AUTOMATED WELL PERMITTING Application for Arc Hydro Groundwater and MODFLOW Analyst.

Slides:



Advertisements
Similar presentations
ESRI Software ArcGIS –ArcMap –ArcEdit –ArcInfo –ArcView.
Advertisements

The Sacramento Regional Groundwater Model Derrick Whitehead Roseville City - Roseville, CA Norm Jones Aquaveo - Provo, UT Michelle Smilowitz Heatwave Data.
Business Process Modeling in Microsoft Visio® Interfacing’s BPMN Modeler: Overview.
THE SACRAMENTO REGIONAL MODEL Model Overview and Potential Applications Norm Jones Michelle Smilowitz.
Modeling tools.
Using ESRI ArcGIS 9.3 Arc ToolBox 2 (3D Analyst)
Taking Core Products a Step Further USG Software and Customized Applications.
GIS in Water Resources Fall 2011 Groundwater Tools for GIS.
West Hills College Farm of the Future. West Hills College Farm of the Future Where are you NOW?! Precision Agriculture – Lesson 3.
Arc Hydro Geodatabase Inventory Tool SWQM Program FY06 Arc Hydro Customization Project.
Floodplain Mapping using HEC-RAS and ArcView GIS Eric Tate Francisco Olivera David Maidment
GIS Topics and Applications
EAS781 Practical Geophysics: The Tools and How to Use Them ArcGis Introduction ArcView ArcInfo ArcGis ?
Integrating Historical and Realtime Monitoring Data into an Internet Based Watershed Information System for the Bear River Basin Jeff Horsburgh David Stevens,
Pre Conference Seminars 1 The Arc Hydro GW Data Model Toolkit Norm Jones Brigham Young University.
Implementing ISO Aleta Vienneau and David Danko ESRI.
GLY 521- Hydrogeology Modflow Packages. Block Center Flow (BCF) Package The BCF package is the central package for all solutions Specify the way each.
1 A GIS-Based Flood Inundation Mapping and Analysis Pilot Project Indiana GIS Conference February 19-20, 2008 John Buechler, The Polis Center Moon Kim,
Basic Spatial Analysis
Hydraulic Routing in Rivers
Arc Hydro groundwater data model: a data model for groundwater systems within ArcGIS ESRI user conference May 2004 Gil Strassberg and David Maidment, University.
Groundwater Modeling – 2: Computer Implementation
Uses of Modeling A model is designed to represent reality in such a way that the modeler can do one of several things: –Quickly estimate certain aspects.
MODFLOW – Introduction Organization & Main Packages
Copyright © 2005 Trimble Navigation Ltd. All rights reserved GPS Processing within the Geodatabase.
Arc Hydro Groundwater Data Model
Arc Hydro GroundWater Data Model and Tools.
III. Ground-Water Management Problem Used for the Exercises.
Major parts of ArcGIS ArcView -Basic mapping, editing and Analysis tools ArcEditor -all of ArcView plus Adds ability to deal with topological and network.
Internet and Distributed Representation of Agent Based Model by- Manish Sharma.
Nobody’s Unpredictable Ipsos Portals. © 2009 Ipsos Agenda 2 Knowledge Manager Archway Summary Portal Definition & Benefits.
Wendy Welch ADAPTING THE ARC HYDRO DATA MODEL AND TOOLS TO A HYDROGEOLOGIC FRAMEWORK KITSAP PENINSULA, KITSAP, MASON AND PIERCE COUNTIES, WASHINGTON.
RMsis – v Simplify Requirement Management for JIRA.
1.9 Production Wizard The Lumio Production Wizard is a suite including three applications, providing the following features: Creation of a set of configuration.
0 eCPIC User Training: Dependency Mapper These training materials are owned by the Federal Government. They can be used or modified only by FESCOM member.
Groundwater Modeling – 3 Transient Models Groundwater Hydraulics Daene C. McKinney.
An extension of the Arc Hydro Groundwater Simulation feature dataset
UC2008 Pre-conference Seminars 1 Subsurface Analyst, Modflow Data Model, MODFLOW Analyst Norm Jones (Brigham Young University) Gil Strassberg (Aquaveo)
An extension of the Arc Hydro Groundwater Simulation feature dataset
USGS Water Resources Discipline Charleston, WV District office Katherine Paybins GIS data and projects.
THE WESTERN PLACER COUNTY GROUNDWATER MANAGEMENT PLAN MODEL Project Review and Status Report Norm Jones Michelle Smilowitz.
Susan Blake – Infrastructure Information Coordinator, City of Sarasota Utilities Department Cameron Amrine – GIS Analyst, Stantec November 5, 2015 Creating.
ARC HYDRO GROUNDWATER & TIME Tim Whiteaker (UT Austin) Gil Strassberg (Aquaveo) David Maidment (UT Austin)
CFR 250/590 Introduction to GIS, Autumn 1999 Raster Analysis I © Phil Hurvitz, raster1.ppt 1  Overview Grid themes Setting grid theme and analysis.
CALL ENTER ACCESS CODE: # ENTER ATTENDEE ID: 3# For audio.
Joint Planning in Groundwater Management Area 12 Bill Hutchison, Ph.D., P.E., P.G. Director, Groundwater Resources Texas Water Development Board Lost Pines.
Model Status Update December 17, Agenda Purpose Model Conceptualization Recap Model Development Model Calibration Status Model Data for Review Next.
IX. Transient Forward Modeling. Ground-Water Management Issues Recall the ground-water management issues for the simple flow system considered in the.
Arc Hydro groundwater data model: a data model for groundwater systems within ArcGIS AWRA Specialty Conference Geographic Information Systems (GIS) and.
CE EN 547 – BRIGHAM YOUNG UNIVERSITY. 1. Build conceptual model object 2. Build coverages 3. Define grid frame 4. Build grid 5. Initialize MODFLOW 6.
Metropolitan Council Water Supply Planning in the Northwest Metro Water Availability Technical Focus Group : June 9, 2008 Lanya Ross Senior Environmental.
Application of Arc Hydro Groundwater and MODFLOW Analyst Automated well permitting.
Figure 1. Model Domain (Approximately 6 miles x 6 miles) Approx. 1-mile Proposed PEC Facility N.
UC2008 Pre-conference Seminars 1 Arc Hydro Groundwater Gil Strassberg (Aquaveo) Norm Jones (Brigham Young University) David Maidment (University of Texas)
William Perry U.S. Geological Survey Western Ecological Research Center Geography 375 Final Project May 22, 2013.
Update - April 2016 John Rodgers, P.E.(presented by Kelly Close, P.E.) cowaterinfo.com.
SIMULATION COMPONENT AND MODFLOW DATA MODEL. Simulation Component.
WELLS AND TIME SERIES DATA. Framework Temporal Aquifers & Wells.
WORKING WITH REGIONAL MODELS The Conceptual Model Approach.
XS2D COMPONENT. Outline  You can create 2D cross sections in ArcGIS  Cross sections are made of real GIS features  Cross sections use a (S, Z) coordinate.
DARIA AKHBARI FALL 2014 EDWARD’S AQUIFER POTENTIOMETRIC MAP.
AUTOMATED PARAMETER ESTIMATION Model Parameterization, Inverse Modeling, PEST.
Groundwater Modeling Assignment #2. Parts A and B.
Presented by Jon Traum, P.E.
Groundwater Learning objectives
Development and Application of a Groundwater-Flow Model of the Atlantic Coastal Plain aquifers, Aiken County, South Carolina to Support Water Resource.
Uses of Modeling A model is designed to represent reality in such a way that the modeler can do one of several things: Quickly estimate certain aspects.
Surface Analysis Tools
2New Jersey Department of Environmental Protection
The Future of HydroInformatics for Managing Water
Presentation transcript:

AUTOMATED WELL PERMITTING Application for Arc Hydro Groundwater and MODFLOW Analyst

Overview  Calibrated regional model is imported to ArcGIS as a “baseline” model  Candidate wells are added to baseline model using well package.  Impact of new well (changes in streamflows, drawdown, etc.) is analyzed using the MODFLOW OBS process, and standard model outputs  Wells can be accepted or rejected and database is updated automatically

 Prepare calibrated model  Establish Flow Observations  Import calibrated model into the ArcGIS  Read solution files and set a model “baseline” to which future runs will be compared Model Preparation The MODFLOW OBS process is used to compare baseline flow with simulated flows. Drain feature Observation name Observed value Simulated value Drain_Time Drain_Time Drain_Time Drain_Time4130 Drain_Time Output heads are copied to starting heads to facilitate drawdown calculations

 Step 1: User applies for a new well (coordinates, pumping rate, screen elevations).  Create a new feature in the Well feature class Candidate Well Analysis New Well (HydroID = 1001)

Candidate Well Analysis  Step 2: Create new instances in the WEL table. CellID represents MODFLOW i, j, k values SourceID is the HydroID of the well feature Custom tool that creates MODFLOW instances based on the location of the well and the screen elevations and finds the appropriate MODFLOW cell.

Candidate Well Analysis  Step 3: Export the new well data to the MODFLOW text file

Candidate Well Analysis  Step 4: Run MODFLOW simulation with candidate well  Use OBS process to compute new flows and rivers, drains, etc.  Export drawdown file as part of solution.

Candidate Well Analysis  Step 5: Read solution and compare to “base” simulation  Generate appropriate reports to guide well approval/rejection.  There can be a number of different criteria for comparison: o Changes in flows (observed vs. simulated equivalents) at key features. o Drawdown at key locations. o Drawdown maps o Capture zones (using MODPATH).

Case Study #1 - SRWMD Permitting criteria based on impact to streams, springs, etc.

Well Analysis Workflow Create new well  update well table  export well package file  run MODFLOW  import solution  build map layers

Case Study #1 - SRWMD Location of candidate well

Drawdown resulting from well

Changes in flows to sources/sinks

Case Study #2 – Virginia DEQ  Virginia Coastal Plain Model (VCPM)  10-layer MODFLOW model used to analyze impacts of candidate wells  Criteria based on state law  Potentiometric surface cannot fall below a critical surface (80% drawdown)  Area of Impact defined by drawdown = 1 ft Heads for layer 8

Well Permitting Workflow Create new well  update well table  export well package file  run MODFLOW  import solution  build drawdown map layer

AUTOMATED WELL PERMITTING DEMO Arc Hydro Groundwater

Products Area of Impact CellsArea of Impact Contour

GIS Products

For more information Norm Jones (AHGW Wiki page) (Info on tools)