Company LOGO www.company.com C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:

Slides:



Advertisements
Similar presentations
Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
Advertisements

Construction Contracting
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
Subcontracts 101 By Mitali Ravindrakumar USC Collaboration between Parties Perform Subcontractor Analysis Sponsor - Fund Project/Subcontr act Negotiate.
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
CONSTRUCTION ADMINISTRATION Preconstruction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
EFFECTIVE DELEGATION AND SUPERVISION
1 Preconstruction Site investigation, Scheduling, Estimating, and design Preconstruction Site investigation, Scheduling, Estimating, and design Prepared.
Project Close Out CTC-470.
KFUPM, Department of Construction Engineering and Management CEM 520 LIABILITY ALLOCATION AMONG THE PARTIES TO FIXED-PRICE CONSTRUCTIN CONTRACTS IN SAUDI.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
PROCEDURES FOR SELECTING THE CONTRACTOR
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Construction Engineering 221 Drawings and Specifications.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Using QBS A Qualifications-Based Selection Process Presenters: Ron Brenke, PE - QBS Manager.
Genesis Solar Module Brochure ™
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Construction: Legal Issues. Legal Issues In the Bidding Process Timing of various activities has legal implications. During the bidding process: –A bid.
Construction Management: At Risk. PROJECT MANAGEMENT STRUCTURE: Contractual Relationships Owner Architect/Engineer General Contractor Sub Construction.
Dr. Hany Abd Elshakour 9/7/ :22 PM1. Dr. Hany Abd Elshakour 9/7/ :22 PM2 Engineering Project: Participants and Life Cycle.
Presented by Molly Skorpik at the 2011 Montana Association of Dam and Canal Systems Conference Presented by Molly Skorpik at the 2011 Montana Association.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
CONSTRUCTION ADMINISTRATION Project Closeout Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate Program.
TOPIC-9- PROJECT ORGANIZATION
OPA Office Professionals Assist, LLP Contracts, Proposals and Estimating.
CHAPTER 3 Pre-Project Components. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser Learning Objectives: To discuss: Contract Review Development and Quality.
Construction Why Construction The Construction Which are closely related to swimmingly project completion Which Mean: every thing related to Project participants.
Company LOGO Introduction To An Example Project Prepared by: Alaa El Shorafa Munther Abdel-Hadi Ahmed El Zinati Shukri El Zaza Dr. Kamaleen Sha’th Supervision.
CHAPTER#08 MANAGEMENT OF TECHNICAL PROPOSALS AND SPECIFICATIONS Lecture No. 08 Course: Engineering Management 19 april 2013 MED DEPARTMENT, U.E.T TAXILA.
Specification & Quantities Estimating
Advanced Project Management Project Procurement/Contract Management Ghazala Amin.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
CONSTRUCTION ADMINISTRATION Measurement and Payment Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Agency Construction Management :CM NOT AT-RISK
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
Click on Next to continue Next Introductio n Inputs Tools and Techniques Outputs The process of managing procurement relationships, monitoring contract.
Copyright © 2012, Big I Advantage®, Inc., and Swiss Re Corporate Solutions. All rights reserved. (Ed. 08/12 -1) E&O RISK MANAGEMENT: MEETING THE CHALLENGE.
TOPIC-9- PROJECT ORGANIZATION
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
College of Engineering CIVE 4750 Using QBS A Qualifications-Based Selection Process Adapted from a presentation by QBS, Inc. 215 N. Walnut St. Lansing,
Division 1 – General Requirements ACT Objective O Learn to write Division 1 sections in a manner that governs but does not limit the content of.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
P RE - PROJECT P RE - PROJECT SOFTWARE QUALITY COMPONENTS Dr. Ahmad F. Shubita.
The Contract Management Process Post Award Activities.
Construction Management At Risk Process
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
The Intricacies of the Beginning and the End of a Project CM Leadership Manual Presented by: Todd Scholtz, LEED AP Carlos Sanchez, LEED AP BD+C.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
EFFECTIVE DELEGATION AND SUPERVISION
PWGSC - KOREA 2nd JCC Meeting Canadian Federal Real Property Construction Contracting Presentation by Bruce Fletcher Director General – CASMS - PWGSC November.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
CHANGE ORDER/CLAIMS MANAGEMENT MODULE 9. Change Order Management.
What Small and Emerging Contractors Need to Know Introduction to Project Delivery Methods © Copyright 2017 NASBP.
CONTRACT ADMINISTRATION
12.3 Control Procurements The process of managing procurement relationships, monitoring contract performance and making changes or corrections as needed.
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Speaker: Sarah Chambers, Esq. Claims Counsel| Professional Liability
Construction Management Services April 16, 2018
Presentation transcript:

Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by: Arch Eng. Mahmoud AL-Farra Construction Management Department Islamic university-Gaza Submit to: Dr. kamalain Shaat Construction Management Department Islamic university-Gaza Copyright c 2006 Mahmoud AL-Farra

Company LOGO 1.Quality Control Services 2.Start-Up And Final closeout 3.Legal considerations Contents C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006

Company LOGO QUALITY : It is a way of managing people and business processes to ensure complete customer satisfaction at every stage, internally and externally Some organization believe that the owner can never fully delegate quality assurance and control responsibility Some or all These duties are conventionally delegated to or administrated by the owner’s representative. 1.QUALITY CONTROL SERVICES: C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006

Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006

Company LOGO 1.Each project will require a sound plan for inspection, testing-laboratory and surveying. 2.On very large projects, all three services can be supplied by PCM. 3.Normally outside professional service contract for inspection, testing and surveying. 4.That services should first be scoped jointly with designer and then a joint owner’s recommendation. 5.The manager, owner & designer should all be aware the inspection, testing & surveying responsibilities assumed by each member of construction management team. 6.PMC must recognize the professional responsibility of the designer. 7.Designer must recognize the professional responsibility of the PCM. 8.On large construction projects, inspection can fully separated from contract management & administration. 9.Testing laboratories can be hired by the owner, architecture or PCM 10.One member of the team must be selected to monitor and manage. 1-1 Professional Construction Management : C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006

Company LOGO 11.Reports should be distributed to all member of the team. 12.For survey control, The PCM must provide basic line and grad for contractors. 13.On large projects a number of survey crews can be fully utilized by PCM, while on small & medium size projects all surveying can be perform on a part time, the preferable solution depend up on the job and area practice as well as on overall economy to the owner. 1-1 Professional Construction Management : C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006

Company LOGO Some government agencies are delegating quality control to the contractors on fixed-price contracts with only oversight role assigned to the owner. Conventional approach on fixed-price contracts is for the owner to retain inspection responsibilities either directly Design-construct projects constructed on a reimbursable-cost basis, it is common practice for the owner to delegate most or all of the quality responsibilities to the design-constructor. Lump-sum, the owner usually retains a major involvement in the area 1-2 General contractor : C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006

Company LOGO 2.1Start-up Much inspection & testing of components are don while the project is underway. As project nears completion, it is important to be sure that all components function well together as a total system. In some cases, this mainly involves testing, adjusting and correcting the major electrical piping and mechanical systems so that they perform at their optimum level This phase involves a warranty period during which the designer & the contractors can be called back to correct problems that were not immediately evident upon initial testing. 2.Start-up and final closeout : C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006

Company LOGO 2.2Final closeout To final acceptance documentation, PCM and General contractor may be responsible for big additional duties, either from job site or from the main office, like: 1.Furnishing or obtaining guarantees. 2.Operating information. 3.Spare parts. 4.Instruction manual. 5.As-built drawing bonds maintenance agreement. 6.Inspection certifications……….…etc Often an inspection is scheduled before the expiration of performance guarantees. All that points take along time and cost so CM must plan it in his schedule. 2.Start-up and final closeout : C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006

Company LOGO Owner’s consideration: There are potential claims in every construction project and in any contractual relationship. Field personnel must be thoroughly familiar with contract provisions, rights of the parties and concept of the contractual relationship. Claims can be much more readily adjudicated if the contract was understanding, so proper documentation will include: 1.Independent evaluation of merits of each item outlined in the claims. 2.Minutes of any negotiation meeting, including information that may be develop. 3.Early notification on the owner, an early request for legal assistance and advice. 4.Written approval of the claims settlement by the owner. 3.Legal consideration: C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006

Company LOGO Manager’s consideration: The position of the CM still remains somewhat unclear, Because of each contract will differ in its legal responsibilities. The usual position of PCM is that it has hired out his expertise as agent to the owner, and the owner should be responsible for business risks 3.Legal consideration: C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006

Company LOGO contractor’s consideration: The contractor works in very competitive environment Bid low enough to win and that will interrupted with drawings and specification. Drawings and specifications are subject to varying interpretation. varying interpretation will create conflict situation In this situation, mediation is beginning to have some initial success in setting such disputes 3.Legal consideration: C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006

Company LOGO R e p o r t T o w a r d s c o n f l i c t s i n c o n s t r u c t i o n p r o j e c t s A n d m e c h a n i s m o f i t s r e d u c i n g