MICE FAC 15-07-2011 Alain Blondel 1 Summary of run meeting 8 August 2011 Present: Andy Nichols Tim Hayler Pierrick Hanlet Gail Hanson Linda Coney Victoria.

Slides:



Advertisements
Similar presentations
K. Long, 18 April, 2015 Beam-line status — red sky at night?
Advertisements

MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
MICO 22 nd February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
MICE Commissioning Issues Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO Meeting—RAL.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 26, 2010.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
A Tale of Two Targets … 7 th September 2009 Chris Booth The University of Sheffield.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 4, 2011.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO April 6, 2009.
Computing Needs Panel Marco Apollonio, Linda Coney, Mike Courthold, Malcolm Ellis, Jean-Sebastien Graulich, Pierrick Hanlet, Henry Nebrensky.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 19, 2010.
CMPB Alain Blondel 14 April STATUS OF MICE.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
Alain Blondel MICE Funding Agency Committee MICE status report Most of the technical progress has been covered in the open session except the.
MICE Video meeting Alain Blondel 7 December MICE -- what running strategy? reflections on steps I and II.
MICE VC Alain Blondel 10 January MICE VC Jan 2008 MICE news -- BEST WISHES TO ALL FOR main outcomes of MICO meeting 9 January --
1 MICE CM28 STEP III or STEP IV? – some practicalities Andy Nichols/Tim Hayler, STFC 4 th October 2010 Considerations Step II Step III Step IV Conclusions.
Spokesmouse’s News Agenda: o VC 22nd April o 12th-13th May posters for EPAC (Vittorio Palladino) o VC 20th May o VC 17th June o CM27 (RAL) 7th-10th July,
Physics Program and Runs: Autumn 2011 & Step IV V. Blackmore MICE Project Board, 08/03/12.
Linda Coney MC VC May 19, 2011 MICE Operations Manager Report.
MICE CM 30 Collaboration Board Summary. Agenda 1. Approval of minutesBooth 2. Spokeʼs remarks & EB reportBlondel 3. Strathclyde request to join MICEKevin.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be Jun at IIT and the 19th at Fermilab right before the.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
Particle Production in the MICE Beamline IPAC10 Linda Coney, UC Riverside, Adam Dobbs, Imperial College London, Yordan Karadzhov, Sofia University The.
MICE VC 10-Oct-2013 Alain Blondel 1 MICE NEWS VC 162 LOTS OF THINGS HAPPENED! have arrived at RAL: -- EMR (see report today) -- AFC2 see pictures -- SS2.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MOM Report Paul Hodgson Paul Soler Victoria Blackmore VC-139: 14/04/111/8.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
MICE VC Alain Blondel 1 MICE NEWS MICE VC 161 Agenda Overall schedule Magnetic field mitigation review Status of things.
MICE VC116 Alain Blondel 18 December MICE NEWS See more details in Macolm’s MICE news!
MICE VC MOM Report, 25 th February 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - Machine Physics and User Runs - Suggestions.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
MICE CMPB Alain Blondel 1 Highlights on MICE.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
Running plan Step I.1 Basic radiation levels. I.1.1 ISIS running with beam elements on, target off, beam stop shut. Establish permanent MICE monitoring.
VC117 February 2009Jean-Sébastien GraulichSlide 1 MOM Report o Yagmur Torun ( June 15 - July 14) o J.S. Graulich ( July 13 - August 7) Jean-Sebastien Graulich,
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
MICE MICO Alain Blondel 23 December MICE Commissioning needs 22 December 08.
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
EMR detector lying beam-face up in Geneva workshop.
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
PId (ToF, CKoVI, EMCAL) V. Palladino et al MICEVC Frascati & Fermilab test beams in July Analysis in progress: MICE PID PhConf 4, 31 Aug aiming.
MICE VC 12/2/20091 [23/1-19/2] MOM report Hogdson Apollonio Zisman 23/1/09 12/2/09 19/2/09 Relevant Issues: - NO target since december accident  no data.
MICE news video conference 15 march MICE NEWS 1.TOF0/1/2 funding 2.MICE Installation/Commissioning/Operations group (MICO) 3.Important issues from.
MICE CM30 Goals of the Meeting Alain Blondel 1 MICE CM30 – Goals and Status.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
Beamline Update Adam Dobbs, MICE CM38 Feb Contents Recent and Upcoming Activities Target Conventional magnets Decay Solenoid Proton Absorber Summary.
MICE, Uni-Geneva and the transnational access to MICE (MICE-TNA)
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
Linda Coney MICO June 6, 2011 MICE Online Report.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
MICE Step IV Commissioning: Overview (March-April 2015) Milorad Popovic MAP 2015 Spring Collaboration Meeting.
MICE RLSR – 13Nov2013 Alain Blondel 1 MICE Project Board 14 November 2013 Alain Blondel.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
MICE PM Report Progress with the Infrastructure A few problems
Presentation transcript:

MICE FAC Alain Blondel 1 Summary of run meeting 8 August 2011 Present: Andy Nichols Tim Hayler Pierrick Hanlet Gail Hanson Linda Coney Victoria Blackmore Lucien Cremaldi Alan Bross Yagmur Troeun Paul Hodgson Henry Nebrenski Galina Vankova Adam Dobbs Mike Zisman Mike Courthold Maurizio Bonesini Ruslan Asfandiyarov Ken Long + Anyone I forgot Agenda 1.Report from Target: what happened and plans HodgsonReport 2.What data have been taken in June-July 2011 VictoriaWhat 3.ISIS schedule in Q and Q Pierrick 4. PM comments consequences of additional running Nichols 5. EMR plans — Ruslan Asfandiyarovplans 6. Cherenkov needs — Lucien Cremaldineeds 7. TOF needs — Maurizio Bonesinineeds 8.AoB : Coney (online group), Rayner (analysis) Courthold (DK solenoid)AoB Charge: to discuss the consequences of the target failure and the running schedule of MICE between now and March The baseline assumption is that we replace the target with a new one in December-January and run with it for the 'EMR run' in March. The question is if we need some additional running in October- November. TRANSPARENCIES:

MICE FAC Alain Blondel 2 A Boundary Conditions 1.Overall schedule (see next slide) restarts 19 Sep11, 14 Nov11, 6 Feb12 Insertion of new target in ISIS must be done in shut downs (best) or in run-ups but then must stop beam. 2. Target. Two possibilities T2.9 (with new shaft, and partly new optical fibers) install asap. after test in R78 (possibly in September still) run it until e.g. it breaks or replace for step IV. T3.x wait for new stator and brand new target. likely Jan Decay solenoid: power supply has signs of weakness. Needs understanding and repair. Ongoing Notes. B Desires TOF needs to calibrate TOF0 and TOF1 to be sure of quality of new tubes 1 solid week of running 2.Cherenkov needs to demonstrate that it works Use TOF calib runs + 1 day of dedicated scan 3.Online Group needs to run MICE regularly and commission online reco 4. no need before March for EMR and Step I commissioning

MICE FAC Alain Blondel 3

4 Conclusions will run for TOF/Cherenkov/Online in the fall ISIS user run, for two weeks, conditional to: 1) debugging the new target 2)having a fully reliable decay solenoid 3)the TOF/CKOV/online champs (c/o Maurizio, Lucien and Linda) being present Additional circumstances -- BPM will be taken out of beam (Craig to disconnect) -- Linearity of quads to be measured with Hall probes -- downstream detectors (TOF2, KL) are not in the way of step IV plates installation -- if delay in step IV installation is serious, we will try to recover some time from March 2012 run.