Crab cavity location for 2-mrad x-ing December 7, 2004 A.S.

Slides:



Advertisements
Similar presentations
1 Collimation Simulations and Optimisation Frank Jackson ASTeC, Daresbury Laboratory.
Advertisements

Beam-Beam Effects for FCC-ee at Different Energies: at Different Energies: Crab Waist vs. Head-on Dmitry Shatilov BINP, Novosibirsk FCC-ee/TLEP physics.
Study of alternative optical parameters for the ILC final focus On-going work and plans Philip Bambade Laboratoire de l’Accélérateur Linéaire Université.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
January 2004 GLC/NLC – X-Band Linear Collider Peter Tenenbaum Beam Dynamics of the IR: The Solenoid, the Crossing Angle, The Crab Cavity, and All That.
1 4 Oct 05 Optimization of anti-DID for SiD, GLD and LDC A.Seryi October 4, 2005.
1 August 12, 2005 Running 2mrad IR in e-e- mode: BDS constraints A.Seryi August 12, 2005.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
1 27 Sep 05 Discussion of anti-DID ( “DIDNT” ? ) A.Seryi September 27, 2005.
Proposed machine parameters Andrei Seryi July 23, 2010.
BDS at reduced beam parameters 2nd Baseline Assessment Workshop on Reduced Beam Parameter set Andrei Seryi John Adams Institute 19 January 2011.
Matching recipe and tracking for the final focus T. Asaka †, J. Resta López ‡ and F. Zimmermann † CERN, Geneve / SPring-8, Japan ‡ CERN, Geneve / University.
1 IR with elliptical compensated solenoids in FCC-ee S. Sinyatkin Budker Institute of Nuclear Physics 13 July 2015, CERN.
Optimization of L(E) with SB2009 Andrei Seryi, for BDS and other working groups LCWS 2010 / ILC 2010 March 28, 2010.
16 August 2005PT for US BC Task Force1 Two Stage Bunch Compressor Proposal Snowmass WG1 “It’s the latest wave That you’ve been craving for The old ideal.
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
GDE questions, including one or two IRs Grahame Blair, Tomo Sanuki, Andrei Seryi for WG4 Snowmass, CO, August 25, 2005 Grahame Blair, Tomo Sanuki, Andrei.
Study of alternative ILC final focus optical configurations Dou Wang (IHEP), Yiwei Wang (IHEP), Philip Bambade (LAL), Jie Gao (IHEP) International Workshop.
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
ILC luminosity optimization in the presence of the detector solenoid and anti-DID Reine Versteegen PhD Student CEA Saclay, Irfu/SACM International Workshop.
ILC EXTRACTION LINE TRACKING Y. Nosochkov, E. Marin September 10, 2013.
Inputs from GG6 to decisions 2,7,8,15,21,27,34 V.Telnov Aug.24, 2005, Snowmass.
Cherrill Spencer, SLAC. MDI Workshop Jan '05 1 Impact of Crossing Angle Value on Magnets near the IP Overview of several unusual quadrupole designs that.
NLC - The Next Linear Collider Project Tor Raubenheimer Beam Delivery System Design Differences American Linear Collider Physics Meeting SLAC January 8.
Isabell-A. Melzer-Pellmann LET Beam Dynamics Workshop, Lumi scans with wakefields in Merlin Lumi scans with wakefields in Merlin Isabell-A.
Joint Belle SuperB Background Meeting Feb 9 – 10, 2012 SuperB SR bkgds 1 SR Backgrounds in SuperB M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni,
IWLC10, 18 th -22 nd October10, CERN/CICG 1 Global Design Effort Updates to ILC RDR Beam Delivery System Deepa Angal-Kalinin & James Jones ASTeC, STFC.
BDS/MDI Deepa Angal-Kalinin Andrei Seryi AD&I Meeting, DESY, May 29, 2009.
Brief review of past studies on Wakefield ATF2 Proj. Mtg K.Kubo.
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
Compensation of Detector Solenoid G.H. Wei, V.S. Morozov, Fanglei Lin JLEIC Collaboration Meeting Spring, 2016.
NEAR DETECTOR SPECTRA AND FAR NEAR RATIOS Amit Bashyal August 4, 2015 University of Texas at Arlington 1.
Wakefield effect in ATF2 Kiyoshi Kubo
Optics for x-ing IR Andrei Seryi November 5, 2004.
ILC BDS Commissioning Glen White, SLAC AWLC 2014, Fermilab May 14 th 2014.
Design challenges for head-on scheme Deepa Angal-Kalinin Orsay, 19 th October 2006.
Issues related to crossing angles Frank Zimmermann.
The design of the 2mrad extraction line Rob Appleby Daresbury Laboratory On behalf of the SLAC-BNL-UK-France task force ILC European Regional Meeting and.
1 April 1 st, 2003 O. Napoly, ECFA-DESY Amsterdam Design of a new Final Focus System with l* = 4,5 m J. Payet, O. Napoly CEA/Saclay.
JLEIC MDI Update Michael Sullivan Apr 4, 2017.
Momentum and Momentum Spread Measurements
ILC DR Lower Horizontal Emittance, preliminary study
Near IR FF design including FD and longer L* issues
Collimation Simulations and Optimisation
Interaction region design for the partial double ring scheme
Interaction Region of gamma gamma colliders
Benchmarking MAD, SAD and PLACET Characterization and performance of the CLIC Beam Delivery System with MAD, SAD and PLACET T. Asaka† and J. Resta López‡
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
D0 and its integrability
fundamental equations of LHC performance
The Interaction Region
The small crossing angle layout - where are we and what do we do now?
Updates on IR and FF for super-B factory
The 2mrad horizontal crossing angle IR layout for the ILC
Compensation of Detector Solenoid with Large Crossing Angle
XII SuperB Project Workshop LAPP, Annecy, France, March 16-19, 2010
First look at final focus part of super-B factory
ICFA Mini-Workshop, IHEP, 2017
Final Focus optics for Possible New B-Line
Crab cavity voltage in HL1.3
Discussion of gamma-gamma parameters
Push-pull cryo configuration C
Beam-Beam Effects in High-Energy Colliders:
Super-B Factory in a “4400m” Tunnel
Studies of crossing angle and SR effects for CLIC TENTATIVE
Kicker specifications for Damping Rings
Compensation of Detector Solenoids
100th FCC-ee Optics Design Meeting
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Option 1: Reduced FF Quad Apertures
Presentation transcript:

Crab cavity location for 2-mrad x-ing December 7, 2004 A.S.

Motivation In 2-mrad x-ing probably cannot install crab cavity in FD, because of its transverse size Try to place crab cavity in FF, far from FD For the moment, use NLC beamline and beam parameters, since it was easier to make a quick look

Place crab cavity near QF5 This may be not the best location, since there is dispersion & higher order terms here, but this is just a test NLC optics and nominal beam parameters were used in this test: 250 GeV/beam,  x0 =243nm,  y0 =3nm,  x *=8mm,  y *=0.11mm,  z =0.11mm. Energy spread: Batman distribution with 0.8% full width.

half_cross_angle = 10.0e-3; crab cavity effect not removed:  x /  x0 =  y /  y0 = For crab-cavity near QF5 and half_cross_angle = 10.0e-3; need kick with dangle/dz = e-4 1/m For comparison, for crab cavity 12m from the IP need dangle/dz = e-4 1/m Crab-cavity modeled as a thin element which produce z-x’ kick, including the energy dependence of the kick

half_cross_angle = 10.0e-3;  x /  x0 =  y /  y0 = Do no see any degradation of the beam size

Start to see effect on the beam size when the crossing angle ~50 mrad Half_cross_angle = 0.1  x /  x0 =  y /  y0 =

With 2mrad considered, this simple study show that it should be feasible to place crab-cavity in FF, far from FD. For  z =0.3mm ILC beam the effect may be larger, but even if so, the margin seems to be sufficient Still, location of crab cavity in FF need to be optimized (near QF9?). Also need to consider ILC optics and parameters (may be even easier, smaller energy spread), and any other implications. NLC optics and nominal beam parameters were used in this test: 250 GeV/beam,  x0 =243nm,  y0 =3nm,  x *=8mm,  y *=0.11mm,  z =0.11mm. Energy spread: Batman distribution with 0.8% full width.