BRITE-Constellation Overview and Status Feb 2010 BRITE - Constellation BRIght Target Explorer BRITE - ATBRITE - CABRITE – PL UniBRITE BRITE-AUSTRIA BRITE-PL1.

Slides:



Advertisements
Similar presentations
EUCLID : From Dark Energy to Earth mass planets and beyond Jean-Philippe Beaulieu Institut dAstrophysique de Paris Dave Bennett University of Notre Dame.
Advertisements

Advanced CCD Workshop Arne A. Henden
000509EISPDR_SciInvGIs.1 EIS Performance and Operations Louise Harra Mullard Space Science Laboratory University College London.
A Search for Earth-size Planets Borucki – Page 1 KEPLER; Data Validation and Follow Up Observations CoRoT Symposium W.J. Borucki & the Kepler Team 5 February.
A NEW CTE PHOTOMETRIC CORRECTION FORMULA FOR ACS Marco Chiaberge TIPS meeting 05/16/2012.
PHOTOMETRIC AND SPECTROSCOPIC MONITORING OF DSCT, GDOR AND BCEP VARIABLES Recent and future observations Ennio Poretti INAF – Osservatorio Astronomico.
K2 Kepler’s Second Mission 1 K2 - a 2-wheel Kepler mission; The second highest peak in the world, a worthy ascent Steve B. Howell NASA Ames Research Center.
Less is More S. R.Kulkarni Director, Caltech Optical Observatories Chairman, SIM-Lite Science Team.
Low Energy, Low Cost Swift A design experiment June 2010.
Using DELPHI for Weak Lensing Measurements: Science Return and Mirror Size Jes Ford, JPL, UNR SURF /21/07 Mentor: Jason Rhodes Co-mentor: David Johnston.
Photometric follow-up of transiting planet candidates Marton Hidas UNSW.
HST WFC3 IR channel: 1k x 1k HgCdTe detector, QE 80% 18 micron pixels (0.13”/pix), ~2’x2’ FOV Detector sensitivity engineered to cut off above 1.7 micron,
BRITE-Constellation Meeting Warzaw Feb 2010 BRITE - Constellation BRIght Target Explorer BRITE-AUTBRITE-CAN BRITE-POL.
BRITE-Constellation Nov BRITE Satellites Cubic form factor (20cm/side) with mass < 8kg Cubic form factor (20cm/side) with mass < 8kg Pre-deployed.
The Search for Earth-sized Planets Around Other Stars The Kepler Mission (2009)
The Transient Universe: AY 250 Spring 2007 Extra Solar Planets Geoff Bower.
Extrasolar Planets.I. 1.What do we know and how do we know it. 2.Basic planetary atmospheres 3.Successful observations and future plans.
Asteroseismology: Looking inside stars Jørgen Christensen-Dalsgaard & Hans Kjeldsen Aarhus Universitet Rømer.
1 Status of MOST James Wells. How Are We Doing? On June 30 th, MOST will enter its 8 th year of operations! You Are Here (11.9 AUs from the Sun)
SDW20051 Vincent Lapeyrère LESIA – Observatoire de Paris Calibration of flight model CCDs for CoRoT mission.
Constellation Orion Visible Light Constellation Orion Infrared Light.
LIM: Near IR from a mini-satellite Dani Maoz. HST WFC3 IR channel: 1k x 1k HgCdTe detector, QE 80% 18 micron pixels (0.13”/pix), ~2’x2’ FOV Detector.
WIRE SATELLITE PHOTOMETRY OF ECLIPSING BINARY STARS John Southworth H Bruntt D L Buzasi.
SDW2005, juin, Taormina The Corot Space instrument.
X-ray Timing and Polarization mission & instrumentation DONG Yongwei Center for Particle Astrophysics Institute of High Energy Physics, Chinese Academy.
Earth Observation, Navigation & Science Page 1 Capacity Final Presentation, , Estec, Noordwijk Report for WP 3300 WP 3300.
BRITE-Constellation consists of six nano-satellites: UniBRITE and BRITE-AUSTRIA (TUGSAT-1) are funded by Austria, two more by.
The Gaia mission Data reduction activities in the UK Floor van Leeuwen, IoA.
A SEMINAR ON HUBBLE SPACE TELESCOPE PRESENTED BY: HARI OM ELECTRONICS & COMMUNICATION REG NO SECTION-C ROLL NO.– 123.
BRITE-Constellation currently consists of two satellites, UniBRITE and BRITE-AUSTRIA (TUGSAT-1) and two satellites to be funded by the Canadian Space Agency.
STATUS REPORT OF FPC SPICA Task Force Meeting March 29, 2010 MATSUMOTO, Toshio (SNU)
The Hard X-ray Modulation Telescope Mission
The Chinese SONG proposal: scientific concerns Jianning Fu (Beijing Normal University) and Chinese SONG team Beijing ─ March 29, 2010 The third workshop.
SRG 1 X-RAY Astronomy 2009, Bologna, 11 September, 2009 Spectrum-Roentgen-Gamma astrophysical project, current status Mikhail Pavlinsky (IKI, Moscow) on.
10/9/ Studying Hybrid gamma Doradus/ delta Scuti Variable Stars with Kepler Joyce A. Guzik (for the Kepler Asteroseismic Science Consortium) Los.
Astronomy & Astrophysics Advisory Committee (AAAC) May 11, 2006 Vladimir Papitashvili Antarctic Sciences Section Office of Polar Programs National Science.
Stellar variability monitoring in open clusters with mini-SONG X.B. Zhang National Astronomical Observatories, Chinese Academy of Sciences.
A Search for Earth-size Planets Borucki – Page 1 Roger Hunter (Ames Research Center) & Kepler Team March 26, 2010.
Database of Variable Stars Bingqiu Chen Dept of Astronomy Beijing Normal University.
G. Ricker (MIT) George Ricker MIT Kavli Institute Transiting Exoplanet Survey Satellite David Latham SAO 30 May 2008.
CDE CDR, September 14, 2004 Your Position, Your Name 1 GATS AIM Science Team Meeting January 23-24, 2007 CIPS Calibration Review, Aimee Merkel, Bill McClintock.
1 WB/lct CCD OVERVIEW Kepler will have 42 CCDs 2,200 column x 1,024 row full frame CCDs Field of View (FOV) > 100 square degrees (113 w/ vignetting)
Exoplanets Complementary Observations Working Group Report …
AST3-1 photometry from Dome A Bin Ma, Peng Wei, Yi Hu, Zhaohui Shang NAOC AST3
1 Optical observations of asteroids – and the same for space debris… Dr. D. Koschny European Space Agency Chair of Astronautics, TU Munich Stardust school.
A Search for Earth-size Planets Borucki – Page 1 W.J. Borucki & Kepler Team (NASA Ames Research Center) NASA Academy 14 July 2010.
1 AAS Meeting, San Diego – January 13, 2005 Swift-UVOT Post-Launch Status Pete Roming S. D. Hunsberger, C. Gronwall, J. A. Nousek, A. A. Breeveld, K. O.
Science Lessons Learned from TESIS and their Relevance to SWAP V. Slemzin, LPI PROBA 2 SWT, La Roche, 14 June 2010.
Expectations and Limitations of Kepler Ground-Based Follow-Up Observations Joanna Molenda-Żakowicz Uniwersytet Wrocławski, Instytut Astronomiczny ul. Kopernika.
June 6-9, 2006COROT Week 10, Nice PMS Thematic Team Activities since CW9 K. Zwintz (Institute of Astronomy, Univ. Vienna, Austria) & members of the PMS.
1 Transiting Exoplanet Survey Satellite Daryl Swade Archive Team Meeting June 16, 2014.
Spitzer Space Telescope
1 John Nousek & David Burrows (Penn State University) Alberto Moretti (Osservatorio Astronomico di Brera) X-Ray Telescope (XRT): Performance after Five.
KEPLER TABLE OF CONTENTS Table of Contents: Mission Overview Scientific Objectives Timeline Spacecraft Target Field of View Transit Method Johannes Kepler.
July 12, 2004Pulsating PMS stars Pulsating Pre-Main Sequence Stars in Young Open Clusters K. Zwintz Institute of Astronomy, Univ. Vienna, Austria
EXPLORE/OC: Photometry Results for the Open Cluster NGC 2660 K. von Braun (Carnegie/DTM), B. L. Lee (Toronto), S. Seager (Carnegie/DTM), H. K. C. Yee (Toronto),
ISUAL Design Concept S. Mende. SDR 7 Jun NCKU UCB Tohoku ISUAL Design Concept S. Mende Sprite Example Sprite Image obtained by Berkeley/NCKU 1999.
July 25th, 2000WFC3 Critical Science Review1 Performance Summary in Key Science Areas Verify that WFC3 as designed is capable of carrying out the WFC3.
Transient Identification and Classification with WISE Doug Hoffman R. Cutri & T. Jarrett The Eventful Universe, 2010.
for Lomonosov-GRB collaboration
The Kepler Mission S. R. Kulkarni.
The first light of the Corot telescope.
Ultra-Violet Imaging Telescope for ASTROSAT
Single Object & Time Series Spectroscopy with JWST NIRCam
RR Lyrae Research with the Kepler Mission
First Assessments of EUVI Performance on STEREO SECCHI
N0--> N1 Chain Includes corrections of all the known instrumental perturbators - electronics: offset, EMI, gain - Time integration - Sky background -
MOST Guide Star Photometry
Observational Prospect of NIREBL
CHEOPS - CHaracterizing ExOPlanet Satellite
Presentation transcript:

BRITE-Constellation Overview and Status Feb 2010 BRITE - Constellation BRIght Target Explorer BRITE - ATBRITE - CABRITE – PL UniBRITE BRITE-AUSTRIA BRITE-PL1 BRITE-PL2 BRITE-CA1 BRITE-CA2

BRITE-Constellation Overview and Status Feb 2010 BRITE – Constellation Management BRITE - ATBRITE - CA BRITE - PL W. Weiss (IfA) M. Breger (IfA) O. Koudelka (IKS/TUG) R. Kuschnig (IfA) A. Schwarzenberg-Cerny (CAC) P. Orleanski (SRC) A. Pamiatnykh (CAC) A. Pigulski (Wroclaw Univ.) BEST BRITE Executive Science Team A. Moffat (U Montreal) S. Rucinski (U Toronto) S. Mochnacki (U Toronto) J. Matthews (UBC) BIAST - BRITE International Advisory Science Team: 22 Members

BRITE-Constellation Overview and Status Feb 2010 BRITE Mission Goals  high precision photometry (~mmag)  selected very bright stars (<4 mag)  up to 15 primary targets per field (24deg FOV)  obtained during >= 15min per orbit (100min)  in two wavelength regions (blue-red)  long time base observations (180 d/y/field)  all sky access including polar regions  expected lifetime 2-3 years per satellite

BRITE-Constellation Overview and Status Feb 2010 BRITE Photometry 101 min BLUE - RED

BRITE-Constellation Overview and Status Feb 2010 BRITE Sky BRITE: BRI ght T arget E xplorer

BRITE-Constellation Overview and Status Feb 2010 BRITE Target Stars Selection  42 proposals have been submitted  13 PI‘s and their teams Austria (15), Australia (1), Belgium (2), Bulgaria (1), Canada (4), Croatia (1), Germany (6), Iran (1), Poland (2), Spain (1), Switzerland (1), U.K. (3) and USA (3) O, B and Be stars, beta Cephei stars, hot Supergiants, delta Scuti variables, gamma Doradus pulsators, roAp / CP stars, red Giants, eclipsing binaries and more BRITE CANDIDATE TARGET STAR CATALOG 4979 entries

BRITE-Constellation Overview and Status Feb 2010 BRITE - Satellites  nano-satellites  20cm cube spacecrafts <8kg  3 axis pointing control  LEO sunsynchronous (polar) orbit  small aperture (3cm) telescopes  wide (24deg) field of view  one instrument is RED sensitive one BLUE

BRITE-Constellation Overview and Status Feb 2010 BRITE Orbit and Observing Strategy  Low Earth Orbit (LEO) Sun-Synch - Dawn-Dusk  820 km, LTDN 6AM (BRITE-AT)  Orbit Period ~ 101min  15-40min/per orbit per field  1-3 fields per orbit  180 days per year  300 days per year (near pole) Sun

BRITE-Constellation Overview and Status Feb 2010 BRITE – Satellite Design

BRITE-Constellation Overview and Status Feb 2010 BRITE – Satellite Design BRITE Attitude Determination and Control System the first high performance 3 Axis ADCS for nano-satellites

BRITE-Constellation Overview and Status Feb 2010 BRITE-AUT Launch Madras SFL is contracted to launch BRITE-AT Q1-2011

BRITE-Constellation Overview and Status Feb 2010 BRITE Instrument - Telescope 5 lens system plus filter & baffle for a 24 deg cicular FOV, telecentric low distortion, no vignetting RED design BLUE design

BRITE-Constellation Overview and Status Feb 2010 good performance at high (+20C) temperatures low power consumption and reasonable price ReadNoise ~15e rms ! KODAK KA11002 BRITE Detectors

BRITE-Constellation Overview and Status Feb 2010 BRITE - Filters

BRITE-Constellation Overview and Status Feb 2010 BRITE Point Spread Function BRITE Blue PSF 5 deg offsets 8 pixels diameter – 80 pixels carry signal ~30“/pixel

BRITE-Constellation Overview and Status Feb 2010 BRITE – Field Of View 2670 pixel 4000 pixel 30“/pixel

BRITE-Constellation Overview and Status Feb 2010

(32x32pix) Raster

BRITE-Constellation Overview and Status Feb 2010 BRITE Onboard Data Processing processed data: sections: R nnn B backgrounds R nnn A apertures for each background median and sigma are calculated + the sum of signals values encompassed in the two apertures a total of 10 values H pix V pix R nnn B4 R nnn B2 R nnn B3 R nnn B1 BW pix ROI R nnn R nn A1 R nnn A2 X1 Y1 Y2 X2 BW... width of background [pixels]

BRITE-Constellation Overview and Status Feb 2010 BRITE Photometric Performance mag(V) = 0-> 1.3 sec / 14 exp per min mag(V) = 2-> 8.0 sec / 5 exp per min mag(V) = 4-> 50.0 sec / 1 exp per min mag(V) scatter

BRITE-Constellation Overview and Status Feb 2010 BRITE Science Ops Software Science Data Generation Code IFA Responsibility

BRITE-Constellation Overview and Status Feb 2010 BRITE Ground Station(s)  Primary Ground Station: IKS – TU Graz  Additional Locations: UTIAS – Toronto Canada TU Wien IfA Uni Wien CAC Warsaw UBC Vancouver

BRITE-Constellation Overview and Status Feb 2010 BRITE-AT Project Timeline  development of the hardware and software hardware and software  completion of two satellites June 2010 satellites June 2010  launch targeted for January 2011 January 2011 BRITE-PL1 launch late 2011, BRITE-PL2 end 2012 BRITE-CA1&2 launch late 2012

BRITE-Constellation Overview and Status Feb