TRD Status Meeting Münster 23.1.2006 Clemens Adler TRD ROC Status Status Meeting Münster 23.1.2006.

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

TRD Production at GSI Joerg Hehner TRD Collaboration Meeting Bucharest
TRD Collaboration Meeting GSI Clemens Adler TRD Chamber production issues General Issues, Planning and Hd Status.
TRD Status meeting Münster Clemens Adler TRD ROC Status The long and winding road to production start.
Supermodule Space-Frame Integration Backpanel L6C1, L0 Bernd Windelband, Uni Heidelberg ALICE-TRD status meeting, at KIP.
TRD ROC Status Clemens Adler TRD Status Meeting TRD ROC Status.
TRD status meeting GSI Clemens Adler TRD (Pre-)Production Status New Results/Experiences Problematic issues Production Plans Timescale.
Hd Status and Planning TRD Chamber Construction Meeting Clemens Adler.
Status at P2 C. Lippmann Jan. 22, 2007 TRD DCS workshop at PI, Heidelberg.
/06/2015 Christian J. Schmidt GSI Production of ALICE TRDs Progress and Quality Development Alice TRD Chamber Production Meeting Darmstadt Feb.
TRD Collaboration meeting GSIClemens Adler First TRD Production Chambers Production Tests Results Documentation.
Chamber production status 75% of production (of 1st half of detector) reached in May Currently ~80% is produced 100% (1st half) expected in October. End.
TRD Status meetingClemens Adler TRD Production Status -Material -Tooling -Timescale.
TRD Status meeting GSI Clemens Adler TRD ROC Status.
TRD Status meeting IKFClemens Adler TRD ROC Status -Dubna -Bukarest -GSI -Frankfurt -Heidelberg.
8.7.04TRD Status meeting HdClemens Adler TRD ROC Status.
TRD Collaboration meeting GSIClemens Adler First Production Chambers Production/tests/results.
1 Peter Monaghan“Hall C January 2011 Users Meeting”15 th January 2011 SHMS Wire Chamber Update RECAP from August Review: Vendor price quote 5x larger than.
Technical Forum Alice week Clemens Adler Transition Radiation Detector Status Participating Institutions: Athens University, NIPNE Bukarest, JINR.
TRD Status meeting HeidelbergClemens Adler Chamber production Production status/ Material status.
TRD Status meeting GSIClemens Adler Chamber production Production status/ Material status.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
TRD Status meeting Alice week HdClemens Adler TRD Chamber Status News: New leak rate measurements Production is imminent Some material arrived Soldering.
Production NIPNE Completely finished and tested: L1C sent to GSI L2C sent to GSI L2C sent to GSI L3C Total: 36 =
Engineering Design Review for TRD-Readout Chamber
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia SCT week, Valencia, June 2002 Pre-series Low Mass Tapes 12 different lengths were produced for barrel.
Status of TRD Chamber and Readout Electronics Integration Ken Oyama and Christian Lippmann for the TRD Collaboration Sep. 26, 2005 TRD status meeting in.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Activities Status and Plan for the week D. Giugni / INFN Milano D. Giugni Monday Meeting
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
EC front unit status. Outline Conclusions from mechanical prototype and actions taken Status of electrical prototype KIT’s work for TA Dev plan (tests)
Mary-Cruz Fouz CIEMAT-Madrid Muon Week Bologna Apr03 Madrid Status Report.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
HEC strange signals 1 09 Feb 2012 E.Ladygin Status of HEC spikes study in Protvino E.Ladygin, M.Kazarinov, A.Kozelov.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
03/07/2000Status at TRIUMF1 Module Production Status Production Changes Material Production Status Status of Module Shipping Frame QC Status.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Status of NA62 straw electronics Webs Covers Services Readout.
JINR-BMBF Workshop, Dubna Clemens Adler PI Heidelberg ALICE TRD Transition Radiation Detector Overview and Status Clemens Adler Physikalisches.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
Hybrid panel heated plate study Currently the curing of the ASIC glue for the hybrid panels are done at room temperature. This is a study to determine.
SPD cabling issues I.Cable status II.Cabling inside VFE box III.Cable through chains (Gael) IV.Data spare cables V.Control bundles VI.Information for cabling.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
TRD Workshop RomaniaClemens Adler Heidelberg ROC Status Material procurement, Chamber Status TRD workshop Cheile Grandistei, Romania,
Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
1. Take HV harnesses with label (IHV2) and transfer on the Stacking table. 1.1 Inspect HV harnesses visually. 2.1 Insulate HV Flex with 3M™ VHB™ Tape.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
1 Fulvio TESSAROTTO CERN, 13/11/ COMPASS THGEM meeting Construction of the large size Hybrid Prototype The bulk Micromegas technology Examples of.
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
PA and Origami Status and Plan Koji Hara (KEK) Jan. 21, th Belle II VXD Workshop and 18th International Workshop on DEPFET Detectors and Applications.
D. De Gruttola SALE-01: issues with HV supply fixed SALE-01: issues with HV supply fixed QA weekly meeting 26/04/2016.
Berkeley status Aug 10th, 2012.
University of Wisconsin
Next steps toward the beam test
T1 Electronic status Conclusions Electronics Cards:
DOM integration meeting
Preparations for test of
Wiring the Light and Relay
Presentation transcript:

TRD Status Meeting Münster Clemens Adler TRD ROC Status Status Meeting Münster

TRD Status Meeting Münster Clemens Adler Dubna Dubna chambers at GSI: –4 have damaged radiator on inside –2 chambers had so little glue there was almost no connection to bottom plate. – 2 persons will come End of Feb. to reconstruct opened Dubna chambers at GSI. L6C0 radiators are cut to L0C0 radiators Need material now: –L0 panels, front profiles, glue, back panels (L0) should be shipped ASAP. –L-profiles will have to be shipped end of February.

TRD Status Meeting Münster Clemens Adler Bucharest 3 more (final, tested) chambers since last SM Waiting for GSI to build a chamber ‘fast’, to see effects of ‘slow glue curing’. “We still consider that there are unpredictable, unreproducible results in terms of current although the production steps are the same.” Transport of chambers to Germany: Trying hard top find transport company with climate controlled trucks, who allows accompanying person.

TRD Status Meeting Münster Clemens Adler GSI Production and testing goes very well currently

TRD Status Meeting Münster Clemens Adler Heidelberg Requested more Manpower to accommodate extra load on our workshop during SM integration and L-profile production (Stancu is missed severely). A chamber with unconnected anodes (and new glue) showed gain reduction: –Understood as high resistance connection via glue (~10^12 Ohm).

TRD Status Meeting Münster Clemens Adler Hd cont. Last year: Now: Unconnected Anode

TRD Status Meeting Münster Clemens Adler Frankfurt Chamber production: –3 Frames-Radiators glued. –5 back panels-pad planes glued. –Wire tension measureing device works now. –Will try to wire a chamber this week. Padplane production (60% TRD): –3 pad planes to be soldered. –25 pc. need repair.

TRD Status Meeting Münster Clemens Adler Material: Radiators Many Radiators are not glued well between bottom plate and frame: –Rethink production approach? –Improved QA? Radiator laminate spares used up for Dubna repair: –Few radiators will have to be rebuilt –Will wait until April for further ordering (money)

TRD Status Meeting Münster Clemens Adler Material: Profiles L-Profiles: –Production not started due to SM mechanics delay until End of Jan. –Dubna needs L’s in March (latest!!!), Frankfurt in Feb. -> 2-4 week chamber production delay possible. Front Profiles: –Production restarted last week (L0).

TRD Status Meeting Münster Clemens Adler Material: Wire Cathode wire: –New manufacturer (Little Falls Alloy): wire looks very nice

TRD Status Meeting Münster Clemens Adler QA (slide from Cheile Grandistei) L-profiles: to be seen (Choice of material) Radiator: sometimes bad gluing joints, L0C1: carbon laminate came off easily: has to be watched Glue (Epoxy comp.: Aw116, AW106): QA needed Anode wire: changing quality; QA: difficult Cathode wire: changing quality; QA difficult Back panel: Quality control at Fischer (Manfred Mast): OK Pad planes: Quality control in Hd/F: OK Wire ledges/distance ledge: no problems expected Field cage PCB: no problems expected HV cable: so far only 1 bad batch, new rolls are tested at Hd, OK Signal cables: so far no problems: new order needed soon Glue (Hardener): tested and bought in large quantities ???

TRD Status Meeting Münster Clemens Adler QA: Notable Items Radiator: bad gluing joints: ? Glue (Aw116, AW106, HV953U): GSI will make a proposal on QA procedures. Signal cables: (1-2k cables will be reordered): Comparison with old cables. (Electrical tests?) L-profiles: Bending should not occur anymore (change of material) Anode wire: Recent quality good, REM pictures Cathode wire: New manufacturer (LFA), REM pictures

TRD Status Meeting Münster Clemens Adler Database Stefan Zimmer working on DCDB chamber information part: –Structures (re-)defined –Stefan will make some changes to Peters Material Database. -> Then no excuse will be accepted for not putting in material and chamber data.