Integrated Risk Management EMIS 7303. Admin Stuff Instructor: Jan Lyons, PhD Warning – have to select from.

Slides:



Advertisements
Similar presentations
S Y S T E M S E N G I N E E R I N G.
Advertisements

Ensure Vendor/Engineer of Choice Product Quality
Software Quality Assurance Plan
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Sponsored by the U.S. Department of Defense © 2002 by Carnegie Mellon University July 2002 Pittsburgh, PA Lecture 6: Team Planning.
CSCU 411 Software Engineering Chapter 2 Introduction to Software Engineering Management.
Project Scope Management
Week 3 – Assessing Risk. Risk Analysis Process Technical & systematic process Examine events Focus on causes, not symptoms Determine interrelationships.
Term Project Pick a system (discuss choice with me)  Want simple functionality, security issues, whole system (e. g., client and server side) Submit a.
Project Plan The Development Plan The project plan is one of the first formal documents produced by the project team. It describes  How the project will.
Project Management Session 7
Chapter 5: Project Scope Management
Systems Engineering Management
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
System Engineering Instructor: Dr. Jerry Gao. System Engineering Jerry Gao, Ph.D. Jan System Engineering Hierarchy - System Modeling - Information.
Project Tracking and Scheduling Infsy 570 Dr. R. Ocker.
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
Trade Study Methods.
Project Scope Management
Project Management and Scheduling
The program work breakdown structure (WBS) establishes the essential
Chapter 9. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Chapter 2: Overview of Essentials ISE 443 / ETM 543 Fall 2013.
Web Development Process Description
S/W Project Management
Introduction to Software Quality Assurance (SQA)
Module 1 Session 1.1 Visual 1 Managing the Implementation of Development Projects Course Overview and Introduction.
NIST Special Publication Revision 1
PPMT CE-408T Engr. Faisal ur Rehman CED N-W.F.P UET P.
1-1.
Project Management Methodology Project Closing. Project closing stage Must be performed for all projects, successfully completed or shut off by management.
Task: Copyright © 2003 PM tec, Inc; D. Sankey; D. Padelford. All rights reserved. 1 Fast Start For Projects  Electric Dipole Moment Project Facilitator:
Lecture 7. Review of Lecture 6 Project Scheduling: The process of defining project activities, determining their sequence, estimating their duration Scheduling.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
Project Scope Management Project management Digital Media Department Unit Credit Value : 4 Essential Learning time : 120 hours.
SacProNet An Overview of Project Management Techniques.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Chapter 11. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
10-1 GENERAL GUIDANCE ON CONDUCT OF TECHNICAL REVIEWS Selection should be based on the complexity of the program and the phase of development (modification).
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems The Integrated Master Plan (IMP) and the Integrated Master Schedule.
1 | 2010 Lecture 3: Project processes. Covered in this lecture Project processes Project Planning (PP) Project Assessment & Control (PAC) Risk Management.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Critical Design Review (CDR)
The Goal: To Climb Above The Competition Copyright 2005: I Lead Projects, L.L.C. Course Description Project Process Workplates Project Process Workplates.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Team-Based Development ISYS321 Managing the Information Systems Project.
1 Lecture 2.4a: SEF SE Planning and the SEP (SEF Ch 16) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
Appendix B of RMG 1-5 Project Tasks for Mid Term Exam Provide items listed below in briefing chart format. 1. Project introduction/background/orientation.
Week 2 – Risk Planning & Identification. Risk & Risk Management.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
SOFTWARE PROJECT MANAGEMENT
1 Lecture 2.3: SE Process (SEF Ch 3) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
TMP3413 Software Engineering Lab Lab 01: TSPi Tool Support.
Information Technology Project Management, Seventh Edition.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
 System Requirement Specification and System Planning.
© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.
Chapter 11 Project Management.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Software and System Delivery
Defining the Activities
Project Management Chapter 11.
Some Practical Considerations for Systems Engineers in a Lean-Agile Airborne Weapons System Program June 12, 2018 Ken Garlington.
Presentation transcript:

Integrated Risk Management EMIS 7303

Admin Stuff Instructor: Jan Lyons, PhD Warning – have to select from LM address book is preferred contact option Phone: Office hours: after class and by appointment

Course Materials Texts available from Risk Management Guide for DoD Acquisition, June 2003 Systems Engineering Fundamentals, January 2001 Supplementary materials on SE(5) website Lectures on SE(5) website Reading assignments on SE(5) website

Class Meetings All classes meet from 8a-5p at Ruthe Jackson Center Friday, May 21 Saturday, June 19 Saturday, July 17 – mid-term exam Saturday, July 24 Saturday, July 31 – final exam

Syllabus Week 1 - Introduction to Risk Management Week 2 - Risk Planning & Identification Week 3 – Mid-term, Risk Assessment Week 4 - Risk Handling & Monitoring Week 5 - Special Considerations for Risk Management, Final Exam

Class Requirements Two equally-weighted exams (94%) and group exercises (6%) You may use calculators during exams but not computers Individual project Part I due at mid-term, is 50% of mid-term grade Part II due at final, is 50% of final exam grade Submit paper copies of project with exams

Class Introductions

Project – Part I Provide items listed below in briefing chart format (paper copy). Each item is worth 5 points; submit with the mid-term exam. 1. Project introduction/background/orientation chart. 2. Identification of key requirements. 3. Program performance measures (technical, cost, and schedule) with thresholds and objectives. 4. Project work breakdown structure (WBS). 5. Integrated master plan for the WBS element(s) of interest. 6. Integrated master schedule in network form with personnel needs identified. 7. Project risk assessment. 8. Risk abatement plan for highest risk item/driver. 9.Identify and plan for a potential opportunity. 10. Develop progress metrics.

Reqmt. For Risk Management DoD –R: Systems Engineering process shall Transform reqmts. into an integrated system design solution Ensure integration of interfaces for all system elements Characterize and manage technical risks Apply engineering principles to manage force protection risks

Objective of Risk Management in Systems Engineering Reduce all risks to acceptable levels What risk is/isn’t Inherent in all activities A potential event Not a problem - a problem is a consequence that has occurred Can be an opportunity Cannot be changed by force of thought – hope, ignoring, or mandate

Prime Risk Characteristics Probability of Occurrence Consequence of Occurrence Uncertainty results when probability not known, therefore risk undefined Examples Uncertainty Where probability within known interval

Root Causes of Risk Internal to design Technical issues Manage with design reviews, risk assessments External from environment Multiple sources Manage with requirements & constraints Integrating design into environment Easy to lose sight of details – why?

Which Proposal Used RM?

How the SE Process Supports Risk Management

SE Process  A top-down comprehensive, iterative and recursive problem solving process, applied sequentially through all stages of development, that is used to:  Transforms needs and requirements into a set of system product and process descriptions (adding value and more detail with each level of development).  Generates information for decision makers  Provides input for the next level of developments.

System Analysis & Control Tools & methods for balancing SE Process When does this end?

Control Mechanisms for RM Balancing techniques and tools Track decisions and requirements Maintain technical baselines Manage interfaces Manage risks Track cost and schedule Track technical performance Verify requirements are met Review/audit the progress

Specifications  Documents what the system needs to do

Performance Requirements Detail why the system is needed Three parts Function Performance level Verification means How do good requirements help identify probabilities and consequences?

SE Requirements Desired attributes Understandable Unambiguous Comprehensive Complete Concise Achievable Verifiable Must be measurable – why?

SE Requirements Words that Don’t Provide Measurable Requirements Criteria Fast Should May Extremely  Under Most Conditions  As Appropriate  User Friendly  Should Fail Gracefully

Use Requirements to Id Risk Functional view – what Physical view – how Tailoring – validity of process Constraints

Decomposition & Integration Design is top-down, verification is bottom-up How helps/hurts in risk identification?

Requirements Verification Choice of verification methods is a potential risk – how? If inappropriate may get inaccurate results Expect verification methods to change over design process Need a consistent measure Impact of deviations and waivers on risk

Relating Design to WBS Reqmts allocation - CI numbers match WBS Why assess risks by WBS?

Basic Purposes of WBS Organizational – structure for program management Business – budget and cost tracking structure Technical – structure for Identifying products, processes, dataEnabling configuration management Developing work packages, e.g. materials acq. Organizing technical reviews – performance measures, status reports Addressing risk management

WBS Structure Accommodates organizational, business & technical needs Specifications conform to WBS May contain recurring & nonrecurring effort Functional organization elements (engr, quality) are not WBS elements

Guidance from Mil-Hnbk-881

WBS Exercise Background: You have recently been assigned to the IPD Team for the Peace Whey program. Peace Whey is a recently approved FMS program which will provide 20 F-16Cs to the Kurdish Air Force (KAF). The specifications for the Kurdish F-16s call for them to be equipped with the Airborne Jamming System (AJS), an electronic warfare system. Your position will be as AJS team leader responsible for the oversight of design and testing of the AJS system, for its integration into the Peace Whey aircraft, and for the AJS lab and flight testing verification. In addition, you must act as the interface between the AJS team and the other teams making up the IPD Team for the Peace Whey program, making certain that the program office is supported in its overall coordination and management tasks.

WBS Exercise (con’t) Exercise: Referring to the Statement of Customer Requirements for AJS (Part 1) which you have been provided, develop a Work Breakdown Structure (WBS) for the AJS development and production task as a part of the overall air vehicle development task.

AJS Statement of Customer Requirements Customer: Kurdish Fighter Program (Peace Whey) Operational Need: Fighter aircraft operating in a hostile environment require extensive electronic countermeasures (ECM) to defeat air-launched and ground- launched threats to the survivability of the aircraft. These ECM systems must be capable of generating and broadcasting radio frequency (RF) energy at sufficient power levels and in appropriate patterns to defeat any threat encountered by the aircraft. Description: The AJS shall be capable of installation on a lightweight, high-speed, multi-role fighter and shall be supportable in primitive forward operating bases. The system shall be capable of transmitting radio frequency signal in the microwave frequency range at sufficient power levels and in patterns capable of successfully jamming all identified threats at the required operational range.

AJS Statement of Customer Requirements (Cont.) The AJS system shall consist of the following major components: 1. Core Avionics: Shall consist of the jammer, the radar warning receiver, and the OFP software. Shall be capable of generating the required RF signal in the microwave band at required power levels and of detecting radar emissions from the threat set at the required ranges. 2. RF Switch H/I/J Band: Shall control selection of broadcast frequency bands as required. 3. Fire Control Radar Notch Filter: Shall prevent interference of the Fire Control Radar (FCR) by the AJS system. 4. Forward Transmit Antenna 5. Aft Transmit Antenna and Raydome 6. WRD-650D24 Waveguide 7. Coaxial Cable

Schedule: 1. Flight Test: The Safety of Flight(SOF) unit for flight test shall be available for installation 26 months after program go-ahead. 2. First Production Delivery: The first production assembly shall be delivered 36 months after program go-ahead. 3. Delivery Rate: Delivery of AJS units shall be at the rate of 2 units per month. 4. Total Quantity: The total quantity of AJS units shall be 20. AJS Statement of Customer Requirements (Cont.) Customer Priorities: 1. Power Transmitted. 2. Weight 3. First production delivery. 4.Cost not to exceed $125,000/unit (for 20 units). Be prepared to report your results to the class. You will have __ minutes for this exercise.

IMP/SEMS & IMS/SEDS Relationships Integrated Master Plan (IMP) Integrated Master Schedule (IMS) Program Office Contracts Security System Engineering Master Schedule (SEMS) Program Office Contracts Security System Engineering Detailed Schedule (SEDS)

Program Schedules Establishes key tasks & results Duration driven “X Months after contract award” Event driven “After CDR complete” When might each be desirable? Risks?

Plan & Schedule Terminology  Product - Hardware, Software, Facilities, Data, or Materials  Event - Decision Point at End of Major Project Activity (EX. - CDR)  Accomplishment - Desired Result at Specified Events  Criteria - Measure of Meeting Accomplishment  Task - Specific Activity to Complete a Criteria

SEMS – SE Master Schedule Critical tasks required to complete program milestones Development plans – test, S/W Define interim steps Include verification criteria Define measurable accomplishments 85% complete – good? Test readiness review complete – good?

Program Events - Duration Identify verification criteria

SEDS – SE Detail Schedule Detail schedule relates to event-based schedule Critical task dates Entry/Exit criteria Manpower loading

Schedule Interrelationships

Network Layout Conversion to Milestone Chart K J CG AD B EH FI S C (D) 6 Weeks (A) 4 Weeks(E) 3 Weeks (I) 4 Weeks (H) 2 Weeks (C) 1 Week(G) 4 Weeks (J) 5 Weeks (B) 2 Weeks(F) 8 Weeks (K) 8 Weeks Use of Network Chart

SEMS, SEDS Exercise Exercise: Develop the portion of a Systems Engineering Master Schedule (SEMS) for the AJS design and development tasks. Assume the system level schedule for Peace Whey includes a SRR, SFR, PDR, CDR, and PRR. Your SEMS should identify a list of AJS program reviews with accomplishment criteria. Part 1: Referring to the system level Peace Whey reviews, identify and list the major reviews which need to be supported by inputs from the AJS design and development tasks. Based upon this list, determine a set or reviews for the AJS development effort required to support the Peace Whey program.

SEMS, SEDS Exercise (con’t) Part 2: Identify the accomplishment criteria for one AJS review. Part 3: Develop a System Engineering Detailed Schedule (SEDS) for the AJS design and development task. The AJS Safety of Flight unit must be available in month 26 and first production aircraft in month 36. Hint – Use building block tasks on next page. Be prepared to report your results to the class. You will have 40 minutes for this exercise.

Electronic Warfare

Next Week: Risk Planning & Identification Read: Remainder of SE Fundamentals Risk Management Guide through section 5.3