Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana.

Slides:



Advertisements
Similar presentations
Academic Institutional Management System. Developed by ACG Global, Inc., Houston, Texas. Developed by ACG Global, Inc., Houston, Texas. Exclusive Distributor.
Advertisements

Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana.
An Overview of The Senior’s Choice Membership Model.
LH - Project Setup ICH UG KUL, Michael Uebber Director Global Financial Clearing, Closings & Group Functions.
UGDIE PROJECT MEETING Athens September WP6 – Assessment and Evaluation  Evaluation Results  Deliverable D 13 (first release issued and delivered.
School On Track. Outlines Introduction Modules Advantages Future Expects Budget Support.
SRC Application Process Fall 2014 Version: November 12, 2014.
JACoW Team Meeting JACoW Database Scientific Program Management System (SPMS) Registration Module Matt Arena, Fermi National Accelerator Laboratory.
WP3- Development: Milestone M3 Lisbon 30 January 2004 National Technical University of Athens.
F-MAN Meeting 10/11 April 2003 EDC Presentation EDC  The TSM ground application OBT Centralised SMS hub  Communications Interface Issues & possibilities.
UGDIE PROJECT MEETING Lisbon – January WP8 - Project Management Contractual obligations following the 2 nd Annual Review fulfilled –Deliverable.
UGDIE PROJECT MEETING Athens – September WP8 - Project Management 2 nd Cost Statement –Bank transfers processed on September 6 th –TECNO “virtual”
Measuring Queuing and System Delay Using Click Modular Router By Caroline Williams.
Crete Meeting April 10 th – 11 st, 2003 WP3 Sciro Presentation.
MARKET IN TRAFFIC LIGHTS Designed for the next Users Private Investors Professional investors in Broker companies Run mode: Real Time combined with the.
Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana.
UGDIE PROJECT MEETING Athens – September On-site Final Review Venue and dates –Genoa, UGDIE + SCIRO premises –December 2 nd (afternoon) –
A REVOLUTION IN CHARITY FUNDRAISING. OUR MISSION   Our goal is to enable the use of wireless resources and technology to support good causes by solving.
Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana.
1 Generic SMS Gateway for AtLink Enterprise Voice Integration Instructor: Dr. Kwok-Bun Yue, Ph.D Mentor: Mr. Dilhar De Silva Team #6: Dang Nguyen Huy Do.
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
CERN IT Department CH-1211 Genève 23 Switzerland t Evolution of telecom services GTPA November 27 th 2014 IT Dept. CS group.
Steps Of NSAP-CPSMS DBT 1.Registration of beneficiary by getting CPSMS beneficiary Id. 2.Update rejected cases from CPSMS response file. 3.Compute pension.
Course 6421A Module 7: Installing, Configuring, and Troubleshooting the Network Policy Server Role Service Presentation: 60 minutes Lab: 60 minutes Module.
Centralized SIM Server for iGATE/VoIPBOX GSM FX / UMTS systems
European Datacomm The Internet Tracking Solution.
University of Montenegro Faculty of Electrical Engineering Work Package 7 Review of the project activities and objectives Fostering innovation based research.
1 On Board Terminal  Technical characteristics  Functions  Messages  SIM requirements  Sensors for OBT  Installation.
Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana.
Course Presentation EEL5881, Fall, 2003 Project: Network Reliability Tests Project: Network Reliability Tests Team: Gladiator Team: Gladiator Shuxin Li.
Author: Sali Allister Date: 21/06/2011 COASTAL Google Analytics Report March 2011 – June /03/2011 – 08/06/11.
Author: Sali Allister Date: 09/12/2010 COASTAL Google Analytics Report September 2010 – December /09/2010 – 08/12/2010.
Opton 4 short presentation1 Opton 4 User friendly operating software for Symmetron’s Stylitis data loggers.
Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana.
Frankfurt (Germany), 6-9 June Lars Garpetun – Sweden – Session 6 – 0415 EXPERIENCES FROM OPERATIONS AFTER A FULL- SCALE SMART METERING ROLLOUT REGARDING.
Directory assistance services Retiring the number 12 and replacing it with six-digit numbers beginning with 118 Meet the Press Friday 4 February 2005.
Energy Insights Online Energy Insights Online Demonstration Kevin Bricknell EDS Program Manager September 23, 2009.
 Advanced Metering Working Group (AMWG) Update to RMS 1 August 5, 2014.
Alaska Beacon Adapting the Iridium Network to Enable Search and Rescue John Bystroff,The Boeing Company Ignacio Gómez,KinetX Inc Robert Kikta,NexGen Communications.
REDCap Overview Institute for Clinical and Translational Science Heath Davis Fred McClurg Brian Finley.
Online Library of Knowledge Juro4C – Introduction.
GIST 19: GGSPS status Status of GGSPS development and operations Andy Smith GGSPS software project manager.
3 rd Party Registration & Account Management SMT Update To AMWG March 24, 2014.
What is J2EE Platform The Java 2 Platform Enterprise Edition (J2EE) defines the standard for developing multitier enterprise applications.
1 Update on the 867_03 Contingency Plan Nancy Hetrick February 25, 2003.
Computerized Sign In/Sign Out System Group Memebers: Mike Bergandi Thomas Fulbright Kyle Hancock
IAD Enhancements User Pays User Group 20 th November 2008.
Labcheck Next Generation Quick Start Guide Equipment Management.
Lisbon, Report on OBT installations -50 OBTs and sensors to be installed on wagons: - 35 CP (sggmrss – flat wagon with 102 ton cargo capacity)
EduWare - School Management System Overview of Student Management System Components.
Connectathon 2009 Gazelle: HL7 V2 EVS, PIX Tests Agents, Automated Testing Project plans for Connectathon 2009 (February 23 rd -27 th 2009 ) November 14.
1 Deploying Measurement Systems in ESnet Joint Techs, Feb Joseph Metzger ESnet Engineering Group Lawrence Berkeley National Laboratory.
IT Brazil Application Architecture GI3 – Suggested SMS Architecture Overview V1.
Employment Tax Incentive (ETI) Real Case Study – Tax Free Cash What you don’t know Copyright 2015.
Does the data show that New Zealand should have beaten Australia in the Rugby World Cup final 2015?
PMC-592 HMI's Front Panel Operation
REDCap General Overview
ACCU meeting - D.Chromek-Burckhart Users’ Office EP
MARS Taskforce RMS Update December 9, 2009.
Welcome to Microsoft Support Number Welcome to Microsoft Support Number For More Visit on:
New York State Report Cards
Slate Elizabeth M. Salisbury
Financial Energy Management System (FEMS) Re-engineered by IT Department IT, H.O. Mumbai. 26 November 2018.
Temporary Capacity Restrictions: TCR WG & TCR tool
ME 280 Lab Final Project Begins November 5th for sections 4 and 6, and November 9th for sections 1, 2 and 3 Due December 2nd for sections 1, 2 and 3 and.
2nd Joint Workshop Pesticides Statistics 2005 Transition Facility Statistical Cooperation Programme Phare Programme Further steps.
Integrated Math & Science
Preparing for a move to the Cloud
Launching of an EAP campaign (EAP =Enquête annuelle de production => annual survey on industry) EUROSTAT – 15/16 october 2013.
Presentation transcript:

Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana D.O.O. SCIRO S.p.A. SIGMA Conseil S.a.r.l. Università degli Studi di Genova F-MAN Project – Final Review Genoa, December 2 nd – 3 rd, 2004 EDC HUB statistics Data relevance, SMS latencies, Power Consumption, Costs

Final Review Genoa, December 2 nd - 3 rd, Architecture overview SMS PDU (binary messages) … Archiving, logging, PARSING (Bin. XML) SMTP ( ) XML

Final Review Genoa, December 2 nd - 3 rd, Data relevance messages handled ( – ) Extracted data:  Host time (UTC)  reception of the SMS by the HUB.  OBT ID  OBT generation time (TX time - UTC)  time the OBT did send the SMS.  “User” (PI, SNCF, CP)  Message type (0x80, 0x82, 0x84, 0x90 …)  Power consumption  Position time  Event time (cfr. Excel file “all.xls”)

Final Review Genoa, December 2 nd - 3 rd, Message latencies (1) Host time (reception) – OBT generations time (send) Restrictions:  Only (“single” record 0x84 messages);  Valid Position & Event times;  For PI OBT’s only (differences between CP, PI and SNCF OBT’s prove to be not significant);  2850 records are useable data AVERAGE LATENCY: 2496 seconds (42 minutes) MEDIAN LATENCY: 63 seconds (cfr. All_d.xls)

Final Review Genoa, December 2 nd - 3 rd, Message latencies (2)

Final Review Genoa, December 2 nd - 3 rd, Energy consumption (1) Calculation base:  Host time, OBT ID, energy consumption;  Battery capacity: PwrCpt maximum value = 4651;  Result per OBT;  PI & SNCF OBT’s;  Different setup (messages per day) for PI and SNCF;  Worst Case scenario calculations

Final Review Genoa, December 2 nd - 3 rd, Energy consumption (2) SNCF Based on data in “sncf_power.xls”  Maximum energy consumption per month = 85 units (approximately 1.83 %);  Average power units used = 500;  Energy units remaining: 4651 – 500 = 4151 Months before alarm: 4151/85 = 48 months  (november 2008)

Final Review Genoa, December 2 nd - 3 rd, SNCF energy consumption percentage graph

Final Review Genoa, December 2 nd - 3 rd, Energy Consumption (3) PI Based on data in “pi_power.xls”  Maximum energy consumption per month = 208 units (4.5 %);  Average power units used = 1000;  Power units remaining: 4651 – 1000 = 3651 Months before alarm: 3651/208 = 17 months  (March/April 2006)

Final Review Genoa, December 2 nd - 3 rd, PI energy consumption percentage graph

Final Review Genoa, December 2 nd - 3 rd, SMS cost estimate Calculation base (cfr. FMAN_SIM_sept.xls)  Mobistar billing details from May -> September 2004;  Total number of SMS messages PI: 4031;  Total number of SMS messages SNCF: 3589;  No billing data for CP available; CP does not use “EDC” SIM cards. SMS cost PI: € 0.36 SMS cost SNCF: € 0.35 Fixed fee for CP SIM cards: € 0.02  0.05

Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana D.O.O. SCIRO S.p.A. SIGMA Conseil S.a.r.l. Università degli Studi di Genova Questions & Answers EDC whishes to thank Every member of the F-MAN team For the very constructive collaboration. EDC Heidestraat 257 B-2070 Zwijndrecht Belgium