Beam line summary paul drumm for beam line group.

Slides:



Advertisements
Similar presentations
1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
Advertisements

January 14, 2004 TJR - - UPDATED 1/25/04 1 MICE Beamline Analysis Using g4beamline Including Jan 25 Updates for Kevin’s JAN04 Beamline Design Tom Roberts.
TJR Feb 10, 2005MICE Beamline Analysis -- TRD SEPT041 MICE Beamline Analysis – TRD SEPT04 Tom Roberts Muons, Inc. February 10, 2005.
Paul drumm, mutac jan MICE Beamline Optics Design Kevin Tilley, RAL, 12th June MICE Needs Generic Solution Pion Injection & Decay Section (a) Inputs.
Slide 1 MICE Beamline Design and Commissioning Review 16 th Nov 2007 Simulation comparison / tools / issues Henry Nebrensky Brunel University There are.
1Malcolm Ellis - Video Conference - 7th December 2006 Data Challenge Report  Disclaimer  Data Challenge definition(s)  Software status u G4MICE u GRID.
TJR 10/30/031 MICE Beam rates Tom Roberts Illinois Institute of Technology 10/30/03.
Project Report Paul Drumm CM15, FNAL June MICE Schedule Overview First beam September/October 2007 –Shutdown from January 2007 –Eight months for.
K.Walaron Fermilab, Batavia, Chicago 12/6/ Simulation and performance of beamline K.Walaron T.J. Roberts.
Diffuser in G4MICE Victoria Blackmore 09/03/10 Analysis Meeting 1/8.
TJR August 2, 2004MICE Beamline Analysis1 MICE Beamline Analysis JUNE04 Including a proposal for a JUNE04A Configuration Tom Roberts Illinois Institute.
Beamline-to-MICE Matching Ulisse Bravar University of Oxford 2 August 2004 MICE performance with ideal Gaussian beam JUNE04 beam from ISIS beamline (Kevin.
MICE Beam Line Design Oct 24 th 2005 Dean Adams, Kevin Tilley Based on TURTLE element definitions by K Walaron, T Roberts and K Tilley.
Beam line review group aims for review paul drumm.
30 June 2004MICE VC1 MICE  functions Since last VC report: –New Mike Green configurations for decreased spacing between focus and matching coils of 400mm,
May 22, 2008 TJRMICE Beamline Collimation and Correction 1 Tom Roberts Carol Johnstone Muons, Inc.
Paul drumm, mutac jan K. Tilley, MICE-VC, 10/05/07 Status of Beamline Design / Commissioning MICE-VC.
TJR 7/30/031 Geant4 Simulations of the MICE Beamline Tom Roberts Illinois Institute of Technology 7/30/03.
Mark Rayner, Analysis workshop 4 September ‘08: Use of TOFs for Beam measurement & RF phasing, slide 1 Use of TOFs for Beam measurement & RF phasing Analysis.
1 MICE Beamline Design: General principles & expected capabilities Kevin Tilley, 16 th November Charge to beamline & desirable beam General principles.
Status of Undulator-based Positron Source Baseline Design Leo Jenner, but based largely on a talk given by Jim Clarke to Positron DESY-Zeuthen,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Beam Commissioning Workshop, 19th January Luminosity Optimization S. White, H. Burkhardt.
M. apollonio MICE Beamline summary. - Beamline parallel session (June 1 st ): - envisaged goals (Alain) - assess readiness of the line magnet status (Ken)
, EUROnu Meeting, Strasbourg J. Pasternak Status and recent progress on muon IDS-FFAG J. Pasternak, Imperial College, London / RAL STFC Work.
Beam line commissioning Preparations for Phase1 Kevin Tilley For Paul Drumm & the beam line group.
WP5: Detector Performance and Cost EuroNu Meeting CERN, 26 March 2009 Paul Soler Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera.
Update Chris Rogers, Analysis PC, 13/07/06. State of the “Accelerator” Simulation Field model now fully implemented in revised MICE scheme Sanity checking.
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
S. Kahn 5 June 2003NuFact03 Tetra Cooling RingPage 1 Tetra Cooling Ring Steve Kahn For V. Balbekov, R. Fernow, S. Kahn, R. Raja, Z. Usubov.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Paul drumm, mutac jan Precursor: - Resources since cm16. Beamline Review Response. Optics related work: the major threads: -Current (ε,p) status.
BDS Lattice Design : EDR plans GWP03 Meeting 04/12/2007.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
MEIC Detector and IR Integration Vasiliy Morozov, Charles Hyde, Pawel Nadel-Turonski MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
1June 2 nd 2009MICE CM24 - RAL1 m. apollonio Beamline+( ,P) matrix.
1 Updated Run Plans. K.Tilley, MICO, 07/02/08 - pre-commissioning - Target, - beamline functionality - detectors, particle production - decay solenoid.
Studies on low crossing angle bumps for the LHC luminosity upgrade G. Sterbini Accelerator Technology Department Magnet and Superconductors Group CERN,
Detector / Interaction Region Integration Vasiliy Morozov, Charles Hyde, Pawel Nadel-Turonski Joint CASA/Accelerator and Nuclear Physics MEIC/ELIC Meeting.
A.Saini, K.Ranjan, N.Solyak, S.Mishra, V.Yakovlev on the behalf of our team Feb. 8, 2011 Study of failure effects of elements in beam transport line &
Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz,
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz Status and Plans for Linac and RLAs.
Paul drumm, mutac jan Status of Muon Beamline design work Kevin Tilley, RAL, 9th Feb Including Beamline Materials in new revision Reference ('True')
1June 1 st 2009MICE CM24 - RAL1 Beamline Optics m. apollonio.
August 8, 2007 AAC'07 K. Yonehara 1 Cooling simulations for Muon Collider and 6DMANX Katsuya Yonehara Fermilab APC MCTF.
Muons, Inc. Feb Yonehara-AAC AAC Meeting Design of the MANX experiment Katsuya Yonehara Fermilab APC February 4, 2009.
Simulation of Extinction Channel Eric Prebys Mu2e Extinction Technical Design Review 2 November 2015.
J-Parc Neutrino Facility Primary Proton Beam Design A. K. Ichikawa(KEK), Y.Iwamoto(KEK) and K.Tanabe(Tokyo) et.al. 7 th Nov. 2003,
CM Nov 2009 DOES MICE NEED STEP III ? Somewhat hard to understand MICE Schedule… –If the gods are (un)kind it’s possible that SS1, SS2 & FC1 are.
1 1 Optics related work: the major threads: -Current (ε,p) status - G4BL/TTL Simulation comparisons - Beam steering/correction -Collimation d/stream &
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz IDS- NF Acceleration Meeting, Jefferson Lab,
1 April 1 st, 2003 O. Napoly, ECFA-DESY Amsterdam Design of a new Final Focus System with l* = 4,5 m J. Payet, O. Napoly CEA/Saclay.
Beam Commissioning Adam Bartnik.
MICE at Step IV without SSD
Beam-Line Analysis m. apollonio 7/7/2010 CM27 - RAL 1.
MICE Beamline Status m. apollonio 17 December 2009 MICE VC
Design of the MANX experiment
Effect of Reduced Focus Coil Current on Step IV and Step VI
Β*-reach in 2017 R. Bruce, S. Redaelli, R. De Maria, M. Giovannozzi, A. Mereghetti, D. Mirarchi Acknowledgement: collimation and optics teams, BE/ABP,
Optics Development for HE-LHC
A BeamLine update m. apollonio 7/7/2010 CM27 - RAL 1.
Progress of SPPC lattice design
K. Tilley, ISIS, Rutherford Appleton Laboratory, UK Introduction
MEBT1&2 design study for C-ADS
Triplet corrector layout and strength specifications
Progress on Non-linear Beam Dynamic Study
G.H. Wei, V.S. Morozov, Fanglei Lin Y. Nosochkov (SLAC), M-H. Wang
Progress Update on the Electron Polarization Study in the JLEIC
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Presentation transcript:

Beam line summary paul drumm for beam line group

Beam optics status Design goals: pp 11 66 10  240~G4 200TT ~G4 TT G4 TT ~G4 140~G4 CM14-e-p tunes Extrapolation MeV/c Matching: Fixed & Scaled Tracker fields Collimation below 3-6  G4BL: 240 MeV/c scaled from 200 MeV/c gives same emittance and more tracks (x1.6) - early results TT: Transport & Turtle G4: G4Beam line

Comments Fringe fields and matching point not a good choice –Implies a retune of parameters for G4BL Implement a new cross over point  2do In reality – varying (e.g) the last three quads may be a faster tool than the present design tools Real time processing / automation – maximise by track info from (e.g.) three tracker planes

Correction studies Beamline steering correction (DJA) - For muon transport section –Studies already completed for CM and CM cases –Poss layout already proposed for downstream steering magnets. (1H, 2V) –Studies supplemented by scenario for CM case:- –New TS1 or TS2 correctors seem suitable (?) + 1 mm position, 0 angle H,V Cases

1  2  3  Beam to diffuser 10  beam

Beam to diffuser 1  2  3  …careful look to optimise available area

Beam line optics summary Diffuser & metal work restricts to 2.5  (maybe 2s at 140 MeV/c) Diffuser size: –needs to be larger to investigate the aperture –there is some room for adjustment in the design Collimation studies need to be more realistic –Inform engineering design Correction dipoles –Baseline position needs more study

Beam line schedule ….

Beam line geometry TTargetSheffield APion CaptureISIS BDecay Solenoid EID CMuon Transport Channel Liverpool ? DDiffuserOxford

Beam line engineering

Comments 1 st quad triplet engineering details close to completion –Next complete design of D1 stand and vac box Pushing Dipole 1 to saturation: –not absolutely necessary! –limitation partly due to solenoid aperture –parameter: magnet gap (6” is ok ) – but what is the optimum? Partly unmapped territory Collimation – Used perfect collimation so far – no real engineering design yet Steering magnets – Have a scheme » needs further evaluation – Engineering solution available Need to update model with details of Ckov1 !

Review –Stability of geometry? current design status –Initial engineering Fixed:  1,  2, C/L D 1 Treat as modules: what is the risk? – e.g. D 2, T 456, T 789 –Process – transport – turtle – G4BL –1 st pass?

Finally Bottleneck has been simulation –Transport Turtle loop (DA/KT) –outer G4BL simulation loop (TJR/KW) –Matching/emittance conditions (CR) Tom Roberts –welcome return to group Additional support –new position at Brunel now filled at least 50% on beam line