SVAC/PVOC&A Meeting, February 6, 2006 Anders W. Borgland 1 Instrument Analysis Activities Anders W. Borgland Science Verification, Analysis and Calibrations.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
Advertisements

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.31 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectMonthly Status Meeting Jan 26, Project Status January 26, 2006 Gamma-ray Large Area Space Telescope Lowell A. Klaisner Project.
SVACInstrument Analysis Meeting, October 7, 2005 Anders W. Borgland 1 CAL Calibrations And High Energy Muon Gain Anders W. Borgland Science Verification,
SVAC/ISOCInstrument Analysis Meeting, April 14, 2006 Anders W. Borgland 1 The LAT In Every Which Way You Want It! Anders W. Borgland Science Verification,
GLAST LAT ProjectIA Workshop 6 – Feb28,2006 Preliminary Studies on the dependence of Arrival Time distributions in the LAT using CAL Low Energy Trigger.
GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 1/31 Overview of End to End Runs Eduardo do Couto e Silva April 1, 2005 ( not it is not a joke, we finally.
SVAC/ISOCInstrument Analysis Workshop, February 27, 2006 Anders W. Borgland 1 Overview Of LAT Data Taking Anders W. Borgland Science Verification, Analysis.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
SVACInstrument Analysis Meeting, August 5, 2005 Anders W. Borgland 1 Announcements Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectOnline Roadmap Progress Report – April 22, 2004 R. Claus1 Online Roadmap to the July 2004 Freeze Progress report for April 22, 2004 (to.
GLAST LAT Project 1S. Ritz Discussion: To Where From Here? DC2 Closeout Meeting 2 June, 2006 S. Ritz Gamma-ray Large Area Space Telescope.
GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 1/19 Summary and Future Plans Eduardo do Couto e Silva Instrument Analysis.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test J. Panetta 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope:
GLAST LAT Project Instrument Analysis Workshop 5 – 05/08/29 F. Piron & E. Nuss (IN2P3/LPTA – Montpellier) 1 Comprehensive review of CAL calibrations Gamma-ray.
GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 1/19 Introduction to the Workshop Series Eduardo do Couto e Silva Instrument.
A.Chekhtman1 GLAST LAT ProjectInstrument Analysis meeting, June, 24, 2005 CAL retriggering study with SLAC data. Alexandre Chekhtman NRL/GMU Gamma-ray.
SVAC/ISOCInstrument Analysis Meeting, April 21, 2006 Anders W. Borgland 1 LAT Data taking! Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
GLAST LAT Project Managers F2F 6/15/ Integration and Test 1 GLAST Large Area Telescope: Face to Face Managers Meeting LAT Integration & Test.
SVAC Instrument Analysis Meeting Aug 5, 2005 E. do Couto e Silva and Anders W. Borgland 1/7 SVAC 8 tower testing+ACD Anders and Eduardo.
GLAST LAT ProjectIA Meeting – June 17,2005 E. do Couto e Silva 1 New additions to the main page.
GLAST LAT Project Technical/Cost/Schedule Review 03/31/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
SVACInstrument Analysis Meeting, January 13, 2006 Anders W. Borgland 1 Data Is (Nearly) Here! Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectIA Workshop 6 – Feb28,2006 E. do Couto e Silva 1 Final Data Taking with SLAC (Data for Instrument Analysis Workshop 7) Eduardo do.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project Instrument Analysis Workshop June 7, 2004 Anders W. Borgland 1/16 What? Where How? Description of the Geometry What? Where How? Description.
SVACInstrument Analysis Meeting, September 23, 2005 Anders W. Borgland 1 GEM Discarded Events Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 1/7 Overview of Data Taking Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 1 Gamma-ray Large Area Space.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
ISOC/SVACInstrument Analysis Meeting, Quatorze Juillet, 2006 Anders W. Borgland 1 Announcements Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
GLAST LAT Project28 March 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
SVACInstrument Analysis Meeting, October 21, 2005 Anders W. Borgland 1 Announcements Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project 1S. Ritz Purposes of the Data Challenges “End-to-end” testing of analysis software. –define the ends –define the tests (what is success?)
GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 1/5 SVAC Status SVAC Status Eduardo do Couto e Silva April 22, 2004.
SVACInstrument Analysis Workshop IV Quatorze Juillet, 2005 Anders W. Borgland 1 Overview of Data Taking Anders W. Borgland Science Verification, Analysis.
GLAST LAT Project IA meeting, 21 April 2006 David Smith Bordeaux 1 Muons from Flight SoftWare (= “FSW”) See my WorkShopSix presentation to understand.
GLAST LAT Project Instrument Analysis Workshop #4, 14 July 2005 David Smith CAL calib at SLAC SVAC1 Stability of the CAL Calibrations Online script “suites”
GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 1/5 Final Proposal for Phase 1 and 2 SVAC, E2E Tests (hereafter LAT 70X, 80X) Eduardo,
Fermi Large Area Telescope (LAT) Integration and Test (I&T) Data Experience and Lessons Learned LSST Camera Workshop Brookhaven, March 2012 Tony Johnson.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT Project Technical/Cost/Schedule Review 06/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project Technical/Cost/Schedule Review 04/26/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT Project 1S. Ritz Data Challenge Planning Overview Purpose Boundary conditions Plan: –scope and progression of data challenges –schedule summary.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT Project IA Workshop 4 July 14, 2005 E. do Couto e Silva 1/7 Introduction to the Instrument Analysis Workshop 4 Eduardo do Couto e Silva July.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
Absolute time stamps Instrument Analysis, 16 June 2006 David Smith 1 Absolute LAT Timing David Smith CENBG/In2p3/CNRS Bordeaux, France.
GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
Acd Veto Latching The Acd front end electronics generate a veto primitive when a discriminator goes above threshold. But. The signal is split: One path.
Overview of Acd Reconstruction
GLAST LAT System Engineering
GLAST Large Area Telescope
GLAST Large Area Telescope Instrument Science Operations Center
Overview of Instrument Analysis Effort
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
Instrument Analysis Workshop Series
Overview Goal Study GEM variables in SVAC ntuple
GLAST Large Area Telescope:
GLAST LAT System Engineering
GLAST Large Area Telescope: I&T Test Readiness Review
SVAC Configuration Verification
Presentation transcript:

SVAC/PVOC&A Meeting, February 6, 2006 Anders W. Borgland 1 Instrument Analysis Activities Anders W. Borgland Science Verification, Analysis and Calibrations / Physics Verification and Optimization Data LAT

SVAC/PVOC&A Meeting, February 6, 2006 Anders W. Borgland 2 LAT Muon Data Is Here! All LAT SVAC muon runs are now: –Reprocessed: –Latest calibrations –Latest EngineeringModel release List of runs: –PDF file with all run numbers –Use only these runs for your analysis!

SVAC/PVOC&A Meeting, February 6, 2006 Anders W. Borgland 3 'Unexpected Features' Two bugs discovered: –Merit ntuple variable 'EvtRun': –Problem discovered by Bijan: »Run number for EvtRun did not always match the real run number –Declared as float instead of (unsigned) int in AnalysisNtuple –Will be incorrect for run numbers in the range we have in real data: »Truncated values –But, is correct for DC2 type runs numbers! –Correct run number is available in the SVAC ntuple: »RunID –ACD tile has wrong thickness: –Row 3, column 4 i.e. tile ID 34. –12 mm instead of 10 mm –Discovered by Eric – confirmed by Joanne –This bug is not in the DC2 geometry: »It was introduced when we made the overlap in the right direction

SVAC/PVOC&A Meeting, February 6, 2006 Anders W. Borgland 4 LAT Data Analysis Three main groups of analyses: –ACD –TKR –CAL Two points: –Analyses very sub-system oriented: –This is what we need to do in the beginning! »Want to make sure we understand the different subsystems when they are integrated.... LAT Data Analysis –But now it's time to do LAT Data Analysis ! –Not a single analysis/talk from Italy! –We miss you guys

SVAC/PVOC&A Meeting, February 6, 2006 Anders W. Borgland 5 Near Future: FSW Flight Software is here! –Power on/off going on right now. –Muons with FSW this week!!!!!!! –Will they look like LATTE muons? :-) LSF: –Data format changes: –LDF becomes LSF –Main difference for you: –Context information »We will get back to you about this –Your SVAC and Merit ntuples will look pretty much the same as now! Pipeline: –We're working hard on getting the pipeline to digest LSF/FSW: –Getting CCSDS packets to offline –Make the pipeline understand if it's LDF or LSF: »We will still take LATTE/LDF data once in a while –A new EngineeringModel release: »LSF reader –'We' means Heather, Bryson, Warren, Eric & Jim!

SVAC/PVOC&A Meeting, February 6, 2006 Anders W. Borgland 6 Summary Calibrated and reprocessed LAT muon data: –Now Available! We need YOU to look at it! –This is the data to analyze for the IA workshop! Final End2End muon runs: –Just before we ship the LAT to NRL LAT DATA ANALYSIS! Instrument Analysis Workshop : –February 27 and 28 –Just before the DC2 kickoff! –Have you registered?