ERCOT Staff Comments Regarding the Proposed Suspension of Residential 2005 Annual Validation RMS Presentation August 10, 2005.

Slides:



Advertisements
Similar presentations
Retail Market Subcommittee Update to TAC February 5, 2004.
Advertisements

ERCOT Analysis of 2005 Residential Annual Validation Using the Customer Survey Results ERCOT Load Profiling Presented to PWG - October 26, 2005.
Profiling Working Group March 13, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for COPS Meeting March 13, 2007.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting November 6, 2007.
Presented to the PWG Meeting of May 26, 2010
Profiling Working Group January 11, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting January 11, 2006.
2007 Annual Validation Preliminary Review of Residential Algorithm & Estimate of Migrations February 27, 2007.
ERCOT 2003 UFE ANALYSIS By William Boswell & Carl Raish AEIC Load Research Conference July 13, 2005.
-- Presentation from PWG -- Workshop on Profile ID Assignment and Annual Review Process June 23, 2005.
1 Profiling Working Group Update to COPS April 15, 2015 Jim Lee (AEP) – Chair Sheri Wiegand (TXU) – Vice Chair.
Profiling Working Group January xx, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting January ??, 2006.
Residential Survey. Survey Objectives Develop a more accurate algorithm to predict the presence and use of electric heat for residential customers. Algorithm.
814_20 – Substation ID updates Background and Proposed Action Plan TX SET – 10/25/07.
RMSUpdate January 6, 2005 Retail Market Subcommittee Update to TAC.
RMSUpdate November 4, 2004 Retail Market Subcommittee Update to TAC.
Compiled by Load Profiling ERCOT Energy Analysis & Aggregation
1 AEIC Annual Load Research Conference September 12, Reno, NV ERCOT Residential Profile ID Assignments – Dealing with Assignment Accuracy and Migration.
Profiling Working Group January 11, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting January 11, 2006.
Profiling Working Group August 2, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for COPS Meeting August 22, 2006.
1 Commercial Operations Sub-Committee Update to TAC October 5, 2007.
1 Presented to ERCOT Retail Market Subcommittee January 9, 2002 Profiling Working Group Darryl Nelson, Chair Load Profiling Operating Guides (LPOG)
Residential Survey Task Force Update to RMS April 12, 2005.
Profiling Working Group December 11, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting December 11, 2003.
09/15/10 RMS RMS Market Reports – Recommendations Karen Farley Manager, Retail Customer Choice.
1 ERCOT LRS Precision Analysis PWG Presentation February 27, 2007.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Mandy Bauld ERCOT October 9, 2012 RTM SETTLEMENT TIMELINE.
Profiling Working Group March 14, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for COPS Meeting March 14, 2006.
10/13/10 RMS RMS Market Reports – Recommendations Karen Farley Manager, Retail Customer Choice.
1 PWG Update Report By Ed Echols Of Oncor ERCOT PWG Chair Jim Lee of Direct Energy ERCOT PWG Vice Chair for COPS Meeting Sept 10, 2014.
1 Follow Up Analysis of 2 vs. 3 Decimals ERCOT Load Profiling Department June 26, 2007.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Settlement Accuracy Analysis Prepared by ERCOT Load Profiling.
1 UFE Workshop Sponsored by COPS October 19, 2004.
LRS Progress Report and Action Plan Update to the Profiling Working Group July 24, 2006.
1 History of UFE (shortened version of presentation provided at UFE Taskforce Workshop on 9/14/2004) UFE Taskforce Meeting February 21, 2006.
Load Profiling Working Group RMS Presentation 8/01/2002 by Ernie Podraza Reliant Energy Retail Group Chair PWG.
1 Arguments for Continuing Residential Validation Improves Settlement Accuracy Improves UFE Profile Assignment is more correct Arguments to Stop Residential.
Profiling Working Group October 16, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting October 16, 2003.
1 ERCOT Load Profile Transition Option 1 – 4 Analysis August 21, 2006.
Commercial Operations Subcommittee Update to TAC September 7, 2012 Harika Basaran, COPS Chair 2012 Jim Lee, COPS Vice Chair 2012.
814_20 – Substation ID updates Background and Proposed Action Plan RMS – 11/07/07.
DRG Slides for PWG Update to COPS. 2 Highlights from the DGTF Recommendation - 3 Small DRG applies to generation less than 50 kW –Profiling is applicable.
COPS NOVEMBER 2014 UPDATE TO TAC 11/20/2014 Harika Basaran, Chair Tony Marsh, Vice Chair.
Distributed Renewable Generation Profile Implementation Plan.
Profiling Working Group June 15, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting June 15, 2005.
Profiling Working Group August 14, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting August 14, 2003.
Demand Response Task Force. 2 2 Outline  Overview of ERCOT’s role in the CCET Pilot  Overview of Stakeholder Process – What’s been done to date?  Questions.
Profiling Working Group April 14, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting April 14, 2004.
Profiling Working Group March 18, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting March 18, 2004.
RMSUpdate May 5, 2005 Retail Market Subcommittee Update to TAC.
February 2, 2016 RMS Meeting 1. * Reasons: * Per the ERCOT Board Report dated 8/5/14 there were 6.6M Advanced Metering System (AMS) Electric Service Identifiers.
1 Commercial Operations Sub-Committee Update to RMS November 10, 2005.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Profiling Working Group January 14, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting January 14, 2004.
Oil and Gas Profile Implementation Plan. 2 BUSOGFLT Background ERCOT received Oil and Gas Profile Segment request ERCOT completed.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting March 11, 2008.
Commercial Operations Subcommittee Update to TAC Debbie McKeever COPs Chair 2011.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting December 3, 2007.
1 ERCOT COPS Round 2 Sample Design Review April 10, 2007.
1 A Review of Impacts to UFE and Load Ratio Share Based on AV Profile ID Changes Presented by ERCOT Staff to the Profiling Working Group 10/26/2005.
COPS JULY 2013 UPDATE TO TAC 07/02/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
PWG Demand Response Follow Up Jackie Ashbaugh October 23, 2007.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting June 11, 2007.
PWG Profiling Working Group December 18, RMS Presentation by Ernie Podraza, PWG Chair Annual Validation 2002 DLC Implementation.
Profiling Working Group September 26, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting September 26, 2003.
-- Presentation from PWG -- Profile ID Assignment and Annual Review Process November 17, 2005.
Profiling Working Group
2016 Annual Validation Update PWG
Presentation transcript:

ERCOT Staff Comments Regarding the Proposed Suspension of Residential 2005 Annual Validation RMS Presentation August 10, 2005

2 Residential Annual Validation History Initial Validation began in October 2001 and was completed in September Annual Validation was bypassed because of the delay with Initial Validation 2003 Annual Validation was completed on schedule with some delay in completing submission of 814_20 transactions (scheduled: November 10, 2003; actual: January 2004) 2004 Annual Validation was suspended for Residential due to large volume of migrations 2005 Annual Validation is in progress with two milestone dates having been missed thus far: –algorithm testing completescheduled: May 1; actual June 7 –TDSP change file submissionscheduled: June 30; actual: July 22

Annual Validation Changes Active & De-Energized ESIIDs Initial Validation was completed in 2002, no AV 2002 New methodology implemented for AV 2003 to standardize Winter Ratio calculation across TDSPs by using calendarized monthly usage

Annual Validation Changes Active & De-Energized ESIIDs No methodology changes implemented for AV 2004 Residential AV 2004 cancelled because of high volume of changes

Annual Validation Changes Active & De-Energized ESIIDs Implemented three algorithm changes for Residential AV 2005 Changes reported above are based on TDSP calculations and are currently unverified

6 Residential 2005 AV Algorithm Changes Three Significant Changes Implemented for 2005 Annual Validation for Residential –Do not change RESHIWR to RESLOWR by default … do not override previous assignment made with complete data because of incomplete data this year –WR numerator > 20 required for RESHIWR … less than 20 kWH/day is not indicative of electric heating –Dead-bands (1.0 – 1.8) around WR to reduce migration RESHIWR to RESLOWR if WR ≤ 1.0 RESLOWR to RESHIWR if WR > 1.8 If previous assignment was a default, then RESHIWR if WR>1.5 RESLOWR if WR≤1.5 ERCOT analysis predicted a 50% reduction in migration as a result of these changes … as shown on previous slides, this has been realized

7 ERCOT Concerns with Proposed Suspension PWG and ERCOT Staff opinion has been that the three Residential algorithm changes implemented for 2005 are likely to result in an overall improvement in assignment accuracy … changes were approved by RMS and TAC A substantial and growing volume of Residential ESIIDs have default Profile ID assignments –As of October 2004, about 933,000 (18% of total) Residential ESIIDs were being settled with a default profile assignment (749,000 defaults from AV 2003 plus 184,000 new ESIIDs from May 2003 – October 2004) –By suspending Annual Validation for 2005 these ESIIDs will continue to be settled on default assignments until October 2006 –ERCOT estimates that 123,000 new ESIIDs will be added (and on default assignment) between November 2004 – October 2005 (note: based on the current Decision Tree, ESIIDs added after October of a particular year will have default assignments based on the following year’s Annual Validation)

8 ERCOT Comments on Proposed Suspension PWG and ERCOT Staff agree that the volume of Profile ID migration is still too high … continued improvement to the assignment algorithm is needed to make it more accurate and stable An accurate algorithm will have to take into consideration: –year-to-year weather changes –weather / consumption differences across weather zones –occupancy changes at the premise level –empirically derived kWh minimums and dead-bands –these algorithm changes are being considered for AV 2006

9 ERCOT Comments on Proposed Suspension ERCOT Staff will undertake analysis to determine whether completing 2005 Annual Validation will improve or degrade assignment accuracy –Use Residential Survey Results to compare current assignment accuracy versus accuracy of new assignment based on completing AV 2005 –Run test settlements for a sample of 2004 winter days (10 days each in December 2004, January 2005 and February 2005) with current assignment and then with new assignment... compare before- and after- UFE to quantify the impact of AV 2005 The analysis is expected to be available for review at the November RMS meeting and should be the basis for the ultimate decision on AV 2005 (continued)

10 ERCOT Staff Recommendation RMS recommends short term modifications for Residential AV 2005 to TAC and the Board per Protocols –Proceed with Annual Validation for Residential ESIIDs currently having default Profile ID assignments (~311,000 changes) –Temporarily suspend AV 2005 for the remaining Residential ESIIDs pending the findings of the proposed ERCOT analysis –Assign PWG an action item to analyze the impact of a schedule change for Residential AV and draft an LPGRR if appropriate Minimize the impact of Profile ID changes between settlement runs Minimize the lag between determining the need for Profile ID changes and submission of transactions to make the changes