The Team Alex Estey - MEAlex Estey - ME Kenn Austin - CSKenn Austin - CS Matt Clark - MEMatt Clark - ME Tristan Schneiter - CSTristan Schneiter - CS Yago.

Slides:



Advertisements
Similar presentations
Snow & Ice Chemical Scatter Test Research By Mandy Uhrich District 3A Performance Measures / Operations Specialist.
Advertisements

Butler County Regional Snow Summit October 18, :00AM-12:00PM Butler County Engineers Office 1921 Fairgrove Avenue Hamilton, Ohio Welcome………………..Gregory.
OfficeTrack Mobile Employees Location Management Solution.
GPS Tracking of Clark County Public Works Vehicles Matt Deitemeyer GIS Analyst.
Integrated Vehicle Tracking, Voice Radio, and Mobile Messaging in One Economical Unit.
Dispatch GPS Fleet Tracking for the Future. 2 Dispatch GPS Overview Web-Based Mobile Signaling System GPS Vehicle Monitoring Scheduling and Payroll System.
City of Traverse City Snow Removal Operations. Responsibilities Streets Division –State Highways (Trunkline, 8 miles) –City Streets (83 miles) Emergency.
Cascade Systems Presents …. Crane Safe Load Indicator.
A comparison of two cars I would like to own: a Chevrolet Camaro and a Jeep Wrangler Presented by: Alex Madore Project # 15: Buying Your First Car 1/10/11.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
GPS TimeTrack ™ for Vehicles. Proprietary and confidential. All rights reserved. Xora, Inc. 2 Overview GPS TimeTrack for Vehicles In-Vehicle Option –Real-Time.
1 Civil GPS Service Interface Committee (CGSIC) Rudy Persaud U.S. DOT-FHWA APEC GNSS Implementation Team Seattle, WA June 23, 2010 State and Local Government.
Truck Fleet Data Display for Burlington Department of Public Works
MDSS Stakeholder Meeting June, COMPUTING A BETTER WAY TO PLOW IN NORTHEASTERN MINNESOTA Kwasi D. Amoah, Graduate Student, MSEM University of.
An Unbelievable Future Clint Steiner Sr. Automotive OEM Sales Manager.
I see you… INTELLIGENT TRANSPORTATION SYSTEMS AS A MEANS OF AUTOMATIC ROAD ENFORCEMENT BY: KEVIN NICOLI.
University of Vermont Senior Experience in Engineering Design.
Darien EMS Scheduling Calendar Stephen Bloom & Stephen Kates.
Virtual Cell Client Virtual Cell Daniel Small Undergraduate Research Assistant.
Buy Cirus Control Equiptment Time: 1 week Task Leader: Norm Test Control equipment in lab Time: 2 weeks Task Leader: Alex Determine optimal location in.
Burlington Department of Public Works University of Vermont Senior Experience in Engineering Design Alex Estey Matt Clark Kenn Austin Yago Alanso Garcia.
TEAM 3 - CS616 Order Processing - Project Presentation.
Winter Operations GPS Truck Tracking and Material Usage Tom Clay Washington State Department of Transportation Western States Equipment Conference
SEED: Burlington Department of Public Works Spring Interim Presentation.
CS410 - BLUE GROUP Final Presentation communicate2Me.
Computer Science Lego Robotics Lab 07 Page 51. CS Lego Robotics Lab 07 (Updated ) Objectives: 1.Extend the Lego robot with three sensors. 2.Program.
THE MILESTONES OF MASS TRANSIT CS 410 Blue Group communicate 2Me.
Team Leader John Sedig Communications / Documentation Kevin Nennig Webmaster / Software Design Matt Graves Hardware / Electrical Design Josh Mandich Software.
Leveraging The Internet To Run Your Small Business Like A Big Business Ronald McQueen.
By Shubham GOEL ECE-III year xyz. Introduction Automatic Vehicle Locator (AVL) is a computer – based vehicle tracking system The actual real –time position.
Melissa Armstrong – Sponsor Dr. Eck Doerry – Mentor Greg Andolshek Alex Koch Michael McCormick Department of Computer Science SolutionProblemDesign User.
Dispatching Operations Department of Transportation Project DISPATCHERS.
Upgrade to a Web-Based System for OSU Transportation Services.
E-commerce customization 12/19/2011Petr Vozak, Technical Leader.
Snow Removal Information Robert “Brutus” Cantoreggi, Director Carlos Rebelo, Highway and Ground Superintendent.
NCAR MDSS Functional Prototype Display System Preview – April 2002 Bill Mahoney National Center for Atmospheric Research Images shown are valid as of 15.
Snow Plow Tracking and GIS
Everyday Mapping of Traffic Conditions - An Urban Planning Tool Laboratory of Geodesy Aristotle University of Thessaloniki, Department of Civil Engineering.
TEAM 13—GEOMELT. The Team Jacob Speelman (ME) Caleb Rottman (EE) Eric Ledy (ME) Eric Geerlings (CE)
Olathe’s Snow Removal Program. Overview Snow Removal Policy Types of Routes Snow Route Information Site AVL units Complaint database.
Automatic Vehicle Location (AVL) By Doug Lambert.
Steps to setup parent account to Go Green. Go Green  The Go Green initiative is a set of features that allows schools to send electronic notifications.
February 4, Location Based M-Services Soon there will be more on-line personal mobile devices than on-line stationary PCs. Location based mobile-services.
NCTCOG Status Report: Multi-Year Network Coding And Integrated Databases Ken Cervenka, P.E., AICP North Central Texas Council Of Governments For AMPO Travel.
Presented by : Sam Falsafi Director of Business Development & RFID Strategy Ship2save Unit In Transit System Leveraging RFID to drive significant business.
Let the flakes fly!. Kenton County Public Works Expressed interest Discussions ensued $$$ is an object Determined course of action.
Team 2 Electricivic Ben Dannan Mark Snyder Matt Klutzke Mike Mitchell 1.
Truck Fleet Data Display for Burlington Department of Public Works University of Vermont Senior Experience in Engineering Design.
Public Works Overview of Winter Salt Usage. Our Equipment The City of Mankato's Public Works Department plows 432 lane miles and uses an average of 2,400.
ORDINANCE # Authorizing $372,760 for traffic signal interconnect at 47 th Street and Emanuel Cleaver II Boulevard Start of project End of project.
CTX Website Instructions How to Request a Login 1. Click Register at the top of the page. 2. Enter Required information such as User Name.
Department of Transportation Road Services Division Snow and Ice Response
Snow & Ice Control in Maine
Snow & Ice Event/Bare Lane Training
Using GIS to Monitor Snow Removal and Track Costs
Office of the City Attorney Council Work Session – September 12, 2017
Resolve QuickBooks Errors by QuickBooks Enterprise Support
Garmin Software Update Support Call for
Garmin Support Service UK Call
Johnson City MPO Travel Demand Model
World Sales Meeting Application
Modular Motion Tracking Sensors
NAVIGATING THE WINTER WITH THE ILLINOIS TOLLWAY
Snow and Ice Removal Route Optimization
WisTMP 2.0 Update Andy Heidtke, PE Statewide Work Zone Design Engineer
AuraPortal PROJECT TASK 6
Complete Vehicle Systems.
Doctors List
Presentation transcript:

The Team Alex Estey - MEAlex Estey - ME Kenn Austin - CSKenn Austin - CS Matt Clark - MEMatt Clark - ME Tristan Schneiter - CSTristan Schneiter - CS Yago Alanso Garcia – EEYago Alanso Garcia – EE Jeff Frolik - AdvisorJeff Frolik - Advisor Norm Baldwin – Assistant Director of BDPWNorm Baldwin – Assistant Director of BDPW

The Customer City of Burlington Department of Public WorksCity of Burlington Department of Public Works Responsible for 240 road lane milesResponsible for 240 road lane miles Responsible for 120 miles of sidewalkResponsible for 120 miles of sidewalk 3 baseline snow fighting plans3 baseline snow fighting plans –2 inches or less –2-6 inches –6+ inches 7 trucks plowing six areas at any time7 trucks plowing six areas at any time

Goals of Project TrackTrack –Plow up, plow down –Road temp –lbs salt / mile –Truck speed –Where trucks have been User InterfaceUser Interface –Displays tracked data –Two versions One for internal useOne for internal use One for public useOne for public use

GPSUser InterfaceSensorsEnclosures Radio DatabaseUser Interface Vehicle Base Yago- GPS and Radio Matt- Sensors Tristan-User Interface (vehicle and base) Alex- Enclosures Database Kenn- User interface (vehicle and Base) Assignments The System

Contacts and Updates