ΑΝΝΕΧ 6 by SCIRO
WP5 Testing and Verification Objectives To verify that the prototypes fulfil the functional specification set in WP2 To produce possible recommendation for improvement of prototypes It is organised in 3 tasks: Verification Plan Verification Activities Verification Reporting
Task 5.1 Verification Plan It aims at setting up the verification plan, including: Functions to be verified Level of satisfaction Test timing The verification plan is set using the AFNOR standards
Task 5.2 Verification Activities The tests will be carried on accordingly with the Verification Plan instructions 30 wagons equipped At least 3 crossing-border lines Measurement will be done for on-line verification and off-line processing
Task 5.3 Verification of Performance It will determine the the technical performance of the system It will identify properly achieved results, and limits It will provide recommendation for design and implementation