Update on DAQ Klaus Schossmaier CERN PH-AID ALICE TPC Meeting 21 April 2006
DAQ for TPC commissioning ALICE TPC meeting, 21 April DAQ setups for the TPC RCU Lab (epaitbeam02): 2 DDLs, 1 D-RORC, integration: RCU, SIU, Trigger, DATE, HLT, ECS SXL2 (pcald23): 1 DDL, 1 D-RORC, checks for installation, RORC utilities, LabView SXL2 (aldaqpc021): 1 DDL, 1 D-RORC, TPC electronics characterization, RORC utilities, LabView Hall 167 (pcalicetpc167): 2 DDLs, 1 D-RORC, TPC prototype with cosmics PX24/CR1 and SXL2 for commissioning 108 final SIUs have been given to Luciano Patch cords (14x 40m and 10x 60m E2000-LC) for SXL2 are available 2 Linux PCs for operating the DAQ/ECS have been placed in the clean room
DAQ for TPC commissioning ALICE TPC meeting, 21 April Planned DAQ Setup TDS LDC Event Building Network (Gigabit Ethernet) LDC 6x DRORC PX24/CR1 PC LDC DRORC HLT Farm PX24/CR2 RCU SIU SXL2 GDCServerGateway 2 TB Disk array (RAID 5) General Purpose Network (GPN) (DATE, ECS) (runControl) RCU SIU 6x DDL 6x
DAQ for TPC commissioning ALICE TPC meeting, 21 April Milestones !!! LHCC Milestones Combined TRG/DAQ/HLT with the TPC 450 (May06): running mode A+B 451 (Jun06): running mode A+B+C Work to be done Maintaining the DAQ setups Continuing the installations of machinery in CR1 DATE v5.15 installation/configuration ECS v2.7 installation/configuration Integration DAQ/Trigger/HLT/ECS Implementation of the different calibration runs Participation in data quality monitoring (MOOD) Participation in the RCU configuration via DDL Scheme to capture RCU DDL equipmentId