1 Subsystem Reviews Reviews this week: RFCC modules RF Power Infrastructure MICE Infrastructure LH2 system.

Slides:



Advertisements
Similar presentations
1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
Advertisements

1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
Cooling Channel Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE Collaboration.
1 MICE Video Conference Reception of FC magnets Andy Nichols, STFC,
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
K. Long, 16 June, 2015 MICE Muon Beam. Beam line and decay solenoid: Pressure reducing valves: Fitted to Q7—9; To be fitted to Q4—6 Upstream MLI: Plan.
MICE Collaboration meeting at LBNL: 9 ~13 th Feb, 2005 Force reaction analysis Stephanie Yang Feb 10 th, 2005.
Global Magnet Systems including Field Mapping MICE Project Board 28 th June 2011 M Courthold – RAL R Preece - RAL.
1 Project Manager Report Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
1 UKNF/MICE OsC PM report Summary assessment of MICE Risks, pressures and worries Project management Electrical substation, accommodation Redefining the.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
1 MICE Project Board Schedule and milestones Reconstructing the schedule Present status Monitoring and feedback Key schedule drivers and concerns Andy.
1 MICE Funding Agency Committee PM report Overview Organisation and project management Schedule reconstruction The Step IV subsystems Andy Nichols, STFC,
MICE Collaboration Meeting March 29 - April 1, CERN MICE Integration Edgar Black/IIT March Room.
1 RF Power infrastructure Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
Integration March 18, 2004 Latest MICE integrated lattice layout Edgar L.Black IIT.
RFCC Module Tech Board Schedule Discussion Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 4, 2009.
MICE AFC Group phone conference on 27 January 2005 AFC module progress By Wing Lau, Oxford.
MICE Collaboration Meeting Harbin, China 13 – 17 January 2009 Integration Issues By Wing Lau, Oxford University.
MICE VIDEO Conference 17 th December 2003 Report on AFCSWG Safety Review -- Future Plan By Wing Lau -- Oxford.
1 MICE-UKNF Oversight Committee MICE Project Manager Report Contents: New schedule and its implications Preparations for Steps II & III Spectrometer solenoids.
1 MICE CM28 STEP III or STEP IV? – some practicalities Andy Nichols/Tim Hayler, STFC 4 th October 2010 Considerations Step II Step III Step IV Conclusions.
1 Project Manager Report Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
1 MICE CM32 Summary Scheduling and planning; aims for this year Schedule update Main schedule drivers Keeping us on schedule Comment on Steps V & VI Detail.
1 PM report International & UK programmes Overview Reconstructing the schedule The UK Project Management team Progress with major subsystems Substation.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
UKNF/MICE PSAG, 3/5/11 Spectrometer solenoids: –Repair plan still ‘in approval’, already two months late –Workshop/mini review at LBNL 10 th /11 th May.
Infrastructure Update As at 11 th March 2009 Remaining four plates now fitted to North shield wall North & South walls and all galleries are considered.
1 MICE PSAG PM report Brief overview Re-planning the project Solenoids, decay and spectrometer Open issues and worries Andy Nichols, STFC, PSAG, 5/5/10.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
1 MICE PM Report Completion of Infrastructure Target, solenoids Phase Two planning & schedule Non-MICE costs Staffing & visitors Don’t have time for a.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
1 Project Manager Report Andy Nichols, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
Normal Conducting RF Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory March 5-6, 2013.
1 MICE CM28 Schedule & Risk Comment Schedule reconstruction and management The ‘straight to Step IV’ discussion How a schedule meeting can work Risks (and.
Norman McCubbin1 Report from the Collaboration MICE Project Board (CMPB) Norman McCubbin Director, Particle Physics Department MICE/UKNF Oversight Committee.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
Engineering Summary Agenda: Clarification of cooling channel tolerances – Tim Open issues with absorber integration – Andy/Wing.
1 MICE PM Report Outcome of Reviews held at CM22 –Motivation for holding them –Outcomes & actions –Observations & follow-ups MICE Video Conference, 20.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
1 MICE PM Report Summary since CM21 Decay solenoid Infrastructure progress Step One Installation Worries MICE Video Conference, 19 th June, 2008.
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
1 MICE CM27 PM Report Re-defining the UK project this FY Schedule things Apologies and accommodation Andy Nichols, STFC 7 th July, 2010.
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
1 MICE PM Report General Update –Phase I nearing completion –MICE Power –Actions for Decay solenoid & target –Follow-ups from last VC –Conclusions MICE.
1 MICE Schedule Review no 1 Aims of review and description of review charge Motivation and external drivers Aims of the review A few of the problems Description.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
MICE – Video conference Alain Blondel, 17 December   MICE selected NEWS: Future meetings Safety review Study of controls Gateway I & Toward Gateway.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
Progress on Hydrogen R&D System Yury Ivanyushenkov on behalf of Elwyn Baynham, Tom Bradshaw, Mike Courthold Matthew Hills, Tony Jones MICE Collaboration.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
1 OPTICS OF MICE STEP V.0 Ulisse Bravar University of New Hampshire 26 June 2005.
1 MICE absorbers work package MPB – 27/10/15 Mike Courthold Mark Tucker Phil Warburton Steve Watson.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
1 MICE Absorbers work package MPB – 17/04/15 RAL Tom Bradshaw Vicky Bayliss Mike Courthold Matt Hills Andy Nichols Roy Preece Mark Tucker Steve Watson.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
The MAP 3-Year Plan Mark Palmer Fermilab September 26, 2014.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
1 MICE Coupling Coil Cryostating and Test Steve Gourlay March 1, Office of Science.
1 MICE CM29 Engineering Summary Cooling channel moving platforms – Norbert Floor Beams and plates – Andy L Magnetic modelling – Mike RF Engineering – Andy.
Comments on the February DOE Review
MICE CM28 Engineering Session Summary (On behalf of Wing)
MICE CM31 Schedule summary
Presentation transcript:

1 Subsystem Reviews Reviews this week: RFCC modules RF Power Infrastructure MICE Infrastructure LH2 system

2 Observations & Actions RFCC module: In very good shape – in strong position for manufacture of cavities and vac-vessel Need to make sure that all cooling channel elements have common tolerance and dimension pattern for flange hole PCDs – Wing to organise RF Power Infrastructure Andy Moss will prepare plan of the system configuration within one month for approval within MICE, then submit to external experts for comment RAL team must start to look at integrating amplifiers and stuff at RAL - action Tim

Observations & actions MICE Infrastructure –Hadn’t taken place before I wrote this! LH2 system –I believe our biggest worry: –R&D hardware has been stalled for > six months –Mike & Matt to intervene urgently with AS Scientific and RAL contracts –Indecision over control system philosophy has clearly stalled HAZOP review schedule –So yet more meetings to address the above –Really have to make sure the right people attend –Real problem here is inability to work in parallel with Decay solenoid and FC projects 3