RF de-bunching problem  The Beam Phase module measures the phase of each individual bunch and makes an average that is passed to the Low Level for updating.

Slides:



Advertisements
Similar presentations
DS Quench TEST 2  MOTIVATION and METHOD: 1. Achieve 500kW on beam 1 – TCP7 collimators.(so far 500kW with beam 2 and 235kW over 1s with beam 1 were reached.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Sat/Sun 26/27 th March Sat 18h20: Stable beams. Fill #1653. Sun 10h02: Stable beams continued. vdM scans. Length calibrations. 16h59: Beam dump. Delivered.
The ATS MD part III (Achromatic Telescopic Squeezing scheme) Participants: Any (active) volunteers Goal: 1)MD1 (S. Fartoukh & R. Assmann  10h): “Pre-squeeze’’
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
Saturday 6:13 – 15:00 STABLE BEAMS  scans etc. 15:00 moved to ADJUST Squeeze to 2 m in two steps 11 – 5 – 2  remarkably smooth  tertiary collimators.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
CONTENT: Beam characteristics and parameters Filling schemes Operational settings OP procedure and COLL setting Planning Shift breakdown To define the.
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
LHC orbit system, performance and stability LHC Beam commissioning workshop, Evian, 19./20. Jan 2010 Kajetan Fuchsberger Thanks for Help and discussion:
1) orbit reponse measurements indicated no obvious BPM polarity errors (Kajetan) 2) confirmed consistency between synchronous and IIR- based orbit estimates.
Saturday ● 06:00: Physics fill from the night shift ● 15:00: End stable beam mode: – problems with incorporation of settings for the squeeze ● 16:40:
MD Wed – Sat DayTimeMD Wed06:00UPS repair, ATS optics checks w/o beam 12:00Cycle, test ATS optics w/o beam 16: TeV: BPM offset determination for.
Shortened program (2 days), as decided in LMC. MD program worked very well  all MD’s on plan with ~foreseen beam time. LHC in very good shape with excellent.
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
Β*-dependence on collimation R. Bruce, R.W. Assmann C. Alabau Pons, F. Burkart, M. Cauchi, D. Deboy, M. Giovannozzi, W. Herr, L. Lari, G. Muller, S. Redaelli,
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
Collimation Aspects for Crab Cavities? R. Assmann, CERN Thanks to Daniel Wollmann for presenting this talk on my behalf (criticism and complaints please.
Aperture measurements during LHC commissioning 2017
Friday Access in shadow of SPS interventions (RF, extraction septa power supply) Lead into problem on the cooling of the extraction septa in SPS Both beams.
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
Wednesday 8.9 External crossing angles:
1st LHC MD Period Started
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Tuesday TOTEM and transverse loss map (1) OK
Alice solenoid – orbit distortion
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
LHC commissioning Week 38
Thursday morning 09:30 Dump of pPb fill.
Lost at 12:05 to power converter (RTQX2.R1) problem
Saturday 2/4/ :00-09:00 Problems with SPS:
Week 35 – Technical Stop and Restart
Monday Morning – recovery from cryo.
Monday February 28th 8h00: Injection
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Planning at 5 o’clock meeting Friday
Friday morning 10:30 Optics measurements and corrections.
Thursday :00: Physics fill from the night shift
Yesterday morning Held 1647 for a while – SPS kicker problem
Saturday 7th May Sat – Sun night
Summary Thursday h21: Stable beams fill #1303.
Monday 24 October hours of 25ns MD
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Thursday 26th July 13:21 Fill 2880 beam dumped
Monday :15 fill 3523 dumped by BPMs IP6
Plan for 1 m b* J. Uythoven & J. Wenninger
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
Tuesday 20 September 2011.
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Another Immortal Fill….
Saturday 26th March 9:15 Problem with RB78 temporarily solved. It's running on one Thyristor bridge only and without the active filter LHCb polarity change.
Tuesday
LHC An LHC OP guide… under construction J. Wenninger
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

RF de-bunching problem  The Beam Phase module measures the phase of each individual bunch and makes an average that is passed to the Low Level for updating the VCXO frequency. The module must discriminate between buckets with a bunch present (whose phase must be included in the average) and buckets with no bunch (whose "phase" must not be included). The beam signal comes from a PU and the RF mismatch at the module input will create a small reflection trailing the passage of the strong 1E10 bunch. To reject the reflection from being included we have a "threshold" that must be high enough so that the 1E10 fat pilot is rigthly considered as a bunch and low enough so that the reflection from a nominal is not considered as a bunch. That threshold was manipulated last week and NOT returned to the correct value (~ 3 times too low). That is the cause of last night’s miseries... Saturday morning LHC startup progress

With pilot + indiv the LLRF was first seing 3 bunches (pilot + indiv + reflection). As the phase of the reflection is way different, that created a large Synchro Loop injection transient, correctly observed by Reyes last night. With time and loss, the indiv intensity decreased slowly and so did the reflection, finally reaching the threshold level. Situation then became chaotic as the phase average would jitter between two bunches and 3 bunches...with large noise. That caused the strong debunching. It did not last for long: As soon as loss had reduced the reflection intensity below threshold we reached a stable "two bunches" situation with good lifetime LHC startup progress

Up ramp into squeeze Step through looking closely at the orbit (Jorg & Kajetan) Saturday afternoon LHC startup progress At 1.5 m with correct 1.5 m bump reference. The same real orbit as in the previous entry, but this time compared to the 10/11 m reference.

Crossing angle bump shape change LHC startup progress Kajetan

The orbit issue that we had in IR8 (IR1/5 to a reduced extend) is understood to be a large change in the shape of the Xing angle bump in IR8 (>> than in IR1/5) that we had unfortunately not checked. The difference in BPM readings reaches ~5 mm (!!!) around Q4/5, and the change is most pronounced between 10 and 6 m. The present reference strategy of the OFB was to give a constant reference in the squeeze, which clearly does not work. Orbit in squeeze LHC startup progress

Possible ways out:  - Try to rematch a different Xing angle bump that minimizes the shape change. That would make life easiest from the control point of view.  - Run the OFB with all BPMs in the crossing angle region disabled - not sure that this works too well - see last years experience ! But this would be a short term solution for the few next squeezes.  - Implement a more sophisticated reference orbit system where we can change the bump shape in the squeeze as a function of b*.  - Prepare a set of reference orbits for different b* values and then send the new references on the fly along the squeeze (Argh !), Orbit in squeeze LHC startup progress

OFB stability LHC startup progress Tested the stability of the OFB by sending kicks of 10 microrad and checking the convergence. OK in all tested cases, when the CODs are near Q4 where the b changed most, the convergence is a bit slower. Note the overshoot on the BPM plot, corresponding to an IR BPM where the optics mismatch FB-machine is 'large'. In fact one can notice on the plot with all BPMs a groupd of monitors that 'bounce' once. Jorg

01:00 Collimator alignment finished. Collimator setup - intermediate summary  We started at around 7pm and stopped at 0:30am.  Done within 5h30mins: Beam 1: 17 Collimators (~19min per collimator) Beam 2: 22 Collimators (~15min per collimator)  As already foreseen, we had to repeat all collimators setup yesterday for B1 and all besides 3 collimators in B2. I.e. B1: 17 collimators setup B2: 25 collimators setup (all horizontal and 3 skew collimators)  Ring collimators were put back to the injection settings of last year and the operation should continue with those settings until the new ones are established fully and validation.  Partial settings imported in the collimator beam process 18:00 start collimator set-up LHC startup progress

Performed local scans at the triplets of IP2 and IP8 for both beams, in the crossing planes. Preliminarily, we found the following aperture values (gain with respect to bottleneck in brackets): IP2 - B1 - V : 14.5 sigmas (+1.5 sigmas) IP2 - B2 - V : 15.0 sigmas (+2.0 sigmas) IP8 - B1 - H : 16.0 sigmas (+4.0 sigmas) IP8 - B2 - H : 16.0 sigmas (+3.4 sigmas) For the first three cases, the IR bottleneck is found as predicted at the Q2 of either IP sides. For the case IP8-B2-H, the bottleneck is instead found at the TCTVB.4R8 (collimator in the other plane). This indicates a potential problem to be followed up. Also note that the additional aperture margins are calculated by considering orbit offsets and beam sizes at the BPMS of the Q2 magnets. The proper calculation for the interpolated orbit at the Q2 (peak of the bump) requires an offline analysis. Overnight – aperture measurements LHC startup progress Stefano Redaelli & Roderick Bruce

M2B2 is down… LHC startup progress

Incoming LHC startup progress