IceBridge Science Team Meeting Agenda Thursday January 20, 2011 1:00 Science Team Progress (2 min, one vu-graph summary from each team member) 1:30 Cryosat.

Slides:



Advertisements
Similar presentations
The Re-Start Meeting Warren County School Strategic Planning Process Action Team Leaders September 25, 2013.
Advertisements

NASA Earth Science Data Preservation Content Specification H. K. (Rama) Ramapriyan John Moses 10 th ESDSWG Meeting – November 2, 2011 Newport News, VA.
Managing Evaluations for Consistently High Quality American Evaluation Association Annual Conference Molly Hageboeck.
Manager Performance Evaluation
IceBridge Science Objectives The following are the major science objectives of Operation IceBridge in priority.
System Office Performance Management
WGITA Project Governance Wayne Jones Executive Director Australian National Audit Office.
OIB Long Range Planning Luthcke and Jezek. OIB Long Term Observation Goals OIB is meant to provide data to improve our understanding of the mass evolution.
Michael Studinger & IceBridge Science Team & Instrument Teams.
IceBridge Program Overview Tom Wagner IceBridge Program Scientist.
SDO/AIA science plan: prioritization and implementation: Five Objectives in 10 steps [session no.] HMI/AIA science teams meeting; Monterey; Feb
ICESat dH/dt Thinning Thickening ICESat key findings.
IceBridge Science Team Meeting September 27, 2010 Goddard Space Flight Center.
Adjusting EPLC to your Project Colleen Robinson & Teresa Kinley Friday, February 6, 2009.
19/20 May 2015, Riga “From Gaps to Caps – Risk Management Capability Based on Gaps Identification in the BSR” TASK D COMPARISON OF EVALUATIONS OF EMERGENCIES.
System Office Performance Management
© 2014 Public Health Institute PROPOSAL WRITING.
Implementation of Project Governance at the Center Level
INFO 637Lecture #31 Software Engineering Process II Launching & Strategy INFO 637 Glenn Booker.
Chapter 2: Overview of Essentials ISE 443 / ETM 543 Fall 2013.
Implementing Commissioning and the CxP for DOE Super ESPC Projects Draft Guideline Review Chuck Dorgan, P.E., Ph.D., CxAP Roger Johnson.
Managing IceBridge Airborne Mission Data at the National Snow and Ice Data Center M. Kaminski, M. Brodzik, J. Deems, T. Scambos National Snow and Ice Data.
IEBC Sunkosi Webinar © 2015 All rights reserved. Successfully Implementing Your Student Success Plans Ensuring The Success Of Well Managed Interventions.
Portfolio based assessment - options for the new CGEA.
Market Meeting Support Susan Munson ERCOT Retail Market Liaison Commercial Operations Subcommittee (COPS) June 10, 2008.
1PoDAG XXX: IceBridge October 12, 2011 PoDAG XXX: IceBridge Marilyn Kaminski IceBridge Project Manager October 12, 2011.
1 Community-Based Care Readiness Assessment and Peer Review Team Procedures Overview Guide Department of Children and Families And Florida Mental Health.
Center for Satellite Applications and Research (STAR) Review 09 – 11 March 2010 Image: MODIS Land Group, NASA GSFC March 2000 Center for Satellite Applications.
Norwin School District Summative Assessment Professional Development Initiative
1 Super Regional Strategy Team: CONVERSATIONS Patience Vs. Results Fantasy of Flight | Polk County | September 15, 2008 SUPER REGIONAL STRATEGY TEAM -
BOE/Work Break Down The following slides provide a high level view of the BOE/WBS structure of the proposed NSIDC DAAC Contract.
1 SPSRB Decision Brief on Declaring a Product Operational Instructions / Guidance This template will be used by NESDIS personnel to recommend to the SPSRB.
NMP EO-1 TECHNOLOGY WORKSHOP Section 2 Meeting Objectives.
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
January 24, 2002 Key West, FL Lidar Winds Working Group Meeting GTWS SDT-Yoe & Atlas Science Definition Team Activities and the GTWS Draft Data Requirements.
© Mahindra Satyam 2009 Configuration Management QMS Training.
LBNE Working Group Meeting December 20, :00– 5:00 PM Snake Pit.
NSIDC DAAC OVERVIEW Part II: Management and Organizational Structure Ron Weaver NSIDC Scientific Manager DAAC Manager.
Thoughts on OIB Science Team KCJ. Acquisition Strategies OIB developed 3, basic acquisition strategies February 2011 I. Establish once the bedrock topography.
OIB telecon 5/24/2012 Telecon Agenda: -- Introduction, goals of meeting. (5 min) -- Review of science reqs as of the end of the 2011 field season (Smith/Studinger)
Using instrumented aircraft to bridge the observational gap between ICESat and ICESat-2.
Goddard IceBridge Science Definition Team meeting September 26, 2010 Seelye Martin Lora Koenig Seelye Martin, Kangerlussuaq, May 2007.
1 Hertfordshire County Council Knowing your school.
Science Team Objectives K. Jezek and J. Richter-Menge Science Team Co-leads.
Have you downloaded WSSDA 2014? Search for the app in iTunes or Google Play Store and join the conversation. WELCOME. 1.Tap Agenda 2.Locate this session.
Center for Satellite Applications and Research (STAR) Review 09 – 11 March Arctic Aircraft Altimeter (AAA) Experiment Envisat and ICESat underflights.
A PRACTICAL APPROACH TO STRATEGIC PLANNING Mitch Everton Saturday, November 23 4:15-5:30.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
The Government Performance and Results Act (GPRA)-required Performance and Accountability Report (PAR) APS is tasked with 1) Assessing annual APD progress.
RIDE Educator Evaluation System Design ACEES Meeting December 6, 2010.
Overview Remarks for US ITER-TBM Conference Call June 23, 2005 Mohamed Abdou.
1 Climate Absolute Radiance and Refractivity Observatory (CLARREO) Welcome David Young Project Scientist CLARREO Mission Formulation Team NASA Langley.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
GLAST Science Support CenterAugust 10, 2004 Users’ Committee Meeting The Project Data Management Plan David Band – GSSC.
Introducing the INS Master Schedule Wayne Baggett.
Welcome!  Please complete the three “Do Now” posters.  There are nametags on the tables:  Please ensure that more than one district is represented at.
GOING DEEPER INTO STEP 1: UNWRAPPING STANDARDS Welcome!
Contest Orientation. This Year’s Challenge Fill a Container and Close It Contest Day Contest Day –Carnegie Science Center –Friday, December 7,
© 2015 ASPCA ®. All Rights Reserved. Succession Planning & People Development Practical Tools for Managers Cheryl Bucci - Vice President, Human Resources.
PLCs Professional Learning Communities Staff PD. Professional Learning Committees The purpose of our PLCs includes but is not limited to: teacher collaborationNOT-
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
Monitoring and Evaluation Systems for NARS organizations in Papua New Guinea Day 4. Session 11. Reporting.
Preparation of the Self-Study and Documentation
Module 4: Structuring the District Implementation Team for Success
SA Capstone Requirements and Design Week 10 SYST Winter 2016
Well Trained International
QUALITY IMPROVEMENT FINAL QUARTERLY COLLABORATIVE WORKSHOP
Sweet Adelines International
IEEE Task Group G Adopted Agenda for January 2001 Session
Dr. Rob Hasker SE 3800 Note 9 Reviews.
Presentation transcript:

IceBridge Science Team Meeting Agenda Thursday January 20, :00 Science Team Progress (2 min, one vu-graph summary from each team member) 1:30 Cryosat and IceBridge (Wingham, Davidson, Casal) How can IceBridge instruments and flight lines benefit the scientific analysis of Cryosat Data? How can IceBridge data help tie together ICESat 1/2 and Cryosat science How can we incorporate Cryosat project needs into a decision matrix for IceBridge Flight Planning and Instrument Suite Selection Cryosat and Cryovex data sets 2:00 Data Set Status from Arctic and Antarctic 2010 (Kaminski, Scambos) 2:30 Instrument and Platform Configurations for Arctic 2011 (Studinger) Science team requests for any configuration changes Sea Ice IR Sensor Analysis (Richter-Menge) 3:00 Presentation on the Status of IceBridge Flight Plans for the Arctic (Sonntag) Break into Executive Session 4:00 PM review mandate and action items from the previous months of work (KCJ/JRM) 4:10 Discussion/review of current progress on Science basis document and Level 1 Reqs (JRM/KCJ) 4:20 Discussion on data set sub teams (KCJ/JRM) 4:30 Discussion/review of mission continuity/sensor comparison plans (POC) 4:45 In the context of what we have learned and the current documentation are there any glaring blunders in the to-date acquisition plans (Group Discussion) 5:20 review planned agenda for Friday (Science Team Leads) 5:30 adjourn

IceBridge Science Team Agenda Friday 0845 Review days agenda and any other matters (Science team leads) 0900 Review logistical schedule for Arctic Deployments and any other logistical issues that have cropped up(Project) 0915 Begin a sweep of the flight lines by objectives, lead instruments, priorities, duration, consistency with science requirements, location, coverage, etc. 10:30 Break 10:45 more sweeping! 1200 Lunch 1300 Review tabulated list of flight lines and priorities in context of requirements 1345 Summary of Action items and Telecon/Meeting Schedule (Go west young man/woman!) 1400 Adjourn

IceBridge Science Team Mandate 1.Final development of the IceBridge Science Definition Document and Level-1 Scientific Requirements Document; 2.Evaluation of the IceBridge mission designs in achieving the goals defined by the Science Definition Document and Level-1 Scientific Requirements Document as requested by the NASA Program Scientist; and 3.Support to the IceBridge Program Scientist and Project Scientist in the development of the required analyses, documentation, and reporting during the IceBridge mission.

Action Items Vu-via web site Key Actions 1)Finish Science requirements justification document 2)Identify next Science team activities 3)Telecon and meeting plan

Next tasks (Iteration with Tom) Complete the Level 1 requirements (appendix). The document is great. It’s better than what we produced for the satellite missions. Some minor issues remain. 5 cm vertical accuracy? Is that possible? Is it over an averaged area? I think the doc might be mixing shot-to-shot with binned results, and might be overambitious. Can the snow radar do 5 cm? We need to get the area into the measurement requirements and verify the vertical accuracy. Ultimately we will have to distill Table W into the formal level 1 requirements. Short, simple verifiable. Measurements, distances. But let’s not get bogged down in that now. Work with data. I think this is exactly the right thing to do. Let’s make sure that the sci team gets data ONLY THROUGH NSIDC, not the PIs, to make sure we’re doing things right at the data center. The outcome of this process will be: – Ensure we can meet the level 1s (we might need a draft report at the end of 2011) – Feedback to instrument teams (And perhaps with a formal review in June?) – Provide feedback to NSIDC (Documented as you see fit) Plan for future IceBridge. Bruce and I will use something like this routinely.

Data Review Assess the quality, utility, format and documentation of IceBridge data and consistency with science requirements Provide feedback to Instrument Team and Data team Approach form sub teams composed of ice sheet and sea ice types to prepare a fall report. Appoint sub team leader. Subteams – Radar Depth Sounder (pre-scienc e team report posted) – Potential Methods (very thorough initial gravity report posted – could be a good model) – Laser Altimeters (ATM/LVIS/Photon Counters) – Snow/Accumulation Radar – Model usability (formats, metadata, etc – Larour Draft) 16 Science team members so about 3-4 members per sub team