26 October 2001DRAFT1 COSYSMO: Constructive Systems Engineering Cost Model USC CSC Workshop 25-26 October 2001.

Slides:



Advertisements
Similar presentations
ISPA 4/5/04 1 Systems Engineering Sizing Via Requirements Ricardo Valerdi, USC Center for Software Engineering Viterbi School of Engineering ISPA Southern.
Advertisements

Full Day Workshop: Thursday, November 3, 2005, 8:00am – 5:00pm SAIC, Science Drive, Orlando, Florida Registration/Sign-In Begins at 7:30am Building.
Cost, Schedule, and Process Modeling Workshop USC CSSE Annual Research Review Facilitated by Jo Ann Lane.
Printed by CONIPMO (Constructive Infrastructure Protection Model): ACCURATELY ESTIMATING HOW MUCH IT WILL COST TO SET UP NETWORK.
Automated Software Cost Estimation By James Roberts EEL 6883 Spring 2007.
COCOMO Suite Model Unification Tool Ray Madachy 23rd International Forum on COCOMO and Systems/Software Cost Modeling October 27, 2008.
COSYSMO 2.0 Workshop Summary (held Monday, March 17 th 2008) USC CSSE Annual Research Review March 18, 2008 Jared Fortune.
COSOSIMO Workshop Outbrief October 28, 2005 Jo Ann Lane University of Southern California Center for Software Engineering COCOMO Forum –
University of Southern California Center for Systems and Software Engineering ©USC-CSSE1 Ray Madachy, Ricardo Valerdi USC Center for Systems and Software.
Working Group Meeting (Outbrief) Ricardo Valerdi, Indrajeet Dixit, Garry Roedler Tuesday.
USC 21 st International Forum on Systems, Software, and COCOMO Cost Modeling Nov 2006 University of Southern California Center for Software Engineering.
March 2002 COSYSMO: COnstructive SYStems Engineering Cost MOdel Ricardo Valerdi USC Annual Research Review March 11, 2002.
University of Southern California Center for Systems and Software Engineering USC CSSE Research Overview Barry Boehm Sue Koolmanojwong Jo Ann Lane Nupul.
A study of the Causes of Requirements Volatility and its Impact on Systems Engineering Effort COSYSMO Workshop Center for Software and Systems Engineering,
University of Southern California Center for Software Engineering CSE USC COSYSMO: Constructive Systems Engineering Cost Model Barry Boehm, USC CSE Annual.
11/08/06Copyright 2006, RCI1 CONIPMO Workshop Out-brief 21 st International Forum on COCOMO and Software Cost Modeling Donald J. Reifer Reifer Consultants,
COSYSMO: Constructive Systems Engineering Cost Model Ricardo Valerdi USC CSE Workshop October 25, 2001.
COSOSIMO* Workshop 13 March 2006 Jo Ann Lane University of Southern California Center for Software Engineering CSE Annual.
University of Southern California Center for Software Engineering CSE USC ©USC-CSE 10/23/01 1 COSYSMO Portion The COCOMO II Suite of Software Cost Estimation.
1 Systems Engineering Reuse Principles Jared Fortune, USC Ricardo Valerdi, MIT COSYSMO COCOMO Forum 2010 Los Angeles, CA.
Welcome and Overview: Annual Research Review 2006 Barry Boehm, USC-CSE March 15, 2006.
1 Results of Reuse Survey Jared Fortune, USC Ricardo Valerdi, MIT Gan Wang, BAE COSYSMO COCOMO Forum 2008 Los Angeles, CA.
University of Southern California Center for Systems and Software Engineering 1 November 2010 Mauricio Peña Dr. Ricardo Valerdi COSYSMO Requirements Volatility.
Welcome and Overview: COCOMO / SCM #20 Forum and Workshops Barry Boehm, USC-CSE October 25, 2005.
Constructive System of Systems Integration Cost Model (COSOSIMO) Workshop November 7, 2006 ****************** Outbrief Jo Ann Lane
COSYSMO Workshop Summary Ricardo Valerdi Tuesday March 14, 2006 Los Angeles, CA USC Center for Software Engineering Annual Research Review.
University of Southern California Center for Software Engineering CSE USC USC-CSE Annual Research Review COQUALMO Update John D. Powell March 11, 2002.
Valuing System Flexibility via Total Ownership Cost Analysis Barry Boehm, JoAnn Lane, USC Ray Madachy, NPS NDIA Systems Engineering Conference October.
System-of-Systems Cost Modeling: COSOSIMO July 2005 Workshop Results Jo Ann Lane University of Southern California Center for Software Engineering.
University of Southern California Center for Systems and Software Engineering 1 November 2010 Mauricio Peña Dr. Ricardo Valerdi CHARACTERIZING THE IMPACT.
1 Discussion on Reuse Framework Jared Fortune, USC Ricardo Valerdi, MIT COSYSMO COCOMO Forum 2008 Los Angeles, CA.
Estimating System of Systems Engineering (SoSE) Effort Jo Ann Lane, USC Symposium on Complex Systems Engineering January 11-12, 2007.
Costar & SystemStar Estimation Tools Dan Ligett Softstar Systems (603)
Systems Engineering Reuse: A Report on the State of the Practice Jared Fortune, USC Ricardo Valerdi, MIT Gan Wang, BAE Systems COCOMO Forum 2008 Los Angeles,
April 13, 2004CS WPI1 CS 562 Advanced SW Engineering General Dynamics, Needham Tuesdays, 3 – 7 pm Instructor: Diane Kramer.
11/1/07(c) USC-CSSE1 Welcome; CSSE Status and Plans Barry Boehm USC Center for System and Software Engineering COCOMO/SysE-SwE Estimation Forum #22 November.
COSOSIMO* Workshop Outbrief 14 March 2006 Jo Ann Lane University of Southern California Center for Software Engineering CSE.
University of Southern California Center for Software Engineering CSE USC 110/26/2004©USC-CSE Welcome and Overview: COCOMO / SCM #19 Forum and Workshops.
Towards COSYSMO 2.0: Update on Reuse Jared Fortune, USC Ricardo Valerdi, MIT USC ARR 2009 Los Angeles, CA.
COSYSMO Workshop Outbrief CSSE Annual Research Review Los Angeles, CA Mon March 16 & Tues March 17, 2009 Ricardo Valerdi.
Copyright © 2001, Software Productivity Consortium NFP, Inc. SOFTWARE PRODUCTIVITY CONSORTIUM SOFTWARE PRODUCTIVITY CONSORTIUM COSYSMO Overview INCOSE.
University of Southern California Center for Software Engineering CSE USC 10/8/00©USC-CSE1 Expediting Technology Transfer via Affiliate Programs and Focused.
October 28, 2001DRAFT1 COSYSMO: Reference System (Satellite Ground Station) Donald J. Reifer and Ricardo Valerdi University of Southern California.
ESD web seminar1 ESD Web Seminar February 23, 2007 Ricardo Valerdi, Ph.D. Unification of systems and software engineering cost models.
INCOSE CAB Briefing November 2002 COSYSMO COnstructive SYStems Engineering Cost MOdel November 1, 2002 Dr. Barry Boehm Ricardo Valerdi University of Southern.
LASPIN-INCOSE – 7/30/031 LASPIN-INCOSE Meeting Los Angeles, CA July 30, 2003 Ricardo Valerdi The Aerospace Corporation & University of Southern California.
Group Members: Ayush Newatia, Barry Foye, Billy Felton, Kevin Anderson, Shahnaz Begum and Adam Jasinski Constructive Cost Model is a technique used to.
University of Southern California Center for Systems and Software Engineering COSATMO/COSYSMO Workshop Jim Alstad, USC-CSSE Gan Wang, BAE Systems Garry.
February 2002Copyright 2002, USC1 COSYSMO: Constructive Systems Engineering Cost Model Status Briefing: GSAW 2002 February 2002.
July 2002 COSYSMO-IP COnstructive SYStems Engineering Cost Model – Information Processing PSM User’s Group Conference Keystone, Colorado July 24 & 25,
Gan Wang 22 October th International Forum on COCOMO® and Systems/Software Cost Modeling in conjunction with the Practical Software and Systems.
University of Southern California Center for Systems and Software Engineering COCOMO Suite Toolset Ray Madachy, NPS Winsor Brown, USC.
Harmonizing Systems and Software Estimation 23 rd International Forum on COCOMO and Systems/Software Cost Modeling and ICM Workshop USC Campus, Los Angeles,
Report of the Technical Subcommittee Mario Bergeron, Technical Subcommittee Chair/NGEC Vice Chair.
Some Preliminary Results Ricardo Valerdi Center for Software Engineering University of Southern California Disclaimer: Please do not distribute outside.
University of Southern California Center for Systems and Software Engineering 26 th Annual COCOMO Forum 1 November 2 nd, 2011 Mauricio E. Peña Dr. Ricardo.
COCOMO Software Cost Estimating Model Lab 4 Demonstrator : Bandar Al Khalil.
THE FAMU-CIS ALUMNI SYSTEM
Status Report Jim VanGaasbeek Ricardo Valerdi
Mathematical Formulation and Validation of the Impact of Requirements Volatility on Systems Engineering Effort March 6, 2012 Mauricio E. Peña.
PSM 2008 Workshop: Toward Integrating Systems Engineering and Software Engineering Estimation: Harmonizing COSYSMO and COCOMO John Gaffney
Costing Secure Systems Workshop Report
COSYSMO: Constructive Systems Engineering Cost Model
COSYSMO Delphi Round 2 Results
Towards COSYSMO 2.0: Update on Reuse
Working Group Meeting Report
University of Southern California Center for Software Engineering
COSYSMO: Constructive Systems Engineering Cost Model
Zen in the Art of Cost Estimation
Generalized Reuse Model for COSYSMO Workshop Outbrief
Presentation transcript:

26 October 2001DRAFT1 COSYSMO: Constructive Systems Engineering Cost Model USC CSC Workshop October 2001

26 October 2001DRAFT2 Participants Elliot Axelband, USC Kim Bell, Aerospace Joe Betser, Aerospace Barry Boehm, USC Linda Brooks, TRW Gary Hafen, LMCO Cheryl Jones, US Army Tony Jordano, SAIC Dan Ligett, Softstar Ray Kile, CSM Karen Lum, JPL Karen Owens, Aerospace Don Reifer, USC Gary Thomas, Raytheon Ariel Tonnu, US Air Force Ricardo Valerdi, USC Marilee Wheaton, TRW

26 October 2001DRAFT3 Agenda Introductions Goals of effort Review of previous work and contributions Agreement on scope and approach Proposed plan of action and milestones Assignment of responsibilities Summary and conclusions

26 October 2001DRAFT4 Goals of Effort Build a COCOMO-like model for estimating system engineering resources –Member of the COCOMO family of models COSYSMO (Constructive System Engineering Model) fills in the holes not covered by COCOMO II InceptionElaboration ConstructionTransition

26 October 2001DRAFT5 Scope and Approach COSYSMO Size Cost Drivers Effort Duration Calibration # Requirements # Interfaces # TPM’s # Scenarios # Modes # Platforms # Algorithms - Application factors -7 factors - Team factors -8 factors WBS guided By EIA 632

26 October 2001DRAFT6 Agreements Use USC seven step model building process Keep things simple –Start with Inception phase first –Use EIA 632 to bound effort –Focus on software intensive systems Build on previous work Shoot for having something meaningful done by mid-March 2002 –Much of the work done by volunteers, so must be conservative in estimates

26 October 2001DRAFT7 Plan of Action & Milestones TaskDue DateResponsible* TaskDue Date Responsible* 1.Develop reference system11//01/01Reifer/Valerdi 2.Define cost drivers11/16/01Wheaton/Valerdi 3.Define size drivers11/16/01Hafen/Thomas 4.Define effort scope11/16/01Hafen/Thomas 5.Finalize survey instrument11/30/01Thomas/Valerdi 6.Send materials out for review12/03/01All focal points 7.Hold net meeting/discuss results12/11/01All focal points 8.Updates done/Delphi defined01/14/02Reifer/Valerdi 9.Send Delphi out01/15/02All focal points 10.Complete Delphi round02/15/02Reifer/Valerdi 11.Update done based on results03/05/02Reifer/Valerdi 12.Present results at annual review03/12/02Valerdi * Axelband/Boehm involved in all activities

26 October 2001DRAFT8 Summary and Conclusions Had a productive meeting Everyone contributed Plan of action and milestones defined Looking forward to results Thanks to our group for a job well done