All Experimenters’ Meeting January 09, 2012. Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.

Slides:



Advertisements
Similar presentations
Maintenance and Accelerator Support RHIC Run 12. RHIC species change completed: Major works in RHIC: Major works in RHIC: Power supply reconfigure (DO.
Advertisements

Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
Accelerator Support and Maintenance Run 14. Maintenance Tomorrow Major efforts RHIC: Major efforts RHIC: Access hrs. Access hrs. RA.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
F All Experimenters' Mtg - 9 Jun 03 Week in Review: 06/02/03 –06/09/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
HERA Week 50 Nov-Dec Running Shut-down at the end of the year Startup in January January-February Running.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
NICA INJECTOR Brief remarks on the status based on recent presentations and publications.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
PIP Update Feb 20 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Proton Improvement Plan (FY13 PMG Q1). William Pellico, Fermilab PMG, January FY13 Summary Q1 Task Summary – Highlights RFQ Injector Budget.
Maintenance and Accelerator Support RHIC run10. Last Wednesday: Nice recovery Nice recovery Good work all especially: Good work all especially: HP, RF,
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
Ff NO A Accelerator Upgrades: Status Phil Adamson Fermilab
Accelerator Support and Maintenance Run 14. Maintenance Tomorrow AGS hrs CA Specific Jobs only. AGS hrs CA Specific Jobs only. RHIC.
F All Experimenters' Mtg - 28 Jul 03 Week in Review: 07/21/03 –07/28/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
Maintenance and Accelerator Support RHIC Start Up 12.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
MiniBooNE Meeting 4/22/05 Eric Prebys 1 Status of the Proton Source Haud ignota loquor* Eric Prebys *I say things that are known.
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
Proton Plan PMG 7/7/05 E Prebys 1 Proton Plan Status June Report Eric Prebys.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
Getting the Booster to 2010 Eric Prebys December 20, 2002 Outine Longevity Issues Non-radiation related Radiation related Personnel Performance Issues.
Maintenance Nov 28, Accelerator Access LINAC will remain on RA. It is not yet running. LINAC will remain on RA. It is not yet running. Booster-
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
What’s Up in the Booster Eric Prebys February 27, 2002 and March 6, 2003.
Proton Plan PMG 2/23/06 E Prebys 1 Proton Plan Status January Report Eric Prebys.
Proton Plan Expectations Eric Prebys AD/Proton Source.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
Proton Improvement Plan (FY13 PMG Q3). William Pellico, Fermilab PMG, Aug PIP FY13 Q3 Summary Task Highlights Budget and Labor Review Summary.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
ATC-ABOPC Days 2008: Session 1 Summary ATC-ABOC days Summary Session; February Session coordinated by B. Mikulec AB-OP and O. Br ü ning AB-ABP Operation.
Agenda Safety Schedule Machine and system reports 2/26/2016G. Robert-Demolaize, Time Meeting1.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Summary Director’s Review August 2006 Eric Prebys.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
July 15, 2013 Photo by Greg Vogel. Shutdown Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster.
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Answers to Questions Director’s Review August 2006 Eric Prebys.
Proton Plan PMG 4/18/05 E Prebys/J. Sims 1 Proton Plan Status March Report Eric Prebys Jeff Sims.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
PIP Update March 6 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy.
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
All Experimenters’ Meeting November 4, Accelerator Operation Summary Calendar Week # 44 NuMI Weekly Integrated Intensity 5.97 E18 protons BNB.
July 29, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Trying to.
All Exp Mtg May 5, 2008 NuMI-MINOS Status Report – Tingjun Yang FAR DETECTOR: 99.7% live time (wall clock) Everything was running pretty smooth NEAR DETECTOR:
Accelerator Support and Maintenance Startup for Run 13.
Maximum Credible Beam Loss in the Main Injector D. Capista January 26, 2012.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
MI/RR Status January 3, 2014 D. Capista. MI Preformance.
Friday, Feb 12, 2010 Accelerator Status1 Accelerator Week in Review Part I: Regular 9am Scheduling Meeting –Crew Chief Summary –24 hour machine summaries.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
Pre-Meeting Meeting Brian Drendel Accelerator Shift Plot.
Accelerated Protons and Personnel Doses
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Alexander Herlert, CERN (PH-SME-IS)
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Presentation transcript:

All Experimenters’ Meeting January 09, 2012

Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly Integrated Intensity 5.56e18 protons MTest Weekly Integrated Intensity 1.03e14 protons Beam Hours To NuMI hours Beam Hours To MiniBooNE hours From : December 19, 2011 (0000 hours) To: December 26, 2011 (0000 hours)

Accelerator Operation Summary Calendar Week # 52 NuMI Weekly Integrated Intensity 1.00E19 protons BNB Weekly Integrated Intensity 6.15e18 protons MTest Weekly Integrated Intensity 9.81e13 protons Beam Hours To NuMI hours Beam Hours To MiniBooNE hours From : December 26, 2011 (0000 hours) To: January 02, 2012 (0000 hours)

Accelerator Operation Summary Calendar Week # 01 NuMI Weekly Integrated Intensity 9.32E18 protons BNB Weekly Integrated Intensity 5.72e18 protons MTest Weekly Integrated Intensity 2.96e13 protons Beam Hours To NuMI hours Beam Hours To MiniBooNE hours From : January 02, 2012 (0000 hours) To: January 09, 2012 (0000 hours)

Status /Work Completed/Plans Proton Source – Tuning & Studies – Switched to H- Source – Booster RF repairs Main Injector – Tuning & Studies – Kicker & RF maintenance – Abort vacuum valve solenoid NuMI – Running Well – Detector Hall Cooling MiniBooNE – Running Well – MB extraction PS Regulation MTest – T-1019 Done – T-958 Running

Future Access Plan We would like to replace another Solid State Power Amplifier & Modulator in Booster. It will take about 8 hours. The current plan is to install it on January 18 th, (This will be the 5 th pair)