MICE Safety System DE Baynham TW Bradshaw MJD Courthold Y Ivanyushenkov.

Slides:



Advertisements
Similar presentations
1 CM24 – 2 nd June 2009 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
Advertisements

Hydrogen R&D system HAZOP
Hydrogen Pre-Operation Safety Review 4 th October 2011 Hydrogen R&D System Operational Procedures and Test Plan M Courthold.
MICE OsC – 22 nd June 2010 Liquid-hydrogen system and absorber M Hills T Bradshaw M Courthold S Ishimoto W Lau I Mullacrane P Warburton.
MICE hydrogen review Commissioning, testing and operations.
Cooling Channel Count Recap Cooling channel components # Engineering? Absorber: temperature 8*3 yes pressure 2*3 yes He temp 2*3 level 8*3 yes length (optical)
1 MICE Hydrogen System Elwyn Baynham, Tom Bradshaw, Iouri Ivaniouchenkov RAL MICE / RAL Safety RAL, 30 October 2003.
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
Hydrogen Hazard Summary and Preliminary FMECA and HAZOP Yury Ivanyushenkov Elwyn Baynham Tom Bradshaw.
Provisional Hydrogen System Control Sequence TW Bradshaw Y Ivanyushenkov D Baynham MJD Courthold.
LH2 Absorber Design Mary Anne Cummings MICE Safety Review LBL Dec 9, 2003.
1 Status of Hydrogen System Development MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov, Tom Bradshaw, Elwyn Baynham, Mike Courthold,
1 MICE at RAL MICE Collaboration RAL, 2 November 2003 Elwyn Baynham, Tom Bradshaw, Iouri Ivaniouchenkov, Tony Jones, Jim Rochford Engineering.
MICE Hazard Overview and Analysis Elwyn Baynham Tom Bradshaw Yury Ivanyushenkov.
MICE RF Module Safety Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting February 12, 2005.
CM26 – 26 th March 2010 Step IV: Liquid Hydrogen Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
1 MICE Absorber working group Columbia, 13 June 2003 MICE Hydrogen System. Preliminary HAZOP. Elwyn Baynham, Tom Bradshaw and Iouri Ivaniouchenkov,
1 Hydrogen Safety System Summary MICE Collaboration Meeting, Osaka, August 1-3, 2004 Elwyn Baynham, Tom Bradshaw, Yury Ivanyushenkov Applied Science Division,
MICE AFCSWG Safety Review Summary Mary Anne Cummings Dec. 17, 2003 MICE Video Conference.
LH2 Absorber Design Mary Anne Cummings MICE Safety Review LBL Dec 9, 2003.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
A presentation at the MICE Video Conference on Wednesday the 5 th of May 2004 Response to the Safety review comments by Wing Lau -- Oxford.
1 New baseline for the magnet cooling system Yury Ivanyushenkov Engineering and Instrumentation Department, Rutherford Appleton Laboratory.
March 14, 2003 MICE Absorber/Coil Integration MICE LH2 Absorber 1.Assembly 2.Safety 3.Staging 4.Instrumentation.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
LH2 Absorber Design Mary Anne Cummings MICE Safety Review LBL Dec 9, 2003.
Matthew Hills Hydrogen System – Piping and Instrumentation Diagram.
Hydrogen R&D system HAZOP and failure analysis Yury Ivanyushenkov, Elwyn Baynham, Tom Bradshaw, Mike Courthold, Matthew Hills and Tony Jones.
Hydrogen Delivery System – R&D Activities T W Bradshaw M Courthold M Hills J Rochford Daresbury Controls Group etc…
Hydrogen system status Yury Ivanyushenkov for Elwyn Baynham, Tom Bradshaw, Mike Courthold, Matthew Hills and Tony Jones.
Mucool cryo-design Christine Darve Fermilab/Beams Division/ Cryogenic Department 8/12/02.
MICE Hydrogen System Design Tom Bradshaw Iouri Ivaniouchenkov Elwyn Baynham Columbia Meeting June 2003.
Absorber Design Details Mary Anne Cummings MICE MEETING Columbia June 13, 2003.
MICE Hydrogen System MICE Collaboration Meeting, CERN, 29 March-2 April 2004 Elwyn Baynham, Tom Bradshaw, Yury Ivanyushenkov Applied Science Division,
MICE hydrogen review Summary of system hardware. System function To provide 22 litres of liquid hydrogen for use as a muon absorber within a superconducting.
Mechanical Safety Systems and DSEAR Compliance
MICE Hydrogen System Tom Bradshaw Yury Ivanyushenkov Elwyn Baynham Meeting October 2004 – Coseners House.
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
The MICE Hydrogen System Summary Tom Bradshaw, Yury Ivanyushenkov, Elwyn Baynham, Tony Jones, Mike Courthold and Matthew Hills Rutherford Appleton Laboratory.
Iouri Ivaniouchenkov RAL Safety considerations at RAL July 9, RAL MICE Collaboration Meeting 1.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Detector DAQ Hardware Status o Introduction o Preliminary list o Plan for action o Summary Jean-Sebastien.
MICE Hydrogen Safety Functions IEC61508 Compliance & Emergency Procedures MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
MICE Hydrogen Control System MICE Collaboration Meeting CM33 27 th July 2012 PJ Warburton – STFC Daresbury Lab.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Conceptual Design Review of the NPDGamma Experiment in Beam Line 13 Seppo Penttila NPDGamma project manager September 25, 2007 at SNS.
Hydrogen Pre-Operation Safety Review 4 th October 2011 Results from Helium Commissioning M Hills.
1 MICE Mtg Oct 2002 Elwyn Baynham RAL Implementation of MICE at RAL Work done in Engineering and ISIS Departments Rutherford Appleton Laboratory Contributors.
The MICE Hydrogen System Safety Review Introduction Tom Bradshaw, Yury Ivanyushenkov, Elwyn Baynham, Tony Jones, Mike Courthold and Matthew Hills Rutherford.
MICE Hydrogen System Tom Bradshaw Yury Ivanyushenkov Elwyn Baynham Collaboration Meeting RAL October 2004.
MICE Hydrogen Control System MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
CM 28 – 6 th October 2010 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
MICE LH2 Absorber Safety Mary Anne Cummings Edgar Black (IIT) Abingdon, UK Oct. 30, 2003.
Hydrogen Control System MJD Courthold TW Bradshaw Y Ivanyushenkov D Baynham.
1 Status of infrastructure MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation.
1 Liquid Hydrogen R&D test report CM34 – 17/10/12 S Watson P Warburton M Courthold.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
1 MICE absorbers work package MPB – 27/10/15 Mike Courthold Mark Tucker Phil Warburton Steve Watson.
Replacing hydride bed with bottle Advantages No risk of diminished bed capacity Following jobs no longer necessary – Move pressure gauge – Replace cracked.
NPDG Liquid Hydrogen Target: Design and Safety Features
Absorber progress MICE-ISIS review of the liquid hydrogen system will be held in early January; guidance from Nominated Engineers on the imported absorber.
IT-4189 Supply and installation of a cryogenic distribution system
MICE Hall Summer Workplan
MICE Safety Review Meeting 4th Oct 2011 PJ Warburton - Daresbury Lab
Status of Hydrogen System Development
Presentation transcript:

MICE Safety System DE Baynham TW Bradshaw MJD Courthold Y Ivanyushenkov

Scope MICE hazards and solutions Hydrogen control and safety system MICE safety system

MICE Layout

MICE Phase I initial

MICE Phase I final

MICE Hazards Beam Radiation Fire Explosion Overpressure Material brittleness Skin burn Radiation HV=> Sparks HV RF LH 2 TrackerLH 2 Tracker Particle detectors High magnetic field => High mechanical forces Magnetic stray field Photo detectors and front-end electronics Optical fibres Photo detectors and front-end electronics Optical fibres HV TOF

Beam Radiation RF LH 2 TrackerLH 2 Tracker Radiation Particle detectors Radiation safety is achieved by: - shielding the beam line; - no access to the experimental hall when RF power is on; - local shielding of some bits of cryogenics equipment such as control electronics, cold boxes and valve boxes; - local shielding of detectors front-end electronics MICE Hazards: Solutions

Beam RF LH 2 TrackerLH 2 Tracker Particle detectors High magnetic field => High mechanical forces Magnetic field safety is achieved by: - passive magnetic shielding of both the MICE control room and the ISIS linac (brings magnetic field down to below 5 gauss-level in the public areas outside the experimental hall); - restricted access to the experimental hall. High mechanical forces on the MICE components are: - being analysed and understood ; - taken into the account in the MICE design. MICE Hazards: Solutions (2)

Beam RF LH 2 TrackerLH 2 Tracker Fire Explosion Overpressure Material brittleness Skin burn Radiation HV=> Sparks HV Particle detectors Hydrogen safety is achieved by: careful design of the hydrogen absorber : - FEA analysis of the windows (confirmed by tests); - avoiding cold surfaces where air might be plated; - a double barrier between hydrogen and air. careful design of the hydrogen system: - a closed system concept keeps hydrogen venting at the minimum; - hydrogen is stored as a solid compound in a hydride bed; - passive pressure relief system is implemented; - hydrogen zone is localised; - ignition sources are kept outside hydrogen zone. certification of all materials tests of sub-assemblies and assemblies test of complete system MICE Hazards: Solutions (3)

Instrumentation Pressure gauge Non-return valve - P P VP Vacuum pump Bursting disk Pressure relief valve Valve Pressure P Chiller/He ater Unit Helium supply Hydrogen supply P Nitrogen supply P P 1 m 3 P - P P VP Vacuum pump Bursting disk Pressure relief valve Valve Pressure regulator Coolant Out (20m 3 capacity) Metal Hydride storage unit (20m 3 capacity) P PP VP02 VP01 Heater / Chiller 1 bar diff PPPP Helium supply Hydrogen supply Extract hood P Nitrogen supply PP P P 1 m 3 Vent manifold PG01 RV06 PV01 PV18 PV03 PV05 PV07 PG03 P PG02 PV20 Test absorber module In Absorber volume 0.5 bar diff 0.9 bar diff PV19 CV04 CV17 RV10 BD09 HV bar diff RV bar diff BD12 HV11 PV14 High level vent Non return valve 0.1 bar RV21 Buffer vessel PV15 PP PV02 Argon jacket T TS3 T T TS1 Temperature sensor H2

Control logic – Fill Sequence Chiller on Set TS1_sp = TS1_initial PV2,3,5,7,14,17,18,19 closed CV4 closed PV1 open VP2 on, PV20 open Cooling System on Set TS2_sp = 15K Start Pressure Control Loop Start Vac Monitor Open PV2,3 Open CV4 TS1<TS1_sp And VG3<1mbar PG1  PG1_sp Close PV2&3 and CV4 Stop Pressure Control Loop Set TS1_sp = TS1_low Open PV5 LS1 > LS1_sp H2 System Ready Increment/Decrement TS1 Empty Sequence VG3<1mbar Vac monitor Pressure Control Yes No Yes No Yes No Note: ***_sp - set point

Empty Sequence Open PV7 Close PV2,3,4 Set TS1_sp = TS1_low Set TS2_sp = 20K Stop cryocooler Start Absorber Heater Control Loop LS1<LS1_low Empty Sequence Yes No Close PV1 PG2<0.1bar AND TS3>100K H2 System Empty Yes No 1bar<PG2<1.3bar Increment/Decrement TS3 Absorber Heater Control Yes No Stop Absorber Heater Control Loop TS3>30K Yes No

Helium Purge Sequence VP1 On Close PV1,14,17,18,19 Open PV2,3,5,7 Open CV4 100% Close PV19 Open PV18 Open CV4 5% to control flow VG5<1mbar H2 System Purged Purge Sequence No Open PV19 Yes 1bar<PG1<1.3bar AND 1bar<PG2<1.3bar Close PV19 Open PV18 Open CV4 5% to control flow VG5<1mbar No Close PV18, Open PV19, Open CV4 100% Yes 1bar<PG1<1.3bar AND 1bar<PG2<1.3bar Close PV19 Open PV18 Open CV4 5% to control flow VG5<1mbar No Close PV18, Open PV19, Open CV4 100% Yes 1bar<PG1<1.1bar AND 1bar<PG2<1.1bar Yes No Close PV18

MICE DAQ and Control System

Interfaces Hydrogen system MICE Safety system Hardwired status signals: ready (for use) / not ready, fault, H2 leak, H2 being vented PSI Solenoid Linde Fridge Fridge Ready (and in use) Fridge Ready Solenoid Powered Solenoid Quenched Solenoid Current Ramping 3 Signals from solenoid Fire alarm, power cut