Q&E 6.8 Project 1 Maintenance costs: $ 750 + $ 150 per yr. = $ 900 per yr Need to calculate present value of stream of future costs:

Slides:



Advertisements
Similar presentations
The Land Market. Is the market for land different from that of other goods? Is there a fixed supply of land?
Advertisements

Ready, Set, Go!
LAUNCH RAMP UP EXPLOITATION EROSION t0=0 t1 t2 t3 t4 BareBonesNPV Calculation.
“Interest earning interest”
Cost and Time Value of $$ Prof. Eric Suuberg ENGINEERING 90.
EML EML Engineering Design Methods Engineering-Economics Introduction Economic Decision Rules Hyman: Chapter 8.
PACE Financing for Commercial Real Estate Companies Money is often misunderstood… George Caraghiaur Senior Fellow, PACENow April 2015.
1 MER 439 Design of Thermal Fluid Systems Engineering Economics 3. Comparing Alternatives Professor Wilk Winter 2007.
Liquid Wall Thickness, Life, Pumping Power, COE trade-offs Wayne R. Meier and Ryan P. Abbott LLNL ARIES Meeting Oct. 2-5, 2002 PPPL.
Estimating NPV: Special Applications InflationUnequal Lives Calculating Bid Prices.
Infinite Intervals of Integration
Calcul mental. Calcul n°1 2 x 7 = Calcul n°2 3x 7 =
Calculer en avançant – 734 = – 734 =
M.V & N.Y Productions2. 2 It is now recognised that 87% of CBHS Lewisham students have a Language Background Other Than English (LBOTE) and that in most.
American made Renewable American made Fuels Retailing Scott Zaremba Lawrence, Kansas.
Cash Flow Estimation for Capital Budgeting
Id Gaffe Hilary Brugger Stephen Kelly Anastasia Nugent Joseph Roberts.
Let’s Play Jeopardy! $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Chapter 10 Adelman & Marks
Elasticity of Demand Part II Chapter 5 D1D1 D1D1 Inelastic Elastic.
Simple & Compound Interest. Simple Interest -Interest paid only on an initial amount deposited or the amount borrowed -The amount is called the PRINCIPLE.
AW involves converting all cash flows into an A value The AW for one life cycle is the same AW for 2,3,4, or or an infinite number of life cycles,as long.
Lesson3: Mortgage Payments Amortization = How long it takes you to pay off the house, ex: 10, 20 years or more. Down Payment = 1 st cash payment of at.
1 Reviewing Complex Flow Perpetuity If there is a mix of recurring and non-recurring or one-time cash flows that must be capitalized for perpetuity: 1.)
Conversion Factor Method of Analysis. Conversion Factor Method a.k.a. Dimensional Analysis.
7.4a Notes – Evaluate Logarithms. 1. Solve for x. a. x = 2 b. c.d. x = 1 x = 0 x = -2.
LIFE INSURANCE TERM INSURANCE You only buy for a limited number of years (ex: 10 yrs.) Cheaper. Cannot cash it out. WHOLE-LIFE INSURANCE You purchase it.
Gainful Employment Negotiated Rulemaking Informational Data Analysis 2013 Draft Regulation & 2011 Final Rule (without repayment rate) 2013 Draft Regulation.
Copyright © 2007 Prentice-Hall. All rights reserved THE TIME VALUE OF MONEY PRESNET VALUE FUTURE VALUE.
Copyright © 2007 Prentice-Hall. All rights reserved 1 The Time Value of Money: Present Value & Future Value Part of Chapter 20.
The great EU debt write off Starting positions May 17 th Contact: Anthony J. Evans,
Causes of Inflation.
Water Resources Planning and Management Daene C. McKinney Economic Analysis of Alternative Water Plans: 1. Benefit/Cost Analysis.
CALCULATING PAYBACK PERIOD. Formula Payback Period = Initial Investment Net annual savings + Income.
Project Evaluation Identify accurate measures of benefits and costs in monetary terms and uses ration benefits/costs Consider a proposed ERP implementation.
Slide CHAPTER 10 INTERCOMPANY FIXED ASSET TRANSFERS.
AW involves converting all cash flows into an A value The AW for one life cycle is the same AW for 2,3,4, or or an infinite number of life cycles,as long.
The Grand Geochemical Cycle: Residence time The average time that a substance remains dissolved in seawater We call this the “residence time” of an element.
A PRESENTATION ON DIABETES MELLITUS IN INDIGENOUS AND NON - INDIGENOUS POPULATION AMONG AUSTRALIA PREPARED BY:MR.GIJIL CHALAYIL JOSE.
Calcasieu Parish Mechanical Treatment Plant Inspection Program Calcasieu Parish Division of Planning and Development November, 2011.
LO: I can multiply using the Grid Method. Please note that this is for 3 Digit Numbers but it still shows how this works. Yr 5’s target is to multiply.
UCLL Sub Loop Co-Location Annualisation Factors used in Calculation.
Effective Interest Calculations
Calculating Payback Period
ALTERNATIVES TO THE NET PRESENT VALUE RULE
Business Case Development Key Components :
Estimating Manufacturing Costs A.K.A. Operating Costs
PE 2 Economic Analysis YR 0 YR 1 YR 2 YR 3 YR 4 YR 5 $120,000 $25,800
FACILITIES AND ADMINISTRATION (F&A) COST CALCULATION
A graphing calculator is required for some problems or parts of problems 2000.
Board Conference Budget 19-20
Assumptions Plant Density: 5m x 3m = 666 Trees / hectare No Ridging
© T Madas.
Unit 3 Review (Calculator)
© T Madas.
Objective- To calculate the rate of change
The Real cost of facility ownership
Designed for a Capital experience!
Bonds to 10 and 100 Hint: Use your bonds to 10 to work out bonds to – 5 =  10 – 8 =  10 – 3 =  10 – 10 =  100 – 30 =  40 +  = – 90.
© T Madas.
Review 1+3= 4 7+3= = 5 7+4= = = 6 7+6= = = 7+7+7=
Calculate 9 x 81 = x 3 3 x 3 x 3 x 3 3 x 3 x 3 x 3 x 3 x 3 x =
© T Madas.
Calculate 81 ÷ 3 = 27 3 x 3 x 3 3 x 3 x 3 x 3 ÷ 3 = This could be written as
Timed Multiple Choice Questions
FACILITIES AND ADMINISTRATION (F&A) COST CALCULATION
Capital Asset Management
Complete the family of four
Timed Multiple Choice Questions
Best WordPress Maintenance Services.
Presentation transcript:

Q&E 6.8 Project 1 Maintenance costs: $ $ 150 per yr. = $ 900 per yr Need to calculate present value of stream of future costs:

S = 900 per yr r = 8% (.08) n = 30 yrs

Project 2 Capital cost (present) = $10,000 Maintenance costs: $ 800 every 5 yrs Need to calculate present value of each future cost:

Yr of costDiscount factorCostDiscounted 01/(1.08)^ 0 = /(1.08)^ 5 = /(1.08)^ 10 = /(1.08)^ 15 = /(1.08)^ 20 = /(1.08)^ 25 = /(1.08)^ 30 =