BPM Upgrade Presented by: Nadine Kurita Contributors: S. Smith, S. Ecklund, J. Sebek, D. Martin, R. Hettel, R. Johnson, N. Reeck, M. Kosovsky, D. Arnett.

Slides:



Advertisements
Similar presentations
MICE Target Shaft Joint Change l MICE Target Ti shaft »Baseline stock material = drawn tube lower joined to solid upper (rather than manufacture from solid)
Advertisements

Thermoforming Process
Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
R&D Plan on Clearing Electrode using the KEKB LER Y. Suetsugu and H. Fukuma, KEKB M. Pivi and L. Wang, SLAC at KEK.
NCSX Vacuum Vessel Overview Paul Goranson WBS 12 Manager Vacuum Vessel Manufacturing Study Kickoff meeting April 29, 2003.
1 PEP Status M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 6 Summary.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
Apr. 16, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
12/13/2004 SN PEP-II MAC REVIEW 1 of 49 RECENT HOM CALCULATIONS HOM Dampers: Last Measurements and New Computer Designs Sasha Novokhatski PEP-II MAC Review.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
1 IR NEG heating M. Sullivan MAC Review Dec , 2004 M. Sullivan Machine Advisory Committee Review December 13-15, 2004 IR NEG Heating and Upgrade.
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
13 Dec MAC Review – Future IR Heating Issues 1 Future IR Heating Issues 13 December 2004 Stan Ecklund.
Radial Ion Pump, BPMs, & HOM Bellows Machine Advisory Committee Meeting December 14, 2004 Nadine Kurita Machine Advisory Committee Meeting December 14,
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
10 October 2003S. DeBarger PEP-II Vacuum Failures PEP-II Machine Advisory Committee.
Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
PEP-II Machine Advisory Committee Meeting SLAC, April 15-17, 2004 HOM Issues in LER Ring and IR. Recent measurements and calculations. Sasha Novokhatski.
1 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Status of HER Arc RF Seals M. Sullivan For the PEP-II team Machine Advisory Committee Review.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
26-October-2006 PEP-II MAC Session HOM measurement and analysis S. Weathersby, A. Novokhatski HOMs in LER region 4: overview, history Collimator wake fields.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 RFBPM Windows Joining Effort Undulator System W. Toter, D. Bromberek, F. Depaola,
Interaction Region Vacuum Chamber Upgrades Presented by: Scott DeBarger Contributors: D. Arnett, B. Bigornia, C. Carr, J. Langton, S. Metcalfe, D. Kharahk,
1 Progress of IR Vacuum Chambers Chen Peng May 11,2007.
Option – 5m Undulators What is the optimum length for an LCLS undulator?  XFEL is using 5m undulator segments.  Is this optimum?  What are the advantages.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
NCSX VACUUM VESSEL HEATING/COOLING PL Goranson Preliminary Results February 17, 2006 MDL Testing of Coolant Tracing NCSX.
RHIC 56 MHz HOM Damper Fundamental Damper Fundamental Power Coupler Pick-ups S. Bellavia January 19 th, 2010.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
Program Risks Risk Analysis Fallback Plans for the PEP-II B-Factory John T. Seeman DOE PEP-II Operations Review April 26, 2006.
IR Heating Issues Stan Ecklund 4 August PEP-II Run 4 Post Mortem IR Heating Issues2 Overview of IR Heating Issues Vertex Bellows –Cooling added.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
October 15, 2007 Smart Card. Smart Travel. TransLink ® Card Procurement Study Update Presentation to the TransLink Operating Group.
Spreaders & Recombiners Beam Transport Michael Bevins May 30, GeV Upgrade - Beam Transport Spreader/Recombiner Dipoles and Layout, & Installation.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
AT-VAC SPC Nicolaas KOS Beam Screens for Inner Triplet Magnets LHC Upgrade Phase 1 Nicolaas KOS  LHC Upgrade phase 1  Inner triplet BS Requirements.
Beam Vacuum Interconnect Design Options Ray Veness.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
LCLS-II Button-type BPM (Review) Nikolay Solyak Review, FNAL, Dec. 12, 2014.
Magnetized Beam LDRD: Design Tasks February 19, 2016.
November 16-18, 2004 Belle High Luminosity Workshop 1 M. Sullivan High Luminosity workshop (HL6) November 16-18, 2004 IR Vacuum Summary and Issues.
2008/12/10 INFN R&D on Low Impedance Beam Chamber and Components Y. Suetsugu, for KEKB Vacuum Group Contents Introduction Beam Chamber Components Connection.
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
Summary of Presentation 1. Tolerances i. Vertical tolerances on BPMs (rf-BPM: ± 0.2μm, user BPMs: ±0.1μm, and X-BPMs: ± 0.1μm) ii. Tolerances on magnets’
Tests on production cryomodules Bob Kephart Sept 30, 2006.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Beam Commissioning Adam Bartnik.
Technical Coordination Parallel Session November 2011, FNAL
Challenges of vacuum chambers with adjustable gap for SC undulators
MLC Schedule Plan Proven in-house expertise and infrastructure for fabrication, assembly, and testing cryomodules Confident in our technical expertise.
John T. Seeman DOE PEP-II Operations Review April 26, 2006
Thermoforming Process
Average Monthly Temperature and Rainfall
PEP-II RF System Status and Upgrades
Nadine Kurita, Michael Kosovsky, and Nick Reeck
Current Design and Short Status
Undulator Cavity BPM System Status
Extraction Michael Bevins May 17, 2007
LCLS Vacuum System Plans (July 07)
Electron Beam Systems ETC and Methodology
Globus-M2 will be constructed by the end of 2015
Presentation transcript:

BPM Upgrade Presented by: Nadine Kurita Contributors: S. Smith, S. Ecklund, J. Sebek, D. Martin, R. Hettel, R. Johnson, N. Reeck, M. Kosovsky, D. Arnett

Vacuum System p.2 Outline m BPM Upgrade project overview m 2005 upgrade/testing m LER Arc BPM’s m IR2 BPM’s m Summary

Vacuum System p.3 BPM Upgrade Overview m There are 3 styles of BPM’s in the PEP-II machine.  LER Arc BPM’s  Helicoflex sealed, SS housing  HER Arc BPM’s  Welded, CuNi housing  LER/HER Straight BPM’s  Welded, SS housing m Thermal and experimental models show that the BPM buttons could be approaching temperatures around 800 to 1000 C from HOM heating.  HOM heating has numerous parameters (i.e. bunch current, total current, beam position, chamber geometry). m Two areas are of major concern due to the high current and BPM position relative to beam.  LER arc BPM’s  IR2 BPM’s

Vacuum System p.4 Current Upgrades Downtime (cont.) m Four sets of modified LER Arc BPM’s at ARC 1,  Goal – to reduce HOM power.   7 mm molybdenum button  Welded tabs on buttons and pressed them off. l lbs, l average was ~ 60 lbs (excluding outliers).  Pressed molybdenum buttons l lbs l Test push ~850 lbs  leak tight.  One set has a 5 mm gap between button and housing.  One set has a 1 mm gap between button and housing. l Laser welded SS insert

Vacuum System p.5 Current Upgrades Downtime (cont.)  7mm button reduces power dissipated and transmitted by the BPM’s. (S. Ecklund)  Factor of 2 – 4?  Data indicate that the 7mm button with the 1mm gap absorbs the least amount of power.  Shorted button to housing  3 mm wide x 6.3 mm long,.4 mm thick Inconel strip l resistance welded l 0.25 mm of copper for thermal conductivity.   T increase by ~ 23 X l For, Q = 10W,  T = 200  C  Issues l Overheated the attenuators that were added for the additional HOM power that would be coming out of the transmission line. l Resistance welds may fail and lead to arcing.  Does not appear to be a viable solution. short

Vacuum System p LER Arc BPM Upgrade m Option 1 – Retrofit existing Borosilicate Glass BPM’s.  Successfully completed this downtime.  7mm button reduces power dissipated and transmitted.  Signal meets precision/accuracy requirements for stored beam at high current.  Signal is sufficient for single turn high current beam.  Downtime experience  Welded tabs on buttons and pressed them off. l lbs, l average was ~ 60 lbs (excluding outliers).  Pressed molybdenum buttons l lbs l Test push ~850 lbs  leak tight.  Pin diameter tolerance +/-.002”  Press fit tolerance is +/-.0001”  Pins were measured and buttons were match machined – forces were still larger than anticipated.  Errors in QC data lead to failures. Button partially pressed on.  Fit tolerance on small diameters make this task difficult & costly.

Vacuum System p.7 Design – BPM Retrofit m Current Plan  Re-design press fit to reduce force and increase tolerance band.  Taper and reduce press fit region. m Pros  Does not require significant design effort. m Cons  Requires manufacturing downtime work.  Could encounter difficulties and failures  Buttons diffusion welded from high temperatures?  Glass seal failing from removing buttons or pressing buttons (low risk – from tests).  Partially pressed on buttons – difficult to recover BPM if this occurs.  Thermal conductivity – 8 to 20 X worse than alumina.  Contingency cost could run higher (SLAC labor versus fixed cost). m Cost Estimate (N. Reeck) – consistent with AIP budget  Retrofit of the BPM  Indirect Cost: $ each including 28% contingency  Installation  Indirect Cost: $168 each l Cost does not include helicoflex seal

Vacuum System p.8 Design – Alumina BPM  Option 2 Saint Gobain Feedthru  SSRL/SPEAR3 – working on purchasing these for a small gap undulator chamber.  Preliminary cost estimate $245 each for 20 pieces.  Bake out/leak check - +$60 each.  Specification and drawings near completion 90%.  Pros l design exists l Alumina – better thermal conductivity l Cost is competitive with retrofitting.  New - $305, does not include destructive & electrical testing cost.  Total cost within AIP budget – potential less risk of overrun due to fix cost.  Retrofit - $340  Cons l Needs testing l Dielectric constant 2 X higher than glass. l New vendor – not much reliability data. l Not electrically equivalent to remaining BPMs l Schedule

Vacuum System p.9 Alumina Feedthru Layout Drawing

Vacuum System p.10 Major Milestones – option 1 - Retrofit m Dec ’05-Complete scope of project – critical decision. m Jan ’05-Complete new design m Feb ‘05-Push pull tests m Mar ‘06-Order Parts m May ’06-Receive buttons m Aug ’06-Remove & modify 200 feedthrus, 2-3 people/month m Sep ’06-Remove & modify 200 feedthrus m Oct ’06-Remove & modify 200 feedthrus m Nov ’06-Remove & modify 200 feedthrus m Dec ’06-Complete re-installation

Vacuum System p.11 Major Milestones – option 2 m Dec ’05-Complete scope of project – critical decision. m Dec ’05-Complete design specification m Dec ‘05-Order Prototype m Feb ‘06-MAFIA/RF simulations m Mar ’06-Receive Prototypes m May ‘06-Destructively test m May ‘06-Order production units m Aug ‘06-Receive 1 st lot (100 units) m Nov ’06-Receive last lot (200 units/month?) m Sep ’06- Install 1 st lot m Dec ’06-Install last lot

Vacuum System p.12 Major Milestones m Dec ’05-Complete scope of project. m Dec ’05-Complete design specification m Dec ‘05-Order Prototype m Feb ‘06-MAFIA/RF simulations m Mar ’06-Receive Prototypes m May ‘06-Destructively test m May ‘06-Order production units m Aug ‘06-Receive 1 st lot (100 units) m Nov ’06-Receive last lot (200 units/month?) m Sep ’06- Install 1 st lot m Dec ’06-Install last lot

Vacuum System p.13 IR2 BPM Upgrade Plan m Remove 15 mm button and leave 2.4 mm center pin as button. m Attempt to remove buttons in situ without removing chambers if possible. m Buttons will be leak checked from the reverse side if space permits. m If failure occurs during attempt (leak or failure to remove button).  Replace with copper blank.  Replace with new helicoflex sealed BPM similar to the new LER arc BPM.

Vacuum System p.14 BPM Removal Tool

Vacuum System p.15 Summary m HER arcs and LER/HER straights BPM’s do not require an upgrade at this time. m There is an upgrade plan for LER arcs and IR2.  Need to determine if BPM’s can be pulled in-situ. If not a decision to remove the chambers or leave the BPMs “as is” will have to be made. m Will need full support from physicists for RF/HOM analysis because the design & procurement cycle is long for new BPMs.