) ~ 0 f(HI) ~ 1 f(HI) ~ History of Baryons (mostly hydrogen) Redshift Recombination Reionization z = 1000 (0.4Myr) z = 0 (13.6Gyr) z.
Effectiveness of the Correlator Field of View Weighting Technique in Source Attenuation Dylan R. Nelson 1, S. S. Doeleman 2, C.J. Lonsdale 2, D. Oberoi.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
Square Kilometre Array eInfrastructure: Requirements, Planning, Future Directions Duncan Hall SPDO Software and Computing EGEE 2009.
S.T.MyersEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Data Post-processing Overview Steven T. Myers AIPS++ Project Scientist.
SKA System Overview (and some challenges) P. Dewdney Mar 22, 2010.
17 November 2008Lynn Baker US SKA Consortia Meeting Madison WI1 TDP Activity Report Lynn Baker US SKA Consortia Meeting Madison, Wisconsin November 17,
The Science Data Processor and Regional Centre Overview Paul Alexander UK Science Director the SKA Organisation Leader the Science Data Processor Consortium.
The North America Array Technology Development and the Realization of the SKA-High Steven T. Myers NRAO 14 May 2009 USSKA Consortium Meeting Washington,
Imaging issues Full beam, full bandwidth, full Stokes noise limited imaging Algorithmic Requirements: –PB corrections: Rotation, Freq. & Poln. dependence,
Direction dependent effects: Jan. 15, 2010, CPG F2F Chicago: S. Bhatnagar 1 Direction-dependent effects S. Bhatnagar NRAO, Socorro RMS ~15  Jy/beam RMS.
Mid Frequency Aperture Arrays
Computing Architecture
Imaging and Calibration Challenges
Wide-field imaging Max Voronkov (filling up for Tim Cornwell)
Jim Cordes Cornell University
EVLA Algorithm Research & Development
Future Radio Interferometers
Rick Perley NRAO - Socorro
Presentation transcript:

TDP calibration and processing group (CPG): activities and status Athol Kemball (for CPG) University of Illinois at Urbana-Champaign

US SKA May 2008 Current CPG membership Athol Kemball (Illinois) (Chair) Geoff Bower (UCB) Jim Cordes (Cornell; TDP PI) Joe Lazio (NRL) Colin Lonsdale (Haystack/MIT) Steve Myers (NRAO) Jeroen Stil (Calgary) Greg Taylor (UNM) Calgary Cornell NRL UIUC MIT NRAO UCB UNM

US SKA May 2008 Calibration and processing challenges for the SKA (LSST) SKA-era telescopes & science require: Surveys over large cosmic volumes (Ω,z), fine synoptic time-sampling Δt, and/or high completeness High receptor count and data acquisition rates Software/hardware boundary far closer to receptors than at present Efficient, high-throughput survey operations modes Processing implications High sensitivity, A e /T sys ~10 4 m 2 K -1, wide-field imaging; Demanding (t,ω,P) non-imaging analysis Large O(10 9 ) survey catalogs High associated data rates (TBps), compute processing rates (PF), and PB/EB archives (HI galaxy surveys, e.g. ALFALFA HI (Giovanelli et al. 2007); SKA requires a billion galaxy survey.)

US SKA May 2008 SKA design & development phase ( ) Hardware design choices will define calibration and processing performance (e.g. dynamic range), cost, and feasibility. In turn, need to identify calibration and processing constraints on hardware designs.

US SKA May 2008 Calibration and processing design elements CPG goals Determine feasibility of calibration and processing required to meet SKA science goals; Determine quantitative cost equation contributions and design drivers as a function of key design parameters (e.g. antenna diameter, field-of-view, etc) Measure algorithm cost and feasibility using prototype implementations Demonstrate calibration and processing design elements using pathfinder data. US technology development emphases Large-N small-diameter (LNSD) parabolic antenna design, wide-band single-pixel feeds, mid to high frequency range. Close liaison with current international and national efforts. (ATA)

US SKA May /07: Initiate workplan development for CPG. Work ramps up. 09/07: PrepSKA collaboration discussions. 11/29/07: Face-to-face CPG meeting for in-depth workplan refinement. 12/15/07: Finalize CPG project execution plan as part of general TDP project execution plan. 01/08: URSI LNSD session. 04/08: SKA CALIM conference Perth. Q1-Q3/08: Hire CPG postdocs at UCB, MIT, & UIUC. … CPG immediate future steps November 2007 Completed Completed 01/08 Completed In process

US SKA May 2008 CPG activity timeline Oct 07 to present OCTNOVDECJANFEBMARAPRMAYJUNJULOCTNOV CPG formation Project execution plan Execution plan implementation F2F planning meeting (Urbana) URSI 2008 LNSD session CPG meeting CPG F2F meeting (Perth) SKA CALIM 08 CPG F2F meeting (Washington DC)

US SKA May 2008 CPG organization and coordination Targeted design and development research working group, not production software development for SKA. Prototype development will be software-package neutral, i.e any package allowing the research task can be used. Close liaison with current international and national efforts. Regular schedule of face-to- face meetings and telecons All results aggregrated upwards into CPG Project Book; template defined. Intermediate results in memo series. Internal mailing list, collaborative workspace, progress tracking wiki, and document repository. (Internal collaborative workspace: progress tracking and communication)

US SKA May 2008 CPG engagement and partnerships Community web-site launched to publicize intermediate results and activities Engagement with: –National pathfinders (e.g. ATA, LWA, MWA, EVLA) –National center (NRAO) –Canadian efforts (Russ Taylor/Jeroen Sil [Calgary]) –International pathfinders: MeerKAT ASKAP –PrepSKA –Computer science & computer engineering groups (

US SKA May 2008 CPG project execution plan CPG work breakdown structure WBS 2.0: General WBS 2.1: Signal transport WBS 2.2: Calibration algorithms WBS 2.3: Imaging, spectroscopy, & time-domain imaging WBS 2.4: Scalability, & high- performance computing WBS 2.5: RFI WBS 2.6: Surveys WBS 2.7: Data management Cross-cutting goals LNSD feasibility: –e.g. dynamic range error budget LNSD cost equation contributions (per calibration and processing technology)

US SKA May 2008 Primary CPG deliverables CPG work breakdown structure made up of prioritized calibration and processing technologies that are central to SKA LNSD design. Key cross-cutting milestones are feasibility and cost assessments as envelope of design parameters (e.g. antenna diameter) and key science goals. Feasibility and cost model release planned annually; successively refined based on research results.

US SKA May 2008 Feasibility: imaging dynamic range Richards 2000HDFVLA 1.4 GHz7.5 μJy Norris et al 2005HDF-SATCA 1.4 GHz10 μJy Middelberg et al 2008 ELAIS IATCA 1.4 GHz< 30 μJy Miller et al 2008E-CDF-S{E}VLA 1.4 GHz6.4 μJy Reference specifications (Schillizzi et al 2007) Targeted λ20cm continuum field: 10 7 :1. Routine λ20cm continuum: 10 6 :1. Driven by need to achieve thermal noise limit (nJy) over plausible field integrations. Spectral dynamic range: 10 5 :1. Current typical state of practice near λ ~ 20 cm given below. (de Bruyn and Brentjens, 2005) High-sensitivity deep fields Noordarm et al C84WSRT 1.4 GHz10,000:1 Geller et al ATCA 1.4 GHz77,000:1 de Bruyn & Brentjens 2005 PerseusWSRT 92 cm400,000:1 de Bruyn et al, C147WSRT 1.4 GHz1,000,000:1 Dynamic range

US SKA May 2008 Feasibility: imaging dynamic range budget Visibility on baseline m-n Visibility-plane calibration effect Image-plane calibration effect Source brightness (I,Q,U,V) Direction on sky: ρ Basic imaging and equation for radio interferometry (e.g. Hamaker, Bregman, & Sault et al. 1996): Key contributions Robust, high-fidelity image-plane (ρ) calibration: –Non-isoplanatism. –Antenna pointing errors. –Polarized beam response in (t,ω), … Non-linearities, non-closing errors Deconvolution and sky model representation limits Dynamic range budget will be set by system design elements. (Bhatnagar et al. 2004; antenna pointing self- cal: 12µJy => 1µJy rms)

US SKA May 2008 (Cornwell et al. 2006: example of 1.4 GHz edge effect at 2% PB level)

US SKA May 2008 SKA dynamic range assessment – beyond the central pixel Current achieved dynamic ranges degrade significantly with radial projected distance from field center, for reasons understood qualitatively (e.g. direction-dependent gains, sidelobe confusion etc.) An SKA design with routine uniform, ultra-high dynamic range requires a quantitative dynamic range budget. Strategies: –Real data from similar pathfinders (e.g. ATA, EVLA) are key. –Simulations are useful if relative dynamic range contributions or absolute fidelity are being assessed with simple models. –New statistical methods: Assume convergent, regularized imaging estimator for brightness distribution within imaging equation; need to know sampling distribution of imaging estimator per pixel, but unknown PDF a priori: Statistical resampling (Kemball & Martinsek 2005ff) and Bayesian methods (Sutton & Wandeldt 2005) offer new approaches. Feasibility: dynamic range assessment

US SKA May 2008 Monte Carlo reference variance image MODEL-BASED BOOTSTRAP RESAMPLING EXAMPLE N p =1; Δt = 60 sNp=1; Δt = 150 s Np=1; Δt = 300 sNp=2; Δt = 900 s

US SKA May 2008 WBS 2.3.1: Cost equation: wide-field image formation Algorithm technologies 3-D transform (Perley 1999), facet-based tesselation / polyhedral imaging (Cornwell & Perley 1992), and w-projection (Cornwell et al. 2003). (Cornwell et al. 2003; facet-based vs w-projection algorithms)

US SKA May 2008 LNSD data rates (Perley & Clark 2003): where D = dish diameter, B = max. baseline, Δν = bandwidth, and ν = frequency Wide-field imaging cost ~ O(D -4 to -8 ) (Perley & Clark 2003; Cornwell 2004; Lonsdale et al 2004). Full-field continuum imaging cost (derived from Cornwell 2004): Strong dependence on 1/D and B. Data rates of Tbps and computational costs in PF are readily obtained from underlying geometric terms. Spectral line imaging costs exceed continuum imaging costs (further multiplier ) Possible mitigation through FOV tailoring (Lonsdale et al 2004), beam-forming, and antenna aggregation approaches (Wright et al.) –550 GBps/n a 2 (Lonsdale et al 2004) Runaway petascale costs for SKA tightly coupled to design choices WBS 2.3.1: Imaging cost equation contributions

US SKA May 2008 WBS 2.4: Scalability Inconvenient truths Moore’s Law holds, but high- performance architectures are evolving rapidly: –Breakpoint in clock speed evolution (2004) –Lateral expansion to multi-core processors and processor augmentation with accelerators Theoretical performance ≠ actual performance Sustained petascale calibration and imaging performance for SKA requires: –Demonstrated mapping of SKA calibration and imaging algorithms to modern HPC architectures, and proof of feasible scalability to petascale: [O(10 5 ) processor cores]. –Remains a considerable design unknown in both feasibility and cost. (Golap, Kemball et al. 2001, Coma cluster, VLA 74 MHz, parallelized facet-based wide-field imaging)

US SKA May 2008 NSF support for open petascale computing

US SKA May 2008 WBS 2.4: Scalability Fastest current NCSA system (abe.ncsa.uiuc. edu * ) Generic petascale system Peak performance PF10-20 PF Number of processors 9, , ,000 Amount of memory PB PB Disk storage 0.10 PB25-50 PB Archival storage EB0.5-1 EB (Dunning 2007) * Abe: Dell 1955 blade cluster – 2.33 GHz Intel Cloverton Quad-Core 1,200 blades/9,600 cores 89.5 TF; 9.6 TB RAM; 170 TB disk – Power/Cooling 500 KW / 140 tons

US SKA May 2008 WBS 2.4.5: Computing hardware cost models Computing hardware system costs vary over key primary axes: –Time evolution (Moore’s Law) –Level of commoditization Commoditization effects in computing hardware costs models for general- purpose CPU and GPU accelerators at a fixed epoch (2007). Estimated from public data. Moore’s Law for general-purpose Intel CPUs. Trend-line for Top 500 leading-edge performance.

US SKA May 2008 Predicted leading-edge LINPACK R max performance from Top 500 trend-line (from data t yr = [1993, 2007]): Cost per unit teraflop c TF (t), for a commiditzation factor η, Moore’s Law doubling time Δt, and construction lead time Δc: [with c TF (t 0 ) = $300k/TF, t 0 = 2007, η = [ ], Δt ~ 1.5 yr, Δc ~ 1-4 yr] WBS 2.4.5: Computing hardware cost models

US SKA May 2008 Facility parameters: –One PF sustained requires tens MW; O(10 4 ) sq. ft. –Green innovations essential, will likely be mandated in US by law: Current US data centers 61bkWh Will double by 2011; peak 12 GW, $7.4b per year electricity cost Software development costs (Boehm et al. 1981): where β ~ ratio of academic to commerical software construction costs (~ ); can mitigate through re-use (see adjacent) LSST computing costs ~25% of project; order of magnitude smaller data rates than SKA (~ tens of TB per night). WBS 2.4.5: Related computing cost components NCSA Petascale Computing Facility (20,000 ft 2 machine room; chilled water with free cooling 6/12 months) (Kemball et al., 2007, “A component-based framework for radio-astronomical imaging software systems”, Software: Practice & Experience, 38 (5), )

US SKA May 2008 CPG work plan continues per project execution plan. Q2-Q3/08: Hire CPG postdocs at MIT, & UIUC. 08/08: URSI GA 2008 (presentations and associated CPG meeting) 10/08: First release of cost-feasibility LNSD model … CPG upcoming activities