Hg System Status V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting October 20, 2006.

Slides:



Advertisements
Similar presentations
Source Driver Status CMS Week November 2007 P. Debbins University of Iowa.
Advertisements

Mercury Intense Target (MERIT) Update Status of the Target System Design P.T. Spampinato V.B. Graves T.A. Gabriel Muon Collaboration Friday Meeting October.
A Free Jet Hg Target Operating in a High Magnetic Field Intersecting a High Power Proton Beam Van Graves, ORNL P. Spampinato,T. Gabriel, ORNL H. Kirk,
MERIT Hg System Design V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Review Meeting Brookhaven National Laboratory Dec 12, 2005.
NTOF11 Hg System Design Status Van Graves Tony Gabriel, Phil Spampinato Collaboration Meeting – Princeton University Apr 2005.
O AK R IDGE N ATIONAL L ABORATORY U.S. D EPARTMENT OF E NERGY Heat Flux Measurement Adrian Sabau Metals and Ceramics Division Oak Ridge National Laboratory,
Titan-izing the Target Module V.B. Graves 16 Dec 2005.
Weigh-in-Motion User Manual for WIM Integrated System Cindy Lopez City University of New York-York College Research Alliance in Math and Science (RAMS)
AB/ATB-EA ML, le 30/03/071 MERIT INSTALLATION. AB/ATB-EA ML, le 30/03/072 MERIT INSTALLATION Total supported weight Solenoid: 5500 kg (12000 lbs) Hg System.
Harold G. Kirk Brookhaven National Laboratory The CERN Target Experiment Schedule and Budget MERIT Review BNL December 12, 2005.
MERIT Hg System Final Design Review Hg Target System Design Interfaces V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma.
Target System Transportation and Decommissioning P.T. Spampinato V.B. Graves Hg System Safety Review CERN June 19-20, 2006.
Hg System Design V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
Managed by UT-Battelle for the Department of Energy Neutrino Factory Mercury Containment Concepts V.B. Graves 2 nd Oxford-Princeton High- Powered Target.
High Power Hg Target Conceptual Design Review Hg Jet Nozzle Analysis M. W. Wendel Oak Ridge National Laboratory February 7-8, 2005.
MERIT Collaboration Meeting ISSUES RELATING TO THE Hg-JET TARGET SYSTEM P.T. Spampinato V.B. Graves T.A. Gabriel Princeton University November 17, 2005.
MERIT Hg System Design Update V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting Princeton University Nov 17-18, 2005.
Harold G. Kirk Brookhaven National Laboratory MERIT Experiment Status NFMCC Collaboration Meeting FNAL March 17-20, 2008.
N UCLEAR S CIENCE AND T ECHNOLOGY D IVISION O AK R IDGE N ATIONAL L ABORATORY U.S. D EPARTMENT OF E NERGY Muon Collider-Neutrino Factory Collaboration.
High Power Hg Target Conceptual Design Review Hg Target System Cost Estimate V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February.
CERN Hg Jet System V.B. Graves P.T. Spampinato T.A. Gabriel MUON Collaboration Meeting Lawrence Berkeley National Laboratory February 16, 2005.
Harold G. Kirk Brookhaven National Laboratory The MERIT High-Power Target Experiment Muon Collider Design Workshop BNL December 3-7, 2007.
Mercury Nozzle Status V.B. Graves Hg Jet Design Meeting Princeton University Nov 15, 2004.
Marion M. White Undulator System 07 April 2005 LCLSLCLSLCLSLCLS Undulator System Tests Marion M. White ANL-ASD-LCLS.
High Power Hg Target Conceptual Design Review Hg Target System Controls V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February.
High Power Hg Target Conceptual Design Review Hg Target Design P.T. Spampinato V.B. Graves T.A. Gabriel Oak Ridge National Laboratory February 7-8, 2005.
MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August Targetry R&D in the 5-Year Plan Harold G. Kirk Brookhaven National Lab.
N UCLEAR S CIENCE AND T ECHNOLOGY D IVISION O AK R IDGE N ATIONAL L ABORATORY U.S. D EPARTMENT OF E NERGY Muon Collider-Neutrino Factory Collaboration.
MERIT Hg System Final Design Review Hg Target System Design V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science & Fusion.
Managed by UT-Battelle for the Department of Energy Using Lead-Bismuth Eutectic in MERIT Syringe Pump Van Graves October, 2007.
MERcury Intense Target (MERIT) Overview Van Graves, ORNL Syringe Procurement Kickoff Meeting Airline Hydraulics Bensalem, PA Oct 28, 2005.
Mercury Catcher Status V.B. Graves Hg Jet Design Meeting Princeton University Nov 15, 2004.
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
High Power Hg Target Conceptual Design Review Hg Target Interface with Solenoid V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory.
K. McDonald Muon Collaboration Meeting 19 Mar 2008 Future Target System R&D Analysis (and simulation) of MERIT data is ongoing, but the success of the.
Hg System Decommissioning V.B. Graves P.T. Spampinato CERN Feb 7-8, 2008.
High Power Hg Target Conceptual Design Review Design Requirements, Interfaces, and Schedule P.T. Spampinato V.B. Graves T.A. Gabriel Oak Ridge National.
Target System Operations and Hg Handling P.T. Spampinato V.B. Graves MERIT Hg System Safety Review CERN June 19-20, 2006.
High Power Hg Target Conceptual Design Review Equipment Installation at CERN V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February.
Water Tests of Hg System V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting Dec 8, 2006.
Target Design Meeting Nozzle & Hg Collection Tests, Design Requirements, Instrumentation, Containment, Windows, Diagnostics, Controls, Base Support Structure,
Hg Delivery System Fabrication Status V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting May 5, 2006.
NTOF11 Collaboration Meeting Non-Design Issues for the Mercury Jet Target P.T. Spampinato V.B. Graves T.A. Gabriel Princeton University April 29-30, 2005.
MERIT Hg System Final Design Review Hg Target System Operations V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science.
Managed by UT-Battelle for the Department of Energy Hg System Decommissioning Activities V.B. Graves NFMCC Friday Meeting Feb 29, 2008.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1.
Summary of Hg System Review at CERN Van Graves 13 Sep 2005.
Status Report #2 Automatic Child Safety Gate: Corry Winslow Roger Battles Philip So Description: A telescoping gate with sensor technology through the.
16th March 2005, ENG target A.Fabich, CERN AB/ATB 1 Status of the TT2A target experiment Status of the TT2A target experiment A.Fabich CERN AB/ATB ENG/BENE.
INTRODUCTION “Big Red” Torin Aluminum Jack “Big Red” Torin Aluminum Jack 3000 lb capacity 3000 lb capacity Gross weight 48 lbs Gross weight 48 lbs High.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
SNS Alarm System Status Curtis Dunn Control System Suite/Eclipse Frameworks Workshop EPICS Collaboration Meeting June 12-16, 2006.
MERIT Hg System Final Design Review Hg Target System Controls V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science &
Icecube DOM Main Board Status and Development Plans R. Minor October 2003.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
OPTICAL TOOLING Survey & Alignment. O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 2 Title_date OPTICAL INSTRUMENTATION AND TERMINOLOGY.
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
XAL based PV Browser Jeff Patton, Chris Fowlkes EPICS Collaboration Meeting – RDB SIG June 12, 2006.
1 BNL LHC Hi-Lumi QXF Vertical Test Facility Status Update M. Anerella, H. Hocker, P. Joshi, P. Kovach, A. Marone March 28, 2016.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
Mitglied der Helmholtz-Gemeinschaft Status of day-one experiment commissioning at COSY Huagen Xu Goa, Mar
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
Booster Corrector Review, Oct. 10 th, 2006 E. Prebys Introduction/Specifications Eric Prebys Proton Plan Manager.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Survey Results – “Raising Visibility and Awareness of Environmental Programs at DOE Facilities”
Hg System Decommissioning Activities
Presentation transcript:

Hg System Status V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting October 20, 2006

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 2 MC Friday Meeting 20 Oct 2006 Initial Water Testing Setup  A primary containment has been mocked up to allow initial water tests to be performed  Will be used to debug Labview control software and test some of the sensors  Remainder of syringe hardware scheduled for delivery week of Oct 23

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 3 MC Friday Meeting 20 Oct 2006 Control System Connections  Most internal Labview wiring completed  Temporary wiring for sensors required for testing  Remainder to be completed upon delivery of wiring pkg from Princeton At last review Current wiring

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 4 MC Friday Meeting 20 Oct 2006 Syringe Pump Performance Testing  Control system development complete based on water tests  Minor modifications may be required after switch to Hg, but none are expected  Data logging incorporated  System can produce a 20m/s, 1cm-dia water jet  Water test nozzle configuration approximately matches one of the two Hg nozzles  My opinion: jet quality looks good for a no-field condition. Holds together for better than ~1/2m

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 5 MC Friday Meeting 20 Oct 2006 Water Test 20m/s Screenshot

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 6 MC Friday Meeting 20 Oct 2006 Load Testing of Common Baseplate & Target Cart  CERN Safety Commission voiced concerns regarding analysis performed on common baseplate design  Load test performed on structures to verify strength and test adjusting mechanisms  Estimated component weights  Magnet: lbs (5440 kg)  Hg system (with 23liters Hg): 4000 lbs (1810 kg)  Test weights  Magnet: lbs (6170 kg) = 113% estimated weight  Hg system: 4500 lbs (2040 kg) = 113% estimated weight

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 7 MC Friday Meeting 20 Oct 2006 In Nominal Test Position  Baseplate tilt ~ 66mrad  Elevation matches CAD models

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 8 MC Friday Meeting 20 Oct 2006 Operational Testing  Lifting jacks and lateral position adjustment mechanisms tested

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 9 MC Friday Meeting 20 Oct 2006 Roller Testing  Loaded baseplate pushed with pallet jack while on three Hilman rollers

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 10 MC Friday Meeting 20 Oct 2006 Leveling Jack Testing  Baseplate adequately supported by four leveling jacks

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 11 MC Friday Meeting 20 Oct 2006 Conclusions  Syringe pump control system development completed  System can produce 20m/s water jet within pump's performance limits  No reason to think Hg will be different  MERIT common baseplate has been successfully tested with 113% expected loading  Final assembly and optics integration to commence shortly  Switch to Hg will be made once all operational aspects of system have been tested with water

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 12 MC Friday Meeting 20 Oct 2006 Conclusions  Manual control of syringe demonstrated  Hydraulic system fill and drain procedures developed  Hg control system wiring is underway, water tests to start afterwards  Ready for Hg testing after conclusion of water tests and when remainder of fabricated components available