Update on DAQ Klaus Schossmaier CERN PH-AID ALICE TPC Meeting 21 April 2006.

Slides:



Advertisements
Similar presentations
1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
Advertisements

Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
DAQ for the TPC Sector Test at Test Beam T10 ALICE DAQ Group ALICE TPC Collaboration Meeting Cagliari, Sardinia 16 – 17 May 2004.
1P. Vande Vyvre - CERN/PH ALICE DAQ Technical Design Report DAQ TDR Task Force Tome ANTICICFranco CARENA Wisla CARENA Ozgur COBANOGLU Ervin DENESRoberto.
11/12 December 20061Borge S. Nielsen, NBI FMD contribution Second Installation and Commissioning Workshop DAQ and ECS FMD contribution Børge S. Nielsen,
DAQ for Test&Commissioning at Point 2 Klaus Schossmaier CERN PH-AID ALICE TPC Collaboration Meeting Heidelberg, Germany February 2004.
CHEP04 - Interlaken - Sep. 27th - Oct. 1st 2004T. M. Steinbeck for the Alice Collaboration1/20 New Experiences with the ALICE High Level Trigger Data Transport.
> IRTG – Heidelberg 2007 < Jochen Thäder – University of Heidelberg 1/18 ALICE HLT in the TPC Commissioning IRTG Seminar Heidelberg – January 2008 Jochen.
Timm M. Steinbeck - Kirchhoff Institute of Physics - University Heidelberg - DPG 2005 – HK New Test Results for the ALICE High Level Trigger.
HLT Collaboration (23-Jun-15) 1 High Level Trigger HLT PRR Planning Volker Lindenstruth Kirchhoff Institute for Physics Chair of Computer Science University.
1 HLT – ECS, DCS and DAQ interfaces Sebastian Bablok UiB.
VC Sept 2005Jean-Sébastien Graulich Report on DAQ Workshop Jean-Sebastien Graulich, Univ. Genève o Introduction o Monitoring and Control o Detector DAQ.
1 FEE Installation & Commissioning TPC Meeting, 21 April 2006 L. Musa.
LP TPC DAQ Ulf Mjörnmark Lund University Present understanding and plan.
Jochen Thäder – Kirchhoff Institute of Physics - University of Heidelberg 1 HLT for TPC commissioning - Setup - - Status - - Experience -
Timm M. Steinbeck - Kirchhoff Institute of Physics - University Heidelberg 1 HLT and the Alignment & Calibration DB.
VC MICO Report July 07Jean-Sébastien GraulichSlide 1 Main news  DAQ test bench running in Geneva 2 LDCs connected to 2 different PCs, 1 GDCs DAQ trigger.
MSS, ALICE week, 21/9/041 A part of ALICE-DAQ for the Forward Detectors University of Athens Physics Department Annie BELOGIANNI, Paraskevi GANOTI, Filimon.
Normal text - click to edit RCU – DCS system in ALICE RCU design, prototyping and test results (TPC & PHOS) Johan Alme.
Evaluation of the LDC Computing Platform for Point 2 SuperMicro X6DHE-XB, X7DB8+ Andrey Shevel CERN PH-AID ALICE DAQ CERN 10 October 2006.
ALICE DAQ Plans for 2006 Procurement, Installation, Commissioning P. VANDE VYVRE – CERN/PH for LHC DAQ Club - CERN - May 2006.
1 Alice DAQ Configuration DB
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
V. Altini, T. Anticic, F. Carena, W. Carena, S. Chapeland, V. Chibante Barroso, F. Costa, E. Dénes, R. Divià, U. Fuchs, I. Makhlyueva, F. Roukoutakis,
The ALICE DAQ: Current Status and Future Challenges P. VANDE VYVRE CERN-EP/AID.
DAQ & ECS for TPC commissioning A few statements about what has been done and what is still in front of us F.Carena.
1 Responsibilities & Planning DCS WS L.Jirdén.
The ALICE Data-Acquisition Software Framework DATE V5 F. Carena, W. Carena, S. Chapeland, R. Divià, I. Makhlyueva, J-C. Marin, K. Schossmaier, C. Soós,
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
TB Peter Glässel, Heidelberg1 TPC Progress.
4 Dec 2006 Testing the machine (X7DBE-X) with 6 D-RORCs 1 Evaluation of the LDC Computing Platform for Point 2 SuperMicro X7DBE-X Andrey Shevel CERN PH-AID.
RCU Status 1.RCU design 2.RCU prototypes 3.RCU-SIU-RORC integration 4.RCU system for TPC test 2002 HiB, UiB, UiO.
ALICE Computing Model The ALICE raw data flow P. VANDE VYVRE – CERN/PH Computing Model WS – 09 Dec CERN.
Roberto Divià, CERN/ALICE 1 CHEP 2009, Prague, March 2009 The ALICE Online Data Storage System Roberto Divià (CERN), Ulrich Fuchs (CERN), Irina Makhlyueva.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Bernardo Mota (CERN PH/ED) 17/05/04ALICE TPC Meeting Progress on the RCU Prototyping Bernardo Mota CERN PH/ED Overview Architecture Trigger and Clock Distribution.
Introduction CMS database workshop 23 rd to 25 th of February 2004 Frank Glege.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
NA49-future Meeting, January 26, 20071Ervin Dénes, KFKI - RMKI DATE the DAQ s/w for ALICE (Birmingham, Budapest, CERN, Istanbul, Mexico, Split, Zagreb.
Planning and status of the Full Dress Rehearsal Latchezar Betev ALICE Offline week, Oct.12, 2007.
17/1/07 F. Formenti PH-ED1 Competence domain (PH-ED) What field of expertise ED can provide?  System electronics design  1.Front-end detector electronics.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
The Past... DDL in ALICE DAQ The DDL project ( )  Collaboration of CERN, Wigner RCP, and Cerntech Ltd.  The major Hungarian engineering contribution.
Filippo Costa ALICE DAQ ALICE DAQ future detector readout October 29, 2012 CERN.
ALICE Online Upgrade P. VANDE VYVRE – CERN/PH ALICE meeting in Budapest – March 2012.
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
Status of Integration of Busy Box and D-RORC Csaba Soós ALICE week 3 July 2007.
R.Divià, CERN/ALICE 1 ALICE off-line week, CERN, 9 September 2002 DAQ-HLT software interface.
Calibration & Monitoring M.N Minard Monitoring News Status of monitoring tools Histogramm and monitoring meeting 6/02/08 Calibration farm brainstorming.
ISOLDE RILIS User Laser Shutter and RILIS Data Feedback.
P. Vande Vyvre – CERN/PH for the ALICE collaboration CHEP – October 2010.
Sergio Vergara Limon, Guy Fest, September Electronics for High Energy Physics Experiments.
András László KFKI Research Institute for Particle and Nuclear Physics New Read-out System of the NA61 Experiment at CERN SPS Zimányi Winter School ‑ 25.
The ALICE Data-Acquisition Read-out Receiver Card C. Soós et al. (for the ALICE collaboration) LECC September 2004, Boston.
EMCal Cosmics Run Cosmics Run Goals
LHC experiments Requirements and Concepts ALICE
TPC Commissioning: DAQ, ECS aspects
ProtoDUNE Installation Workshop - DAQ
IEEE NPSS Real Time Conference 2009
Commissioning of the ALICE HLT, TPC and PHOS systems
SPD – ALICE DAQ/ECS/Trigger Integration Status Report
Large CMS GEM with APV & SRS electronics
TPC Status Outline Completion of installation 14 September 2006
PCI BASED READ-OUT RECEIVER CARD IN THE ALICE DAQ SYSTEM
ITS combined test seen from DAQ and ECS F.Carena, J-C.Marin
TPC Detector Control System
Presentation transcript:

Update on DAQ Klaus Schossmaier CERN PH-AID ALICE TPC Meeting 21 April 2006

DAQ for TPC commissioning ALICE TPC meeting, 21 April DAQ setups for the TPC  RCU Lab (epaitbeam02):  2 DDLs, 1 D-RORC, integration: RCU, SIU, Trigger, DATE, HLT, ECS  SXL2 (pcald23):  1 DDL, 1 D-RORC, checks for installation, RORC utilities, LabView  SXL2 (aldaqpc021):  1 DDL, 1 D-RORC, TPC electronics characterization, RORC utilities, LabView  Hall 167 (pcalicetpc167):  2 DDLs, 1 D-RORC, TPC prototype with cosmics  PX24/CR1 and SXL2 for commissioning  108 final SIUs have been given to Luciano  Patch cords (14x 40m and 10x 60m E2000-LC) for SXL2 are available  2 Linux PCs for operating the DAQ/ECS have been placed in the clean room

DAQ for TPC commissioning ALICE TPC meeting, 21 April Planned DAQ Setup TDS LDC Event Building Network (Gigabit Ethernet) LDC 6x DRORC PX24/CR1 PC LDC DRORC HLT Farm PX24/CR2 RCU SIU SXL2 GDCServerGateway 2 TB Disk array (RAID 5) General Purpose Network (GPN) (DATE, ECS) (runControl) RCU SIU 6x DDL 6x

DAQ for TPC commissioning ALICE TPC meeting, 21 April Milestones !!!  LHCC Milestones  Combined TRG/DAQ/HLT with the TPC  450 (May06): running mode A+B  451 (Jun06): running mode A+B+C  Work to be done  Maintaining the DAQ setups  Continuing the installations of machinery in CR1  DATE v5.15 installation/configuration  ECS v2.7 installation/configuration  Integration DAQ/Trigger/HLT/ECS  Implementation of the different calibration runs  Participation in data quality monitoring (MOOD)  Participation in the RCU configuration via DDL  Scheme to capture RCU  DDL  equipmentId