Group M3 Nick Marwaha Craig LeVan Jacob Thomas Darren Shultz Project Manager: Zachary Menegakis April 4, 2005 MILESTONE 11 LVS & Simulation DSP 'Swiss.

Slides:



Advertisements
Similar presentations
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Nov. 05 Overall Project Objective : Dynamic Control.
Advertisements

Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Noise Canceling in 1-D Data: Presentation #7 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Feb 28 th, 2005 Functional.
Overall Project Objective: To design a chip for a SCUBA diver that does real-time calculations to warn the diver of safety concerns including decompressions.
Viterbi Decoder: Presentation #10 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 10: 5 th April Final Design Corrections.
Encryption Transaction with 3DES Team W2 Yervant Dermenjian (W21) Taewan Kim (W22) Evan Mengstab(W23) Xiaochun Zhu(W24) Objective: To implement a secure.
Noise Canceling in 1-D Data: Presentation #9 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Mar 23 rd, 2005 Full chip.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Noise Canceling in 1-D Data: Presentation #12 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 April 11 th, 2005 Final.
Noise Canceling in 1-D Data: Presentation #13 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 April 20 th, 2005 Short.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage VI: February 25 h 2004.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 3: Feb. 4 th Size Estimates/Floorplan Overall Project Objective: Design an.
Viterbi Decoder: Presentation #11 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 11: 12 th April 2004 Short Final Presentation.
DSP 'Swiss Army Knife' Team M3: Jacob Thomas Nick Marwaha Darren Shultz Craig T. LeVan Project Manager: Zachary Menegakis Overall Project Objective: General.
Huffman Encoder Project. Howd - Zur Hung Eric Lai Wei Jie Lee Yu - Chiang Lee Design Manager: Jonathan P. Lee Huffman Encoder Project Final Presentation.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 10: April 5th Chip Level Simulation Overall Project Objective: Design an.
Noise Canceling in 1-D Data: Presentation #10 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Mar 28 rd, 2005 Chip Level.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 11: April 12th Short Final Presentation Overall Project Objective: Design.
Group M3 Jacob Thomas Nick Marwaha Craig LeVan Darren Shultz Project Manager: Zachary Menegakis April 11, 2005 MILESTONE 12 Final LVS & Simulation DSP.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Camera Auto Focus Presentation 4, February 14 th, 2007 Team W1: Tom Goff (W11) David Hwang (W12) Kate Killfoile (W13) Greg Look (W14) Design Manager: Bowei.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 27 Overall Project Objective : Dynamic Control.
M3: ProDiver 525 *Kavita Arora (M3-1) Lisa Gentry (M3-2) Steven Wasik (M3-3) Karolina Werner (M3-4) Stage : 2 Feb 04 Size Estimates/ Floor Plan Overall.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 4 MAD MAC th February, 2006 Gate Level Design.
1 Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 5 MAD MAC nd February, 2006 Top Level Integration.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Noise Canceling in 1-D Data: Presentation #10 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 April 4 th, 2005 Chip.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 9: March 31st Chip Level Simulatio Overall Project Objective: Design an Air-Fuel.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 3 MAD MAC th February, 2006 Size estimates/Floor.
M3: ProDiver 525 *Kavita Arora (M3-1) Lisa Gentry (M3-2) Steven Wasik (M3-3) Karolina Werner (M3-4) Stage : 9 Mar 29 Chip Level Simulation Overall Project.
Group M3 Nick Marwaha Craig LeVan Jacob Thomas Darren Shultz Project Manager: Zachary Menegakis March 16, 2005 MILESTONE 8 Functional Blocks DSP 'Swiss.
1 Team M1 Enigma Machine Milestone April, 2006 Adithya Attawar (M11) Shilpi Chakrabarti (M12) Mike Sokolsky (M14) Design Manager: Prateek Goenka.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage VII: March 1 st 2004.
Group M3 Jacob Thomas Nick Marwaha Craig LeVan Darren Shultz Project Manager: Zachary Menegakis April 25, 2005 Final Presentation DSP 'Swiss Army Knife'
Encryption Transaction with 3DES Team W2 Yervant Dermenjian (W21) Taewan Kim (W22) Evan Mengstab(W23) Xiaochun Zhu(W24) Objective: To implement a secure.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 8: March 24th Chip Level Layout Overall Project Objective: Design an Air-Fuel.
Sprinkler Buddy Presentation #8: “Testing/Finalization of all Modules and Global Placement” 3/26/2007 Team M3 Kartik Murthy Panchalam Ramanujan Sasidhar.
Group M3 Craig LeVan Jacob Thomas Nick Marwaha Darren Shultz Project Manager: Zachary Menegakis February 14, 2005 MILESTONE 4 Gate Level Design DSP 'Swiss.
Group M3 Nick Marwaha Craig LeVan Jacob Thomas Darren Shultz Project Manager: Zachary Menegakis February 23, 2005 MILESTONE 6 Component Layout DSP 'Swiss.
Sprinkler Buddy Presentation #7: “Redesign of Adder Parts And Layout of Other Major Blocks” 3/07/2007 Team M3 Kalyan Kommineni Kartik Murthy Panchalam.
Group M3 Nick Marwaha Craig LeVan Jacob Thomas Darren Shultz Project Manager: Zachary Menegakis March 23, 2005 MILESTONE 9 Chip level LVS DSP 'Swiss Army.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Viterbi Decoder: Presentation #6 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 5: 23 rd Feb Component Simulation Design.
Camera Auto Focus Presentation 3, February 7 th, 2007 Team W1: Tom Goff (W11) David Hwang (W12) Kate Killfoile (W13) Greg Look (W14) Design Manager: Bowei.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 5: Feb. 18 th Component Layout Overall Project Objective: Design an Air-Fuel.
Viterbi Decoder: Presentation #7 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 7: 1st Mar Component layout (corrected)
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 4: Feb. 11 th Gate Level Design Overall Project Objective: Design an Air-Fuel.
Group M3 Nick Marwaha Craig LeVan Jacob Thomas Darren Shultz Project Manager: Zachary Menegakis February 28, 2005 MILESTONE 7 Component Layout DSP 'Swiss.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Group M3 Nick Marwaha Craig LeVan Jacob Thomas Darren Shultz Project Manager: Zachary Menegakis February 21, 2005 MILESTONE 5 Component Layout DSP 'Swiss.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Camera Auto Focus Presentation 4, February 14 th, 2007 Team W1: Tom Goff (W11) David Hwang (W12) Kate Killfoile (W13) Greg Look (W14) Design Manager: Bowei.
Viterbi Decoder: Presentation #4 Omar Ahmad Prateek Goenka Saim Qidwai Lingyan Sun M1 Overall Project Objective: Design of a high speed Viterbi Decoder.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
M2: Team Paradigm :: Milestone 7 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Group M3 Jacob Thomas Nick Marwaha Darren Shultz Craig LeVan Project Manager: Zachary Menegakis February 2,2005 MILESTONE 3 Size estimates/Floorplan DSP.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Encryption Transaction with 3DES Team W2 Yervant Dermenjian (W21) Taewan Kim (W22) Evan Mengstab(W23) Xiaochun Zhu(W24) Objective: To implement a secure.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Mon. Nov. 24 Overall Project Objective : Dynamic Control.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Nov. 11 Overall Project Objective : Dynamic Control.
1 Design Goal Design an Analog-to-Digital Conversion chip to meet demands of high quality voice applications such as: Digital Telephony, Digital Hearing.
Viterbi Decoder: Presentation #9 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 9: 29 nd Mar Chip Level Simulation Design.
Group M3 Jacob Thomas Nick Marwaha Craig LeVan Darren Shultz Project Manager: Zachary Menegakis April 20, 2005 MILESTONE 13 Short Final Presentation DSP.
Integrated VLSI Systems EEN4196 Title: 4-bit Parallel Full Adder.
EE141 Project: 32x32 SRAM Abhinav Gupta, Glen Wong Optimization goals: Balance between area and performance Minimize area without sacrificing performance.
Presentation transcript:

Group M3 Nick Marwaha Craig LeVan Jacob Thomas Darren Shultz Project Manager: Zachary Menegakis April 4, 2005 MILESTONE 11 LVS & Simulation DSP 'Swiss Army Knife' Overall Project Objective: General Purpose Digital Signal Processing Chip

STATUS Design Proposal (Done) Architecture (Done) Size Estimates/Floorplan/Verilog (Done) Gate Level Design (Done) Testing of Top-Level Schematic (Done) LVS of Entire Chip (98%) LVS of FP Adder (Done) LVS of FP Multiplier (Done) LVS of Delay for Comb (Done) Simulations (50%) To Be Done Connect Few Remaining Bus Lines at Top Level Top Level Simulation Optimizations – Add Buffers & Reduce White Space

DESIGN DECISIONS Modified Registers to Improve Testing Added Reset Vertically Stretched FP Adder Reduces need to use Metal4 to allow room for global routing along left side

STRATEGY for TESTING & CRITICAL PATH ESTIMATION Strategy for Testing Test the main components individually Floating Point Adder Floating Point Multiplier Comb Test the top level Simpler to more complex inputs Critical Path Currently determining, but believe it’s a particular path through the FP_Adder

LAYOUT – Delay (Comb)

LAYOUT – FP LVS version /02/ :45 (intelibm5) $ Like matching is enabled. Using terminal names as correspondence points. Net-list summary for /afs/ece.cmu.edu/usr/nmarwaha/cds/LVS/layout/netlist count 949nets 39terminals 1111pmos 1111nmos Net-list summary for /afs/ece.cmu.edu/usr/nmarwaha/cds/LVS/schematic/netlist count 960nets 39terminals 11cds_thru 1111pmos 1111nmos Terminal correspondence points 1A 2A 3A 4A 5A 6A 7A 8A 9A 10A 11A 12A 13B … The net-lists match. …. It LVS’d!

LAYOUT – FP LVS version /02/ :45 (intelibm5) $ Like matching is enabled. Using terminal names as correspondence points. Net-list summary for /afs/ece.cmu.edu/usr/nmarwaha/cds/LVS/layout/netlist count 1068nets 37terminals 1232pmos 1232nmos Net-list summary for /afs/ece.cmu.edu/usr/nmarwaha/cds/LVS/schematic/netlist count 1130nets 39terminals 62cds_thru 1232pmos 1232nmos Terminal correspondence points 1FP_1 2FP_1 3FP_1 4FP_1 5FP_1 6FP_1 7FP_1 8FP_1 9FP_1 10FP_1 11FP_1 12FP_1 13FP_2 … The net-lists match. … It LVS’d!

FLOORPLAN – Last Week

TOP LEVEL LAYOUT - Current

SIZE ESTIMATES Transistor Count: 33,654 Area: 423x429 µm (181,467 µm 2 ) Density: ~0.185 Aspect Ratio: ~1:1

VERIFICATION – Top Level Verified all of the functions for the ‘Swiss Army Knife’ in Schematic. Plotted outputs using custom made code & MatLab. From plots it is evident that the accuracy is excellent.

SIMULATIONS – FP Adder ExtractedRC: Rise Time / Fall Time: ~ 1.5ns

SIMULATIONS – FP Mult ExtractedRC: Rise Time / Fall Time: ~ 1.5ns / 500ps

PROBLEMS & QUESTIONS Buffering – Need to Reduce Rise/Fall Times Need to Reduce White Space Improve Density Verified Design & Applications of Both Circuits (w/ & w/o Complex Numbers - Soft IP) w/ DSP TA