EDGE™ Centering Magnet Device P08028 By: Aaron Burger.

Slides:



Advertisements
Similar presentations
2 Careers in Machining Technology Chapter Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives List the.
Advertisements

OverviewOverview – Preparation – Day in the Life – Earnings – Employment – Career Path Forecast – ResourcesPreparationDay in the LifeEarningsEmploymentCareer.
Artificial Limb Project By Casey Dill. Mission Statement This project will improve upon existing plans for an artificial arm with the same capabilities.
MSD-I Project Review Modular Motion Tracking Sensors 1.
EDGE™ Concept Level Project Plan P08043 – Magnet Centering Device Aaaron Burger (Mechanical Engineer)
QUALITY MANAGEMENT DEFINITIONS AND CONCEPTS QUALITY MANAGEMENT TOOLS QA / QC PROCESS COMPUTERS AND PROJECT QUALITY.
INDUSTRIAL & SYSTEMS ENGINEERING
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
IGen Fuser Bearing Project P Agenda Meeting Timetable Start Time Review Topic 2:20Introductions 2:25Project Description 2:35Customer Needs 2:40Risk.
EDGE™ Concept Level Project Plan P09452 Compressor Part Fabrication and ReVamp Snehapriya Rao (ME) Ed Budriss (ME) Alex Scarangella (ME) Edward Wolf (CE)
Characterization of Optical Devices Using Magnitude and Group Delay Measurement Haiqiao Lin, Undergraduate Student Dr. Christi Madsen, Professor Department.
MSD-II Project Review Modular Motion Tracking Sensors 1.
Centering Magnet Device P08028 A.Burger J. Lu D. Falcinelli M. Brown.
Project Status Update P09457 – Process Improvement Project Eric MacCormack (IE) Colin Roy (IE)
EDGE™ Final Project Plan P09701 – Corning Tropel LightGage™ Metrology System Matthew Bradley (ME) Images Courtesy of Corning Tropel.
Detailed Design Review of Magnetic Field Centering Device Project # P08028 “Develop a Design and Methodology to Ensure the Concentricity between the Magnetic.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
Detailed Design Review Project P13363 Members: Justine Converse (IE) James Cover (CE) Alexander Eschbach (EE) Jason Hang (ME) Ashley Trode (EE) Guide:
SOFTWARE QUALITY ASSURANCE Asst. Prof. Dr. Selim BAYRAKLI Maltepe University Faculty of Engineering SE 410.
Software Engineering Principles Chapter 3 From Software Engineering by I. Sommerville, Slide 1 project managementorganizing planning scheduling Learning.
Sponsored by Wegmans P Automation/Improvement of Packaging on the Cookie Line Stephanie Rager Bruno Coelho.
The BIM Project Execution Planning Procedure
OverviewOverview – Preparation – Day in the Life – Earnings – Employment – Career Path Forecast – ResourcesPreparationDay in the LifeEarningsEmploymentCareer.
LECTURE 1 COMPUTERS IN INDUSTRIAL MANUFACTURING Zolkarnain Marjom
Temperature Controller for Infrared Paint Curing September 13, 2001 Dec01-11 Team Members Michael Burman, CprE Jonathan Johnson, EE Matthew McMullen, CprE.
RUP Implementation and Testing
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
Week12 Technology in the e-Factory The roles that technology is playing in the e-Factory: Sensors Connections Actuation Control Systems Integration Industry.
Problem Statement: Broaden participation and collaboration in nanoscale science by creating low cost, remotely accessible instrumentation. Phase II: Nanomanipulator.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 General List of Tasks by Performance.
1 CERTIFIED SOLIDWORKS ASSOCIATE (CSWA) EXAM Nov 26, 20119:00-12:00 Dec 3, :00-12:00 SEB1015 NOTES We’ll take registrations in November but you’ll.
©Ian Sommerville 2000 Slide 1 Project management l Organising, planning and scheduling software projects l Objectives To introduce software project management.
Nick Dominesey Matthew Myers Michael Edson Ellie Sanford Chris Smith Jason Inman.
through Introduction  Particle Imaging Velocimetry (PIV) uses a sheet laser beam to illuminate particles that cross the sheet.  The particles.
DAVID ANDERSON RYAN DUNN BRYON ELSTON ELIZABETH FISCHER ROBERT MENNA GUIDE : BILL NOWAK CUSTOMER: DR. MICHAEL SCHRLAU (ME DEPARTMENT) P13375 : Computer.
Path The purpose of this project is to design a universal data recording device to monitor the health of a Dresser-Rand compressor during operation. In.
Study Guide Project By: Ryan Carrier.
THROUGH NERANJAN DHARMADASA JAMES BROWN P09451: Thermo-Electric Module for Large Scale Systems.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
Project Final Presentation Joe Featherall.
BLDC Motor Speed Control with RPM Display. Introduction BLDC Motor Speed Control with RPM Display  The main objective of this.
EDGE™ Final Project Plan Presentation P08043 – Mass Spectrometry Sample Preparation.
Fish Tank Project Introduction ME 121Portland State University Mechanical and Materials Engineering.
ARM and GPS Based Transformer monitoring system with area Identification Student Name USN NO Guide Name H.O.D Name Name Of The College & Dept.
Prof R T KennedyEMC & COMPLIANCE ENGINEERING 1 EET 422 EMC & COMPLIANCE ENGINEERING.
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
EDGE™ Preliminary Project Plan P09102 – METEOR Stage Separation System JJ Guerrette (ME)
بسم الله الرحمن الرحيم وبه نستعين
CNC FEED DRIVES Akhil Krishnan G M.Tech 1. CONTENTS 1.Introduction 2.Requirements of CNC feed drives 3.Servo motor 3.1 Servo drive control 3.2 Components.
CNC FEED DRIVES.
XBee Based Motor Control for Farmers
1967 Industrial Arts.
Project Overview CNC Introduction Applying CNC Designing for CNC
Managing Operations, Quality and Productivity
Turbomachinery Flow Visualization P08453
Chapter 2 Design Tools.
Assistant Professor of Computer Science Washington State University
Concept Level Project Plan P08008 – ArcWorks Process Improvement
P07021: Instrument to Detect Thromboemboli
Kris Kidder | John Dolan | Shay Stanistreet | Anthony Miuccio
Robotic Needle End Arm Effector for Integration With CT Scan
Robotic Needle End Arm Effector for Integration With CT Scan
Centering Magnet Device P08028
Active Reciprocating Compressor Valve Assembly P16452
Project Readiness Review P10029 – Air Muscle Artificial Limb
Introduction To CAD/CAM
Final Status Update P09006 – Upper Extremity Exerciser
Team P16228: Magnetically Levitated Propeller
Presentation transcript:

EDGE™ Centering Magnet Device P08028 By: Aaron Burger

EDGE™ Concept Level Project Plan Project Name –Magnet Centering Device Project Number –P08028 Project Family –Artificial Organ Engineering Start Term – End Term – Faculty Guide –Dr. Steven Day (Mechanical Engineering) Faculty Consultant –Prof. John Wellin (Mechanical Engineering) Faculty Consultant –Dr. Matthew Marshall (Industrial Engineering)

EDGE™ Confidential Disclosure Agreement

EDGE™ The LVAD Heart Pump The LVAD is … a device which assists the heart in the circulation of blood throughout the body a pump that is mechanically bearing free, therefore the longevity is significantly greater than current heart pumps. has a rotor which is levitated and held axially in place by magnets and needs to have the bushings and magnetic fields to the rotor be concentric to the rotor’s radial position

EDGE™ Why center the rotor’s components? The LVAD heart pump is levitated using magnets The positioning of the LVAD’s rotor is done by monitoring the magnetic field of magnets Creating a concentric magnetic field is crucial in the success of the LVAD heart pump Because the magnets are placed on bushings, having bushings concentric to the diameter is also key in the success

EDGE™ Proposed Designed 1.Center the bushings using a laser and sensor which can map the bushings concentricity and move the materials accordingly. 2.Place a magnet on the centered bushing, then map the magnetic field and move magnet accordingly. 3.Process of centering both the magnetic field and bushing is completely automated. 4.Time of production is lessened. 5.First step in the mass production of the LVAD heart pump

EDGE™ Current Method of Centering Magnets Linear Stages Magnet pusher & magnet Sensor

EDGE™ Hall Effect Magnet & Sensor Sensor Hall Magnet

EDGE™ Sensitivity of HESA on the X-axis Voltage X-axis

EDGE™ Illustration of a non-concentric magnetic field Magnetic Field Sensor Magnet y-axis x-axis

EDGE™ Pushing the magnet Sensor A force physically moving the magnet

EDGE™ New position with a concentric magnetic field After the magnet has been physically moved the magnetic field is concentric with the sensor

EDGE™ Current Method of Centering Bushings Dials which read the position of the bushing

EDGE™ Laser Calipers SensorLaser Bushing

EDGE™ Laser Caliper cont. SensorLaser A force to physically move the bushing

EDGE™ Laser Caliper cont. SensorLaser Bushing is concentric with the diameter

EDGE™ Risks & Constraints Implementing a working LabVIEW program Machining Integration of systems (Sensors & Positioning) Motor Control System Linear Slides & Stages: –Backlash –Hysteresis –Accuracy –Uni-Directional Repeatability –Bi-Directional Repeatability

EDGE™ Staffing Requirements Mechanical Engineer 1.) Team manager, responsible for organizing the meetings and setting up team with materials and resources. Documentation of the progress of the project is an essential part of the manager’s responsibility. In addition to these tasks, the manager will assist others in their assignments. 2.) The mechanical engineers should be comfortable in the machine shop. Possess the ability to machine precise parts for the test rig, because a concentricity of 10 microns is needed. The precision of machining is essential in the success of this project. In addition to machining, the mechanical engineers input and ideas are important in the designing of a new centering test rig. Because a test rig already exists, persons with ingenuity and imagination will help in the designing of a new test rig. 3.)The mechanical engineers need to be comfortable with a computer aided design software, SolidWorks or AutoCad. As the project progresses, an organized drawing package needs to be assembled and a bill of materials needs to documented for the budgetary purposes. As the designing of parts becomes less frequent, the role of these engineers will be assisting others with various operations for this project such as the LabVIEW programming, circuitry and machining.

EDGE™ Staffing Requirements cont. Electrical Engineers 1.)Having an electrical engineer familiar with motion controls and sensory positioning is a crucial function for this project. Because controlling the motion and position of the bushing and magnet through a computer software and sensors, the electrical engineer needs to control the voltage and current from these sensors and motion devices to ensure an accurate and repeatable process. The electrical engineer will provide the wiring necessary to power the different devices on the test rig. Industrial Engineer 1.)Implement test procedures to insure that the precision and specs. are met. The documentation of the process and procedures will provide crucial information that will help in the success of the project. Statistical analysis performed by the industrial engineer will provide a design of an experiment data for the finished test rig and provide a liability analysis on the purchased parts.

EDGE™ Week 1 Introduction to the LVAD Heart Pump –how the heart pump works –give team reports related to the LVAD project and current magnet centering device –have team sign confidential disclosure agreement Have team perform a centering test on a magnet and get a feel for the current test rig Benchmark the current test rig –identify all the parts on the current test rig –illustrate the problems with the current test rig

EDGE™ Week 2 Have team members split up into areas of their concerns: 1. Mechanical Engineers – research linear stages and slides; come up with ways of correcting problems with them 2.Electrical Engineer – research methods of positioning and instituting sensors for that purpose. Get familiar with LabVIEW 3.Industrial Engineer – research ways on organizing material for test protocols and procedures. Compile the research at the end of the week and start designing a magnet centering device.

EDGE™ Week 3 Having brainstormed the team member’s reports and initialized a design of the device, ask certain professors for their opinions and inputs on the team’s decisions. Dr. Day – opinion on test rig design ideas Dr. Marshall – Statistical Analysis of test and liability analysis of purchased parts Prof. Wellin – LabVIEW Programming Machine Shop for machining advice

EDGE™ Resources Needed Computer with programming capabilities, i.e. LabView, SolidWorks, AutoCad, Cadence etc. Area for designing and building of test rig Machine shop equipment and supplies Measuring instruments Motor controls, linear slides, laser calipers or laser positioning devices More will be added as time progresses