PDR: 3/27/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.

Slides:



Advertisements
Similar presentations
Greg Beau SerajAnanya. Outline  Project overview  Project-specific success criteria  Block diagram  Component selection rationale  Packaging design.
Advertisements

Tools MVRT Season. Overview Design –Combination Square –Caliper Fabrication –Hacksaw –File –Drill –Sandpaper/Steel Wool –Shears Assembly –Allen.
Threads and Fasteners Fasteners.
November 14, 2013 Mechanical Engineering Tribology Laboratory (METL) David Arseneau Research Assistant Sensor Development for a Wind Turbine Bearing Cage.
PDR: 2/7/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
Revolutionary Technologies Group C1 Nicholas Arch, Nicholas Fraser, Robert Huth, Patrick Noble, Michael Toomey Preliminary Design Review March 20, 2008.
Feasibility MSA P Base Plate Feasibility 3 plastics were looked at for MSA mounting board material: ABS, Acrylic, and polypropylene. Due to cost.
A CCESSIBLE L OCK O PENER RIT CE Senior Design Jeremy Espenshade Jason Fay.
Bangarang Musical Engineering University of Notre Dame Department of Aerospace and Mechanical Engineering Group Members: Roberto Ayala, Ryan Bradley, Pat.
Preliminary Design Review Week 6 Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday March 13, 2008.
Interactive Xylophonic Keyboard Mini-Mozarts October 12, 2006 Gordon Farmer Michael Johnson Eric Laumann Bryan Marek Philip Moss.
‘Iole o Mãnoa Mouse of Mãnoa. Team Members Jeff Fines Designer, Fabricator, Programmer & Thomas Matsushima Designer, Fabricator, Programmer.
John Wloch Wind-Aid Preliminary Design Review 1 April 2008 Andy CrutchfieldJames Gates Keri Macaulay David Rupp.
ZigBee Calvin Choy David Kim Jason Chong Devin Galutira.
Pinwheel Technologies (C3)
Preliminary Design Review Week 7 Group A3: HMS “Bloodhound” Matt Prygoski Matt Morris Jay Slaggert Fred Thwaites Dan Zibton Thursday March 20, 2008.
PDR: 2/21/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
PDR: 1/31/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
PDR: 4/10/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
PDR: 2/22/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
John Wloch Wind-Aid Preliminary Design Review 25 March 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
A6: Team Rallye Potable Water Still Presented by: Full Group November 15, 2006.
Knowledge to Shape Your Future Electric / Gas / Water Information collection, analysis and application MekElekItroniks Design Review Battery Charger Project.
PDR: 3/20/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
Concept Design Review Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
Hydraulic Log Splitter ET 493- Senior Design One Jordan Millet Ridge Bourgeois Marcus Millet Advisor: Dr. Junkun Ma Teacher: Dr. Cris Koutsourgeras.
TT Assembly Structure Reference-Reinforcement System: 1.Description of the system 2.Assembling Procedure 3.Production Project Board, march 2005 D.Orlandi.
Critical Design Review Wind Turbine with Gearbox
1 © Unitec New Zealand Embedded Hardware ETEC 6416 Date: - 10 Aug,2011.
Motors Make the world go ‘round By Jackson Greer, Room 305.
John Wloch Wind-Aid Preliminary Design Review 11 March 2008.
Threads, Fasteners, and Springs Chapter Technical Drawing 13 th Edition Giesecke, Mitchell, Spencer, Hill Dygdon, Novak, Lockhart © 2009 Pearson.
Metal Joining Metal joints can be temporary or permanent.
Global wind day is back!!!! On 15 th June, it is Global Wind Day Global Wind Day 2012 is New Zealand's opportunity to celebrate the role that wind plays.
SDMAY11-01 Advisor: Dr. Ajjarapu Team Members: Luke Rupiper Shonda Butler Andrew Nigro Ryan Semler Chad Hand.
Michael Cleveland Jesse Piburn George Threadgill Justin Lamb.
Zack Burchman Travis Gang Dana Geer Matt Seekins Faculty Advisor: Mike Rosen GMCR Contacts: Wade Hodge Paul Comey Jason King.
A6: Team Rallye Potable Water Still Presented by: Tim Rodts October 26, 2006 Nicole Del Rey Mike McConnell Tim Rodts Eric Sabelhaus.
Perry Lapper Progress. Frame With Actuators Outside Frame.
Solar Powered Boat. Introduction In Term four Drew, Luke and I have worked on producing a solar powered boat. We started on brain storming ideas until.
Individual Subsystem Testing Report New Jersey Space Grant Consortium with Rutgers University Stevens Institute of Technology 2/13/2012.
Final Demonstration Team 2A The Charles Machine Works Downhole Generator Project.
Improved Robotic Arm for Sensitivity Characterization of Occupancy Sensors Will Hedgecock Brian Auerbach John Sullivan.
Series Circuits A closed circuit in which all parts are connected end to end to provide a single path for the current. Charges flow from the battery to.
Wind Turbine Design and Implementation. Team Members Members: Luke Donney Lindsay Short Nick Ries Dario Vazquez Chris Loots Advisor: Dr. Venkataramana.
Jason Tarrant / November 2008 MICE Target Mechanical Design l Jason Tarrant – STFC l Introduction »Investigations into target shaft failure »Current suspicions.
March 19, 2013 A-Day Objective: YWBAT give examples of energy conversions among the different energy forms. Drill: Describe how turbines can be used to.
Sectional Views Advanced Drawing Abilities Teacher © J Lewis 2004.
A6: Team Rallye Potable Water Still Presented by: Eric Sabelhaus October 12, 2006 Eric SabelhausNicole Del Rey Mike McConnellTim Rodts.
Revolutionary Technologies Group C1 Nicholas Arch, Nicholas Fraser, Robert Huth, Patrick Noble, Michael Toomey Preliminary Design Review February 21, 2008.
RELAY. Relay A relay is an electically operated switch. Many relays use an electromagnet to operate a switching mechanism mechanically, but other operating.
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
P16462: Wind Energy Base Station MSD II Phase I Update 2/5/2016 Team Members Aleksandr Kim Laura Arcinegas Kevin “KC” Collins Sarah Collmus Kevin “Kevlar”
John Wloch Wind-Aid Preliminary Design Review 5 February 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
Project Overview  Introduction  Clawbot Build  Design Modification  Design Development  Programming  Sensors  Advanced Sensors  Open design challenges.
What is a Mechanism? Two pieces of a machine where motion of one part causes the other part to move.
Chapter 1 Introduction.
Sectional Views Advanced
VERTICAL AXIS WIND TURBINE
Automobile ENGINE SungBin KIM Min Ju JEON.
Square Tube Shaft Connecting Both Gear Drives.
Tech Talk The Final Notes.
THE MANUFACTURING PROCESS
THE MANUFACTURING PROCESS
Mechanical hardware.
Mechanical hardware.
Detailed Design Review (Phase 4)
SNS PPU Cryomodule Space Frame
Presentation transcript:

PDR: 3/27/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni

Overview Vertical-Axis Wind Turbine Vertical-Axis Wind Turbine Interchangeable Shaft Interchangeable Shaft

Last Week’s Action Items Circuit design and embedded intelligence Circuit design and embedded intelligence Decided on ‘slow drain’ circuit Decided on ‘slow drain’ circuit Microcontroller input will be from ammeter Microcontroller input will be from ammeter

Last Week’s Action Items ctd. Finish ordering parts Ordered all main components Missing: 1 bearing, 1 hand crank, nuts and bolts

Current Status Step One Receive all necessary parts Step Two ? Step Three

This Week’s Action Items ‘Step Two’ Finalize circuit logic

Step Two Order hand crank Order hand crank 24” shaft, 12” square barstock, 6” shaft 24” shaft, 12” square barstock, 6” shaft Welded together, pinned to hub Welded together, pinned to hub

Step Two ctd. Connect hub and shaft Connect hub and shaft Machine flats Machine flats Drill hole for clevis pin Drill hole for clevis pin Mount turbine Mount turbine Drill holes in supporting struts Drill holes in supporting struts Plan the rest of assembly process. Execute as feasible. Plan the rest of assembly process. Execute as feasible.

Circuit Requirements Measure rpms from ammeter input Alert when generator is operating at unsustainable speed (max 10 A) Slow drain battery

Why not charge the battery? Not out to prove technical feasibility of charging a battery Slow drain will prove key deliverables Mechanical functionality Intelligence capability

Updated diagram

Conclusion Can see a tangible product taking shape Can see a tangible product taking shape Identify and execute remaining tasks Identify and execute remaining tasks Next week: 100% identify, execute as much as possible Next week: 100% identify, execute as much as possible