Luminosity Monitor MWPCs. Status and plans. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg, 26.04.2010.

Slides:



Advertisements
Similar presentations
BigBite Wire-Chamber Status Report Brandon Craver University of Virginia Hall A Collaboration Meeting June 23, 2005.
Advertisements

SINBAD Ralph W. Aßmann Leading Scientist, DESY LAOLA Collaboration Meeting, Wismar
Ties Behnke, LP, EUDET, Germany etc: Status Report. 1 The LP-TPC Fieldcage Project Goal: design, develop and build a field cage for a “Large Prototype”
K. Potter RADWG & RADMON Workshop 1 Dec WELCOME TO THE 4th RADWG & RADMON WORKSHOP 1 December 2004.
20 June 2008E906 Collaboration Meeting1 Tracking Chambers for FNAL E906 Edward R. Kinney University of Colorado, Boulder, USA Overview of Station 1 Status.
Schedule Remove ARGUS experiment - Fall 2009 Disassemble and ship OLYMPUS detector - Spring 2010 Ship target and beamline – Fall 2010 Modify DORIS beam-line.
HERMES tracking for OLYMPUS. Part #1. Detector survey. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
Downstream PID Review Alan Bross MICE CM 16 October 8, 2006.
THE BRIEF HISTORY OF LuMo CONSTRUCTION FROM MIT TO HU OZGUR ATES HAMPTON UNIVERSITY OLYMPUS COLLABORATION MEETING APRIL 2011.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
E166 “Polarized Positrons for Future Linear Colliders” John C. Sheppard E166 Co-spokesman SLAC: August 31, 2004.
Luminosity Monitor MWPC status report A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
OLYMPUS Collaboration Meeting Luminosity Monitor Symmetric Möller/Bhabha Calorimeter David Rodríguez Piñeiro Mainz University OLYMPUS Collaboration Meeting.
Monte-Carlo simulations and reconstruction for 12-degree ep-elastic Luminosity Monitor A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
DESY PRC May 10, Status of OLYMPUS -Project DESY PRC MAY 5, 2009 OLYMPUS-Proposal conditionally approved by PRC October 2008: 1.) details of the.
Luminosity Monitor MWPCs, test beam 22 results. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
1 Timescales Construction LCR MICE Beam Monitoring counters + DAQ My understanding Jan 07 Feb 07 Mar 07 Apr 07 May 07 Jun 07 Jul 07 Aug 07 Sep 07 ISIS.
Zhihong Ye Hampton University Feb. 16 th 2010, APS Meeting, Washington DC Data Analysis Strategy to Obtain High Precision Missing Mass Spectra For E
Peter Sharp CERN CMS Electronics CMS LV Power System Peter Sharp 7 April 2003.
Status of the Beamline Simulation A.Somov Jefferson Lab Collaboration Meeting, May 11, 2010.
1 Referee Report Olympus Elke Aschenauer Desy PRC, April 2011.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
Progress in Chamber Simulation Experiments At UCSD Laser Facility Farrokh Najmabadi and Kevin Sequoia HAPL Meeting February 5-6, 2004 Georgia Institute.
HQ01e CERN test preparation update CERN Team: H. Bajas, M. Bajko, A. Chiuchiolo, G. Deferne, O. Dunkle, J. Feuvrier, P. Ferracin, L. Fiscarelli, F. Flamand,
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
1 HiGrade Kick-off Welcome to DESY Hamburg Zeuthen.
1234 Dec Jan Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14.
Radar Development Status Report S. Gogineni, C. Allen, J. Ledford, K. Marathe, V. Jara, S. Raghunathan and M. A. Hameed.
Superconducting Corrector Magnet Progress Report P. Wanderer Superconducting Magnet Div; Dec. 15, 2007 T2K US B280 collaboration meeting.
1 BNL LARP Accelerator Physics Program Resources BNL role in national program BNL Accelerator Physics Program.
N. Morgan, Virginia Tech Qweak meeting,Oct ‘05 Region 2 Drift Chambers Status Report Qweak Collaboration Meeting October 2005.
Michel Della Negra/Karlsruhe May PbWO4 Crystals: Energy Resolution  m /m = 0.5 [  E1 /E 1   E2 /E 2  cot(  /2)  ] H   Simulation (100.
W.Van Doninck Re-scope TDR August 2008 The forward RPC system (TDR) China Korea Pakistan Gap production Korea Gap production Korea Front-end electronics.
EDR of the TOTEM Roman Pots - CERN - 24 November 2005 Beniamino Di Girolamo - CERN PH/ATT ATLAS Roman Pots at IR1 Beniamino Di Girolamo CERN.
DVCS – Hall A Study of the Background Noise HUGS 2008 Florian ITARD.
PRad Recent Achievements 1)PRad Implementation (“Position”) document developed and submitted to Jlab. 2)Jlab’s Director Office scheduling review passed.
EUDET Pixel-related DESY Tobias Haas 29 June 2006.
Inclusive Measurements of inelastic electron/positron scattering on unpolarized H and D targets at Lara De Nardo for the HERMES COLLABORATION.
11 December 2006DOE Review at ANL1 Tracking Chambers for FNAL E906 Edward R. Kinney University of Colorado, Boulder, USA Overview of Tracking Plan Station.
The 12 GeV equipment Hall D – Hall D – GLUEx detector for photoproduction experiments Hall B – Large acceptance detector CLAS12 for high luminosity measurements.
Status of PHENIX Drift Chamber Drift Chambers (DC) are one of the vital components of PHENIX central arms. During the last RHIC Run3 the major activities.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
NuMI Horn Alignment Cross-hair System NuMI Horn Alignment Cross-hairs Target Hall Instrumentation Review November 18, 2002 David Ayres Argonne National.
COMET μ-e conversion search at J-PARC. μ-e conversion physics SUSY-GUT, SUSY-seesaw (Gauge Mediated process) – BR = = BR(μ→eγ) × O(α) – τ→lγ SUSY-seesaw.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
Performance and Early Results from the Muon Tracking System of Rusty Towell of Abilene Christian University for the PHENIX collaboration First Joint Meeting.
Time Remaining 20:00.
News from DESY. Joachim Mnich Plenary ECFA CERN, November 2011.
1- Handling The Olympus GEMs at MIT-BATES between June 6th-August 8th Manufacturing The GEMs at HU-GEM LAB since Sep 2010 OZGUR ATES HAMPTON UNIVERSITY.
W.Van Doninck February 2010 The CMS muon upscope Restore the TDR version of CMS  ME4 CSC’s and RE4 RPC’s on Yoke YE3  When ? During first long shutdown.
SU participation in nn bar Sam Silverstein. Who are we? Particle physics group  ATLAS  IceCube Instrumentation physics division  ATLAS L1Calo trigger.
The new MEG tracker Marco Grassi INFN - Pisa Overview Timescale Tasks Funding.
Collaboration With DTTN 30 Aug Project Background Project Title An eLogistics Appliance with Data Exchange and Conversion Technologies for Infrastructure.
Design for a New Optical Table of the Shintake Monitor Takashi Yamanaka The University of Tokyo ATF2 weekly meeting 2007/9/26.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
Manoj B. Jadhav Supervisor Prof. Raghava Varma I.I.T. Bombay PANDA Collaboration Meeting, PARIS – September 11, 2012.
CsI(Tl) Calorimeter and status of the E166 experiment E166 experiment CsI ( Tl) calorimeter construction. Test beam results vs. Geant4 simulation Schedules.
R. Arnold SLAC 24 June 2002 Real Photon Collaboration Conceptual Design Review Beam Monitoring Instruments.
Fast Luminosity Monitoring JENNIFER Mid-Term Review
Baby MIND beam test status
Beam Gas Ionization Monitor (BGI)
SIDDHARTA Setup SIDDHARTA Kaon monitor focusing quads bhabha monitor
L H C A T L A S International Collaboration on the LHC Project
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
مديريت موثر جلسات Running a Meeting that Works

Cooler e-source Magnetized Beam LDRD Progress Report
4 + (-5) = A. Start at zero B. Move ______ spaces ___________ to get to the first number. C. From there, move _____ spaces __________ D. My final answer.
Laser Und XFEL.EU Experiment
Cooler e-source Magnetized Beam LDRD Progress Report
Presentation transcript:

Luminosity Monitor MWPCs. Status and plans. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,

Current activity Funding Electronics, infrastructure, etc GEANT3 Monte-Carlo simulations Space limitations? Construction plans

Space limitations 180x180mm possible? Wire chamber frame/cabling? Coil installation tolerance? degree view19.45 degree view0.00 degree view

Tentative schedule Design, materials, etcMay-Jul 2010 First 3 chambers readyDec 2010 Test run installationDec 2010 – Feb 2011 Test runFeb-Jul 2011 Remaining chambers readyJul 2011 Final installationJul-Aug 2011 CommissioningAug-Dec 2011