Initial Step to go beyond 200E30 Ted TDWG, Sept 1st 2006.

Slides:



Advertisements
Similar presentations
The people Look for some people. Write it down. By the water
Advertisements

90 DAY PLAN.
Word List A.
UK egamma meeting, Sept 22, 2005M. Wielers, RAL1 Status of Electron Triggers Rates/eff for different triggers Check on physics channels Crack region, comparison.
H/Abb -> 4b’s process & Multi-Et-Threshold Study for 4jet Trigger Kohei Yorita Young-Kee Kim University of the FTK Meeting on July 13 th, 2006.
Final Commissioning Plan and Schedule Cheng-Ju Lin Fermilab Installation Readiness Review 09/27/2004 Outline: - Work to be done during shutdown - Work.
The trigger1 The Trigger YETI 7th January 2008 Emily Nurse Outline: Why do we need a Trigger? The trigger system at CDF Rate control at CDF Triggering.
CDF CDF Operations Steve Hahn February 7, 2005 All Experimenters ’ Meeting.
MOM report 23/9 – 28/9 G.CECCHET. MOM report Hall PPS commissioning Target tests last night MOM laptop.
Introduction Ted Liu, FNAL Feb. 9 th, 2005 L2 Pulsar 2rd IRR Review, ICB-2E, video: 82Pulsar
Trigger Table Improvements -- past, present and future prospects Kirsten & Ted, Feb.02, 2006, CDF meeting Happy Chinese/Korea New Year! Year of dog… When.
Lukens - 1 TDC Review – 28 September 2004 TDC Production Review - Introduction Pat Lukens.
CDF Trigger System Veronica Sorin Michigan State University Silicon Workshop UCSB May 11,2006.
Summary Ted Liu, FNAL Feb. 9 th, 2005 L2 Pulsar 2rd IRR Review, ICB-2E, video: 82Pulsar
Table Improvements & Near Term Plan Ted & Kirsten July 08, 2005 TDWG Introduction Table performance due to improved L2 JETs Initial Trigger Table Cleanup:
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
CDF Current Status and Future Prospects Ted Liu Fermilab DOE review, May 2006.
Student views about homework Toby Leonard Eleanor Scott Jessica Hollis Nima Habibzadeh Lauren Danbury Alice Ward.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
What a Student with Learning Difficulties Might Say Things to look for in your conversations with students. You can learn a lot about a student from the.
Commanding Officer’s Philosophy of Command We exist to fight and win our Nation’s Wars. We can never lose sight of that fact. We are living during an extremely.
Cursive Cursor ™ We read things So you don’t have to.
American Reading Company ANNUAL PERFORMANCE REPORT AND SURVEY RESULTS.
Joint Commissioning (2) Commissioning plan Gene Flanagan Purdue University.
New Zealand Eastern Health Urology OPD Fran Brockhus – Assistant Director of Nursing.
Overview of Verb Tenses
PERFECT TENSES IES NUESTRA SEÑORA DE LA CABEZA (2º BACHILLERATO)
Cluster Finder Report Laura Sartori (INFN Pisa) For the L2Cal Team Chicago, Fermilab, Madrid, Padova, Penn, Pisa, Purdue.
L2CAL Pulsar Upgrade Proposal in 24 minutes An Executive Summary Ted Liu For the L2CAL upgrade team Pisa/Purdue/Rockefeller/UC/Upenn /Madrid/Padova/Academica.
Assessing and Moderating - Assessment without levels.
27 July 2006Trigger Upgrades Review1 Status & Plans of the TDWG Mission Statement What Do We have to Guide Us ? Caveats & Concerns Current & Anticipated.
News Ted & Kirsten June 10, 2005 TDWG. Meet Trigger Reps today? Exotic Trigger Reps: Vadim and Oscar doing great work QCD Trigger Rep: Mary herself EWK.
RPC DQA but also Monitoring for the DCS group: status and prospective for Marcello Bindi RPC L1MU Barrel DQM - 08/05/2013.
Everything you have always wanted to know about the Perfect tenses… …and you probably did, but you forgot.
Mtivity Client Support System Quick start guide. Mtivity Client Support System We are very pleased to announce the launch of a new Client Support System.
L2 Upgrade review 19th June 2007Alison Lister, UC Davis1 XFT Monitoring + Error Rates Alison Lister Robin Erbacher, Rob Forrest, Andrew Ivanov, Aron Soha.
Simple ideas on how to integrate L2CAL and L2XFT ---> food for thoughts Ted May 25th, 2007.
Algebraic Thinking 5 th Grade Guided Instruction Finding Rules and Writing Equations For Patterns.
Level 3 Trigger Leveling D. Cutts(Brown), A. Garcia-Bellido(UW), A. Haas(Columbia), G. Watts(UW)
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Sight Words.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
2007 Run Update for STAR Jeff Landgraf For the STAR collaboration.
Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, 2000 Level 2 Calorimeter and Level 2 Isolation Trigger Status Report Monica Tecchio University.
Met and Normalization Sarah Eno. I wanted to see if we can learn anything about the MET normalization issue using a toy monte carlo. first, we need a.
L2CAL Pulsar Upgrade Proposal in 24 minutes An Executive Summary Ted Liu For the L2CAL upgrade team Pisa/Purdue/Rockefeller/UC /Madrid/Padova/Academica.
High Frequency Words.
25 Apr 00jpg1 Games with Trigger Tables Sarah Eno.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
1 Jet Triggers and Dijet Mass Selda Esen and Robert M. Harris Fermilab TTU Weekly HEP Group Meeting Feb 16, 2006.
HI July Exercise and Muon DQM preparation Mihee Jo Mihee Jo / Lab meeting.
D. Saltzberg, May 19, 2000 CDFWEEK ``Physics Tables’’ for Commissioning Run -- TDWG l TDWG collected information from detector groups during CDFWEEK äHow.
Performances of the upgraded SVT The Silicon Vertex Trigger upgrade at CDF J.Adelman 1, A.Annovi 2, M.Aoki 3, A.Bardi 4, F.Bedeschi 4, S.Belforte 5, J.Bellinger.
News and Related Issues Ted & Kirsten May 27, 2005 TDWG News since last meeting (April 29th) Organization Issues: how to improve communication Future Plans:
ALSMS Upgrade Configuration Example Alcatel-Lucent Security Products Configuration Example Series.
Ch. 6 Past Perfect + Past Perfect Continuous. Past Perfect Subject + Had + Past Participle I had hiked for four hours by then. She had eaten dinner before.
Trade Grade:  Trade Criteria Met?  Pre-Planned? Entry:  Followed Entry Tactic?  Precision Entry? Risk:  Position Size Correctly?  Stop Placed?
Beginning Software Craftsmanship Brendan Enrick Steve Smith
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
Everything you have always wanted to know about the Perfect tenses… …and you probably did, but you forgot.
Cats PREGNANCY THE PROCESS OF A MAMA CAT GETTING READY TO HAVE KITTENS IS CALLED "QUEENING." A FEMALE CAT CAN GET PREGNANT WHEN SHE’S AS YOUNG AS 4 MONTHS.
Past Simple, Past Continuous & Past Perfect
More technical description:
Global PID MICE CM43 29/10/15 Celeste Pidcott University of Warwick
Kevin Burkett Harvard University June 12, 2001
Past Simple, Past Continuous & Past Perfect
14 paesi, 62 universita’ e laboratori
Trigger  Detectors at 420m can be included in the HLT
Past Simple, Past Continuous & Past Perfect
Presentation transcript:

Initial Step to go beyond 200E30 Ted TDWG, Sept 1st 2006

The Sunday night phone call… Last Sunday night, Ted got a call from control room:  “Ted, where are you? We have 40% dead time here!!!”  “well, I am home. what’s the luminosity?”  “200 E30”  “OK! Relax, that is expected... Thanks for the call though” Have been waiting for this phone call since Jan when 1st GUT table was commissioned…  Back then, had plan for 200E30 (see TDWG talk on Jan 20th)  But needed high lumi data points to guide us the details…  Machine folks tried ~200E30 on Feb. 14th with 418E10 pbars, but failed badly: The “Valentine’s day massacre of pbars!”  Now > 200E30 is here! Yesterday morning: 223E30!  And we were hit really badly, had to drive the system “by hand”: hand prescaled a few high rate triggers! (high Pt CMX and MET+2JETs by PS200 etc!) …

People are extremely supportive: Thanks! Our ass has been kicked, 1st time in the past year!  GUT table got burned at high luminosity ~ 200E30  Many people came talk to me to show their full support! Willis/Peter, Jonathan, Rob/Jaco, Henry, Beate,Vadim, Larry,Tom, Mary, Oscar, Viktor, Cheng-Ju, Marcel/Ankush/Ulrich…  Received LOTs s in the past few days about this… from many. Time to fight back…  Can we handle this? You bet!  Key to success: work together as a coherent team!  TDWG/Physics Groups/Trigger Hardware&Software/DAQ/Offline/OPS/…  Next: Some details

CDF Trigger Performance in 24 seconds… L1A bandwidth: ~ 30KHz, no longer a bottleneck for RunIIb  L2 Decision crate and SVT upgrade  XFT upgrade will also improve the L1 purity L2A bandwidth: ~1 KHz, not enough for RunIIb  Tons of work went into EVB/L3 upgrade, DAQ improvements …  Significant improvements from ~ 300 Hz to ~1 KHz  Still not “enough”: 40% deadtime at 200E30  The problem: L2A cross section grows rapidly with luminosity  Why? Mostly JUNK

Last Sunday run (4928, Aug 27, 2006). Slope: > ~150Hz/10E30

. Soft Readout deadtime wall Hard Busy deadtime wall The two great Walls competing for attention…

Last Sunday run (4928, Aug 27, 2006). Slope: ~190Hz/10E30 after dead time correction

L2 triggers with high growth term: two types of L2 triggers gone wild…. Track/mu related: e.g. CMX etc L2CAL related: e.g. MET+2JETs Why? Probably Bad names… JET: JUNK Enhanced Trigger MET: MESS Enhanced Trigger CMX: Could Match beamX

L2A rate increase from 160 to 200E30 High rate L2 triggers:  CMX6_PT8_TRK5/CMX6_PT15: 100/ Hz jump !  CJET10_JET10_L1_MET25: 100/ /200E30, 80 Hz jump  TWO_CMU1.5_PT2_DPHI120_OPPQ_PS2: 50/120Hz, 70 Hz jump CMU1.5_PT2_CMX1.5_PT2_DPHI120_OPPQ_PS2: 30/140 Hz, 110 Hz jump  BJET15_D120_JET10_ETA1.8: 24/64 40 Hz jump  Sum of all 5 triggers above: 300/ /200E30, 540 Hz jump  The slope is: 540 Hz/ 40E30 or ~130 Hz / 10E30 for the 5 triggers above  The overall L2A slope for current table: ~200 Hz/10E30 around 180E30  The slope gets bigger at higher luminosity ! Conclusion:  The 5 triggers fill up the bandwidth at 200E30 (840Hz)  their growth or slope dominates (130Hz/10E30 vs 200Hz/10E30 total)  At 220E30, had to prescale away four of them (except J/Psi CMU) in order to keep deadtime below 30%… run

Initial step to go beyond 200E30: next table (v7) next week CMX6_PT8_TRK5/CMX6_PT15:  Add new CMX trigger with SLAM confirmation at L2 (not at L1 yet), test version first with a PS  Physics groups should help XFT folks to validate the new triggers as soon as we have the data  Keep the existing one at low luminosity, as it is more efficient, either by DPS or lumi_enable  Can keep a copy of the existing one with heavy PS, to higher luminosity (for normalization etc) CJET10_JET10_L1_MET25:  Add a test version with PS for: CJET10_JET10_L2_MET27  Add a test version with PS for: CJET25_JET10_L1_MET25  Keep the existing one, with DPS or lumi_enable at L2 J/Psi CMU and CMX version with PS2:  Switch over to the new J/Psi triggers with MT and asym Pt (already tested), with DPS  For the existing ones, change PS2 to PS50  (near future: Work with B group to implement new J/Psi triggers for higher luminosity) BJET15_D120_JET10_ETA1.8: DPS or lumi_enable Change to MET_BJET_DPS: currently L1 fully enabled while L2 DPSed  L2 DPSed started to relax only below 150E30  L1 is at 220E30, and only 2.5KHz at 150E30  Lumi_enable L1_MET15_JET15_TWO_TRK5 below150E30 for next table

Fresh high lumi data for trigger studies: Run , lumi E30! Taken yesterday with table v6  High PT CMX triggers prescaled by PS200, as agreed back in Jan. for a test run (as agreed, CMX was marked bad)  MET+2JETs trigger prescaled by PS200  J/PSI CMX version prescaled by PS50  New muon phi-gap trigger disabled at L1 (was at 6.8KHz at 220E3)  Deadtime was about 20% at 210E30 Also has new test triggers with SLAM confirmation in this data  Under trigger paths: TETS_ELECTRON_CENTRAL_L13D, L23D etc…  Physics groups: please help the XFT folks to look at the data! This run is perfect data sample for all other trigger studies!

Future Plan Only focused on next table at this meeting, more work ahead of us in the near future  More triggers will be on DPS/lumi_enable in the near future, as we move into higher luminosity  This next table is good up to 210E30. This is just the 1st step  More changes coming very soon! Will be BUSY this fall…. It’s fun time, Join us! Need help from Physics Groups to validate/commission the new XFT  The new capabilities likely available at different times  Needs careful planning on how to commission/integrate new triggers into trigger table  Use common sense: Do and push for what we need most first, e.g. high Pt then low Pt… DPS accounting and accounting: we need it NOW  Core software work done… Jonathan needs physics groups to help for validation…  (near future: Work with B group to implement new J/Psi triggers for higher luminosity) Push for L1 MET improvement  Feasibility study already done by Peter… time to make it work in system. Needs help here Continue to improve the bandwidth: EVB/READOUT/L3/CSL on going L2CAL upgrade

backups Some online plots.

> 50 Hz/10E30

>20Hz/10E30

20Hz/10E30

TriggerPath: MET_BJET_DPS [14]MET_BJET_DPS [14] Level 2: L2_TWO_TRK2_D100_&_BJET15_&_MET15_DPS [2] Level 3: L3_MET20_TWO_TRACK [1]L2_TWO_TRK2_D100_&_BJET15_&_MET15_DPS [2]L3_MET20_TWO_TRACK [1] TriggerPath: MET_L2PS4K_L1_MET15_&_JET5_&_TWO_TRK2 [1] Level 2: MET_L2PS4K_L1_MET15_&_JET5_&_TWO_TRK2 [1] L2_PS4K_L1_MET15_&_JET5_&_TWO_TRK2 [1] Level 3: L3_NULL [1]L3_NULL [1] Lumi_enable this one at L1