Learning Objectives Distinguish between capacity strategies

Slides:



Advertisements
Similar presentations
3 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Process Strategy 3.
Advertisements

Scheduling.
Process Selection and Facility Layout
Strategic Capacity Planning & Aggregate Planning
Process Selection.
Process Choice and Layout Decisions in Manufacturing and Services
Process Choice and Layout Decisions in Manufacturing and Services Chapter 3.
INTRODUCTION TO BUSINESS
1-1 Operations Management Introduction - Chapter 1.
Facility Layout Facility Layout Facility Layout decisions translate the broader decisions about a firm’s strategy such as competitive priorities, process,
1 Manufacturing Processes BA 339 Mellie Pullman. 2 Process Choice & Layout.
Facility Layout 1. General Observations Facility Planning includes planning for: (1) the number of facilities and general facility type, (2) facility.
Operations Management
Improving Productivity & Quality
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Business Process A logically related sets of tasks or activities geared toward some business outcome. 1. Primary (value-added) 2. Support 3. Developmental.
Process Selection and Facility Layout
Process Selection and Facility Layout
Operations Management
Dr. Osama Al-Habahbah Automation Chapter 1 Introduction.
Process Selection and Capacity Planning
CHAPTER 12 DESIGNING THE DELIVERY PROCESS. 2 PROCESS INNOVATION IN SERVICE- DELIVERY SYSTEM n Initial Analysis – Customer for service : customer type.
MBA 8452 Systems and Operations Management MBA 8452 Systems and Operations Management Product Design & Process Selection —Service.
Chapter 10 – Facility Layout
Process Choice and Layout Decisions in Manufacturing and Services
McGraw-Hill/Irwin  The McGraw-Hill Companies, Inc. 2007, All Rights Reserved PROCESS SELECTION Chapter 4.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection Facilities Layout Line Balancing.
© 2007 Pearson Education Process Strategy Chapter 4.
Introduction to Business 3e 9 Part III: Management Copyright © 2004 South-Western. All rights reserved. Improving Productivity and Quality.
ALL MCQS
Chapter 10 – Facility Layout
Chapter 9 : Layout Strategies
Copyright 2011 John Wiley & Sons, Inc. Chapter 5 Operations Management 5-1.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Processes, Technology, and Capacity Operations Management -
Process Selection Chapter 3, Part 2. Intermittent Operations Intermittent operations: processes used to produce a variety of products with different processing.
Ch. 20: Operation systems Learning Objectives Distinguish among various types of production and manufacturing processes. Describe product innovation.
McGraw-Hill/Irwin.
6-1Process Selection and Facility Layout William J. Stevenson Operations Management 8 th edition.
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 5 Manufacturing and Service Process Structures McGraw-Hill/Irwin.
3-1 McGraw-Hill/Irwin Operations Strategy Copyright © 2008 The McGraw-Hill Companies, Inc. All rights reserved. Process Technology Chapter 3.
1 Lean Office – Layout & Cells
Operations Fall 2015 Bruce Duggan Providence University College.
Amrinder Kaur Process Selection.  Process Process a set of transformations of input elements into products with specific properties, characterized by.
Copyright © by Houghton Miffin Company. All rights reserved.1 Financial & Managerial Accounting 2002e Belverd E. Needles, Jr. Marian Powers Susan Crosson.
Manufacturing and Service Processes
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
1 ME Production Planning and Inventory Control.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 8 Facility Layout.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
STRATEGIC CAPACITY MANAGEMENT Chapter Five Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
©The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin Chapter 4 Processes: Turning Resources into Capabilities.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 7: Manufacturing Processes
Process Choice and Layout Decisions in Manufacturing and Services
Supply Chain Management Principles
The University of Jordan Mechatronics Engineering Department
BUSI Operations Management
Facilities and Aggregate Planning
Process Selection and Facility Layout
PRODUCTION SYSTEMS Terminology Concept: Production: Performance:
FACILITY LAYOUT Facility layout means:
Process Selection and Facility Layout
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Facilities Planning and Design Course code:
Process Selection and Facility Layout Lecture 5. Forecasting Product and Service Design Technological Change Capacity Planning Process Selection Facilities.
Process Selection and Facility Layout
CHAPTER 6 Process Planning.
Capacity Planning For Products and Services
Copyright ©2016 Cengage Learning. All Rights Reserved
Presentation transcript:

Learning Objectives Distinguish between capacity strategies Identify and explain economies of scale Compare and contrast the seven manufacturing process structures Compare and contrast service process structures Describe four operations layouts Use break-even analysis for process selection

Class 6: Chapter Five Manufacturing and Service Process Structure Class Six Plan Earlier chapter slides on COB faculty homepage Trimester exam # 1 specs & expectations News of Note Anger is not a strategy (Bloomberg) Lessons of 1984, 1994, and 1996 –Listen t Some thoughts on 14% poverty rate Did the rich get richer? How oir will the poor vote? Stay focus on: jobs, deficits, healthcare and education Only 4% of college graduates are unemployed Kentucky tuna anyone Australian Catholic church bans popular songs from funerals An Overview of Chapter Five

Capacity Planning Capacity: the amount of output that can be created by, a process, with a given level of resources over a given time period

Economies & Diseconomies of scale Economies of Scale: as volume increases, unit costs decrease to an optimal level Diseconomies of Scale: unit costs increase as an operation’s size increases Cost per Unit Volume (Number of Units) Diseconomies of Scale Economies of Scale Figure 5-1

Capacity Planning Decisions Time Frame (time required for changes) Limiting Resource Types of Capacity Change Examples Short term (0-6 months) Low-skilled labor Over-time, part-time, temporary labor, layoffs Restaurant wait staff, bank tellers, production line workers   Equipment, space Rental, leasing Landscaping equipment, temporary storage Medium term (6-24 months) Specialized labor Hiring, firing, contract labor Engineers, accountants, machine operators, physicians Leasing, subcontracting, equipment installation and renovation Distribution/warehousing, fast-food restaurant rebuild, production line renovation Long term (2+ years) Physical plant New building, outsourcing Automotive plant open or closure, new office building Table 5-1

Product-Process Matrix Project High Variety Flexibility Cost Low Mass Customization Job Shop Batch Repetitive Process Cellular Manufacturing Continuous Process Low Volume High Figure 5-2 5–6

Process Structure and Market Orientation Engineer to Order (ETO): unique, customized products Make to Order (MTO): similar design, customized during production Assemble to Order (ATO): produced from standard components and modules Make to Stock (MTS): goods made and held in inventory in advance of customer orders

Service Process Matrix Low High Service Factory Service Shop Labor Customization/Customer Interaction Low High Mass Service Professional Service Intensity Figure 5-3 5–8

Activity Think of an example of each: Service Factory Service Shop Mass Service Professional Service Think of the last service you purchased: What category was it? What changes can you suggest to move it to another category? What could be the advantages of the changes? 5–9

Service Blueprinting Customer actions: all actions done by customers during service delivery Front office: employee actions in the face-to- face encounter Back office: behind the scenes activities Support processes: activities necessary for the service, done by employees without direct customer contact Physical evidence: tangibles the customers see or collect from the organization 5–10

Service Blueprinting Figure 5-4 5–11

Operations Layout Fixed position: product cannot be moved during production Process layout: groups together similar resources Product layout: resources arranged by regularly occurring sequence of activities 5–12

Line Balancing in Product Layouts Used to assign individual tasks to work areas for a desired output rate Determine precedence relationships Calculate Takt time Determine minimum number of work stations = Total of all task times/takt time Determine efficiency = [sum of all task times/(actual work stations X takt time)] X 100 5–13

Line Balancing A B C D E F G Task Predecessors Time (minutes) A Shape dough None 2 B Add pizza sauce 1 C Add cheese D Add sausage 0.75 E Add pepperoni F Package pizza D, E 1.5 G Label package 0.5 Total Time: 8.75 A B C D E F G 5–14

Break Even Analysis Figure 5-4 5–15

Manufacturing/Service Process Summary Strategic capacity decisions include when, where and how much to adjust Economics/Diseconomies of scale affect costs per unit Product-process matrix classifies processes based on volume and variety Service are categorized by customization and labor/capital intensity Services processes can be front or back office Layouts should fit with processes used Process automation affects costs and capabilities 5–16