Status of Electronics & Control System P J Smith University of Sheffield 16/12/2009.

Slides:



Advertisements
Similar presentations
Making the System Operational
Advertisements

11 MANAGING DEVICE DRIVERS Chapter 11. Chapter 11: MANAGING DEVICE DRIVERS2 OVERVIEW Understand the relationship between hardware devices and drivers.
MICE Target Report Video Conference 15/03/07 Chris Booth Sheffield 15 th March 2007.
MICE Target Electronics, DAQ and BPS MICE/ISIS Target Meeting 17 th September 2010 P J Smith – University of Sheffield.
1 © Copyright 2008 EMC Corporation. All rights reserved. EMC | Captiva Citrix Support for ISIS Captiva EMC Corporation.
The MICE Target Lara Howlett University of Sheffield.
Arecibo Telescope Servo & Drive System Technical Meeting May 2004 VERTEX ANTENNENTECHNIK GmbH Arecibo Telescope Servo Drive System Ideas For Computer.
The MICE target and the ISIS BPS system By Edward Overton 1.
SDN and Openflow.
Presents The Silver Family An Integrated Approach to Processors, Data Communication and Head End Integration.
MICE Electronics Upgrade P J Smith (University of Sheffield) J Leaver (Imperial College) 17 th June 2009.
Status of Electronics and Control System P J Smith University of Sheffield 20 th August 2009.
MICE Target Electronics & DAQ Update P J Smith University of Sheffield 2 nd December 2009.
MICE Electronics & DAQ P J Smith University of Sheffield.
MICE Electronics Update Mice Target Workshop – Dec 2010 P J Smith James Leaver.
MICE Target Report Chris Booth (for target team) Sheffield 7 th May 2009.
MICE Target Schedule Chris Booth Sheffield 12 th June 2006.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Detector DAQ Test bench in Geneva o Preparing for Test Beam o FE electronics tests o Detector.
By Rashid Khan Lesson 7-Preparing for Output: Printer Configuration and Management.
P J SmithUniversity of Sheffield1 MICE Target Electronics Paul J Smith University of Sheffield Fermilab 10 th June 2006.
Target Monitoring and Control Current status DAQ card – NI 6254 Analog/Digital card Problems with Linux version drivers Currently reading up to 12 channels.
Target Real Time software Current status DAQ card – NI 6254 Analog/Digital card Problems with Linux version drivers Currently reading up to 12 channels.
Target Online Software J. Leaver 01/12/ /06/2015Imperial College 2 Target Controller Software Software for Stage 1 upgrade nearing completion –Hardware.
Target Control Electronics Upgrade 08/01/2009 J. Leaver P. Smith.
Target Controller Electronics Upgrade Status P. Smith J. Leaver.
Maintaining and Updating Windows Server 2008
Ion source RF system Andy Butterworth BE/RF Mauro Paoluzzi BE/RF 14/11/2013Linac4 ion source review.
Installing and Troubleshooting Hardware Device and Drivers Chapter 6 powered by dj.
Tracker QA Test Station Status. 29/08/2015Imperial College 2 Updated QA Scan Definition Scan definition: 1 –One 300 mm scan  r to V (1) 25 –Two 75 mm.
Module 10 Configuring and Managing Storage Technologies.
Hands-On Microsoft Windows Server 2008
12/09/2015Sheffield University 1 Target Electronics Recap - Decision has been made to rebuild the target electronics control system so that it is upgraded.
S A Griffiths Target Review Jan 2009 Target Electrical / Control Schematic HexBridge Power electronics Interface PSU Capacitor Bank Local Control Interface.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
Imperial College Tracker Slow Control & Monitoring.
Module 7: Fundamentals of Administering Windows Server 2008.
MICE Controls Progress 15 th March 2007 * Controls Infrastructure * Controls network * Target * Superconducting Solenoid * Magnet Power Supplies * Hydrogen.
Automated Industrial Wind Tunnel Controller By Daniel Monahan and Nick DeTrempe Advised by Dr. Aleksander Malinowski.
MICE MICE Target Mechanism Control Electronics Upgrade P J Smith – University of Sheffield James Leaver – Imperial College 2 nd March 2009.
Team Project: A Surveillant Robot System Little Red Team Chankyu Park (Michel) Seonah Lee (Sarah) Qingyuan Shi (Lisa) Chengzhou Li JunMei Li Kai Lin SW.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
24/10/2015Sheffield University 1 Target Electronics Recap - Decision has been made to rebuild the target electronics control system so that it is upgraded.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
Pre-OTS Testing in Penticton Sonja Vrcic Socorro, December 11, 2007.
MICE Target - Risk Lara Howlett University of Sheffield.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
Stepper Motor Control, PLC vs VME Herb Strong, Pam Gurd Spallation Neutron Source Oak Ridge National Laboratory October 17, 2007.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
Chiller control system Lukasz Zwalinski – PH/DT.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Shiuan-Hal,Shiu To-do-list and schedule 1. Things need to do before beam comes 2 Generate new trigger matrix for test beam base on the final geometry.(1)
Proposal for an Open Source Flash Failure Analysis Platform (FLAP) By Michael Tomer, Cory Shirts, SzeHsiang Harper, Jake Johns
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
Programme for “Target 3” – test of alternative bearing materials (from Jason Tarrant) –Drawing updates by 11 th November –Bearings: Material approval –
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
JORGE JUAN RODRÍGUEZ PEDRO GARIBI DESCRIPTION OF THE IMPLEMENTATION OF WP6 TO 9 IN DELIVERABLE D9.1.
Maintaining and Updating Windows Server 2008 Lesson 8.
MICE Target – Status & Plans Chris Booth Sheffield 28 th February 2006.
Target Installation Plan
MICE Target Report Video Conference 29/11/07
LCLS-II 2K Cold Box Controls Design Review
Update on CSC Endcap Muon Port Card
Chapter 11: Printers IT Essentials v6.0 Chapter 11: Printers
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Presentation transcript:

Status of Electronics & Control System P J Smith University of Sheffield 16/12/2009

19/06/2015University of Sheffield 2 Target Controller Hardware Single key to ‘Enable’ system Hardware for Stage 1 upgrade is now complete –May need to add extra wires if additional outputs are required – but already have 3 spare BNC’s on back panel

19/06/2015University of Sheffield 3 Target Controller Firmware Core control firmware is complete & functionalCore control firmware is complete & functional Remaining work primarily involves integration of control logic & USB interface –Have demonstrated rudimentary Target operations under computer control (park/hold & start/stop actuation) –Need to expose full functionality to USB interface for integration with EPICS Also require an interlock to prevent Target Frame from lowering if Target not in hold position (& to raise Frame in the event of any serious error condition) –Logic exists in FPGA, but need to route Frame inhibit signal from MLCR to Target Frame Controller (can use existing spare cable) & build small relay switch interface –Daresbury need to update Frame Controller PLC wiring/logic – planned for January

19/06/2015University of Sheffield 4 Target Controller Software Software also nearing completion –Hardware driver framework in place User interface has been defined –Have implemented all EPICS server / client functionality Tested using ‘virtual’ Target Controller Device Remaining work: implement low-level hardware driver ‘plug-in’ –Being developed in parallel with firmware/USB interface integration task

19/06/2015University of Sheffield 5 ISIS BPS ISIS requires a MICE Target BPS signal –All other targets in ISIS produce them – MICE cannot be an exception Normally require a BPS to be generated from 2 signals using 2 different technologies Valid signals must be ‘hardwired’ – cannot be produced in firmware/software –Cannot use Target controller FPGA Need robust methods of checking whether Target has dropped Will require some level of redesign of Target hardware –Addition of limit switches? –Additional optical readout channel? –Have not yet commenced work on this – it will not be trivial Craig will set up a meeting early next year between Paul S & Mark Arnold, where implementation options will be investigated

19/06/2015University of Sheffield 6 Schedule Plan to have Stage 1 upgrade complete & installed by end of January However, Paul S has very recently been signed off work with a back problem Currently not possible to estimate when he will be fit to return This will cause an unknown delay to the project –Cannot predict whether installation before end of shutdown will now be possible

19/06/2015University of Sheffield 7 Summary Good progress with hardware, firmware & software –Remaining work primarily involves integration of firmware & software Need to implement a BPS signal – requires some Target redesign –Details to be worked out early next year Were on schedule to complete Stage 1 upgrade by end of January –Health issues mean this may not be possible (should know more by mid-January)