ACTAR - EURONS Collaboration meeting Project Coordinator: H. Savajols / P. Roussel-Chomaz Participating Institutions: 1.GANIL (AC) / DAPNIA (AC) / CENBG.

Slides:



Advertisements
Similar presentations
EuroNu CERN February 5, 2008 Marco Zito Super-Beam work package Marco Zito Dapnia-Saclay On behalf of the SB w2 team EuroNu 5/2/2008 Thanks to M. Dracos.
Advertisements

JRA01: ACTAR Collaboration : GANIL, DAPNIA Saclay, CENBG Bordeaux, Univ. Liverpool, Daresbury, GSI, Univ. Santiago de Compostela Objectives: Investigate.
DOE Neutrino Program Plans
N Network for Active Targets 12 institutions (France, Spain, UK, Germany, Poland) GANIL, France CENBG Bordeaux, France SPhN/DAPNIA/DSM Saclay, France IPN.
Bordeaux Meeting June 6-7th, 2005 Meeting starts at 2:30 pm, Monday June 6th 1)Summary of EURONS meeting (February 2005, Madeira) 2)Discussion of ACTAR.
ACTAR WORKSHOP BORDEAUX
Guenther Rosner FAIR Design Study, PANDA 3, GSI, 19/1/06 1 PANDA3: Magnet design and integration of detectors Tasks & participants Progress Milestones.
Helsinki Sept 2007 S.Galés ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures.
Simulation of a Ring Imaging Cerenkov detector to identify relativistic heavy ions. Manuel Fernández-Ordóñez Universidad de Santiago Compostela.
The AGATA project concept of  - ray tracking design and development Witek Męczyński The Henryk Niewodniczański Institute of Nuclear Physics Polish Academy.
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
Neutrino detectors for the future Neutrino Facility global numbers : next project ~ 600 M€ (NB NOvA, T2K = 200M$, OPERA=100MCHF, etc...) community between.
Analysis and Control of Beam Dynamics in EMMA Kai Hock and Andy Wolski STFC PPRP Meeting, Glasgow, 24 June 2009.
ACTAR Meeting Liverpool December 10th, 2008 ❍ 9:30 Introduction Patricia ❍ 10:00 SimulationsHector Coffee break ❍ 11:15 Tests with MICROMEGASRiccardo ❍
Simulation of a Ring Imaging Cerenkov detector to identify relativistic heavy ions. M.Fernández-Ordóñez, J.Benlliure, E.Casarejos, J.Pereira Universidad.
FAIR GmbH and FAIR Project History, Status and Outlook
General Electronics for Time projection chambers GET a Multi-Project for IRFU/SPhN, GANIL, GSI, Compostela, CENBG, NSCL/MSU, Darsebury, York General Electronics.
First simulations for ACTAR H. Alvarez, J. Benlliure, M. Caamaño, D. Cortina, I. Durán Universidad de Santiago de Compostela EURONS ACTAR JRA 1 Ganil,
Status of the Calorimeter Working group activities GSI, 16 th October 2007.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
GANIL Meeting November 29th, ) Discussion of ACTAR Yellow book (30 mn) 2)Simulations : Lola, Hector, Roy, Beatriz (2 h) 3)Tests with MAYA-ITO: Fanny,
The York Bragg Detector – Design and Simulation James Butterworth Seminar at York 31/03/2010.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study 4th Annual Report meeting February 12, 2009 J. Eschke,
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
Synergy Program for Front-End, Electronics, Data Acquisition & Control JRA 30 Emanuel Pollacco CEA Saclay SGFDC for Nuclear Physics KVI, STFC Daresbury,
WP5: Detector Performance and Cost EuroNu Launch Meeting 5 February 2008 Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera Villanueva,
Tools for Nuclear & Particle Physics Experimental Background.
PHIN JRA Status PHIN collaboration CARE SC meetingParis February 2004.
Advanced VIRGO WG1: Status VIRGO, Cascina Andreas Freise University of Birmingham.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
Summer Practice in JINR Mathematical modeling of high-energy particle beams in accelerators.
European Commission DG Enterprise VIRTUAL ENVIRONMENT FOR INNOVATION MANAGEMENT TECHNIQUES VERITE Kick-off meeting Thessaloniki November 2001.
D. Suzuki Institut de Physique Nucléaire d’Orsay
F. Azaiez (IPN-Orsay) The European Collaboration for Stable Ion Beams – ECOS Pushing the limits with high intensity stable beams A typical bottom up initiative.
Construct development FEE and DAQ system - Modular - test different ASICs - test different ADCs (sampling, etc.) - zero suppression, timestamping (triggerless.
, GSI DarmstadtMartin Winkler, GSI DIRACsecondary Beams Annual report on Large-area beam tracking detectors for fast extracted beams Task 8 –
Peter Spiller, DIRAC Kick-off meeting Peter Spiller Design Study Group DIRAC kick-off meeting SIS100.
WP5: Detector Performance and Cost EuroNu Meeting CERN, 26 March 2009 Paul Soler Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera.
EUROTeV WP4 Report Polarised Positron Source Jim Clarke, on behalf of the WP4 team DESY Zeuthen STFC (Daresbury and RAL) University of Durham University.
ACTAR meeting - Dec 10th 2008Hervé Savajols (GANIL) Tracking Algorithms Hervé Savajols & Thomas Roger (GANIL) Wolfgang Mittig (MSU) …
Detector Simulation Presentation # 3 Nafisa Tasneem CHEP,KNU  How to do HEP experiment  What is detector simulation?
JRA01: ACTAR Task J01-1: Physics constraints and detailed simulations Subtask J01-1-1: Physics constraints Subtask J01-1-1: Simulations Task J01-2: Test.
The CMS Simulation Software Julia Yarba, Fermilab on behalf of CMS Collaboration 22 m long, 15 m in diameter Over a million geometrical volumes Many complex.
1 Seventh RD51 CB meeting – 2/9/2011 AGENDA 1.Approval of the agenda 2.Approval of the minutes of the VII CB CERN, 14/4/2011 (Minutes circulated.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
ECOOL Meeting 03/26/10 1 Low-E cooler baseline decisions: 1.FNAL’s cooling section “as is” – with weak solenoids, correctors, etc. (to prevent over focusing.
I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Contract for the EURONS project has been signed (~14 M€) Project started on
Giovanni Ciavola, JRA-07 ISIBHI JRA-07 Ion Sources for Intense Beams of Heavy Ions (ISIBHI) EURONS PCC Meeting, Groningen, Holland, December 2006.
CEA DSM Dapnia Sédi Streamer theory Streamer theory Protection schemes Protection schemes Some ideas Some ideas Input Protection for Gas Detector Electronic.
Tracking in a TPC D. Karlen / U. Victoria & TRIUMF for the LCTPC collaboration.
Welcome !! to the CAoPAC Workshop Carsten P. Welsch.
CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.
R 3 B CALORIMETER Large dynamical range p   Spectrometer ((2-3),
Atlas Software May, 2000 K.Amako Status of Geant4 Physics Validation Atlas Software Week 10 May, Katsuya Amako (KEK)
IPM Sim 2016 workshop Discussion sessions – main points.
Eija Tuominen, coordinatorHIP/UH Detector Laboratory, October 2010 DETECTOR DEVELOPMENT at HELSINKI DETECTOR LABORATORY Detector Laboratory is a joint.
Status of PSD simulation in Shine Oleg Petukhov Institute for Nuclear Research, Moscow NA61 Analysis/Software/Calibration meeting , Warsaw.
O. Kester, NuSTAR annual meeting, 27/02/2013
The Design and Effects on the Electron Beam of the International Linear Collider Positron Source Helical Undulator Duncan Scott Magnetics and Radiation.
Eurisol DS, Task 11 meeting, Helsinki September‘07 Task 11.2: Fragmentation of post accelerated ISOL beams David Pérez Loureiro Universidad de Santiago.
EURISOL DS Task 11.2 Universidad de Santiago de Compostela, Spain Eurisol DS: task 11 meeting March‘05.
Orsay, 03/Feb/05EURISOL - Beta Beam TaskM. Benedikt 1 The Beta-Beam Task Status and Planning 02/2005 to 01/2006 Michael Benedikt AB-Department, CERN.
1 GSI, Darmstadt Goethe Universität Frankfurt Ph.D Committee meeting 16 th of August 2011 Grzegorz Kalicy Development and Test of a Prototype for the PANDA.
for the EURISOL Steering Committee
Simulation Project Structure and tasks
CMS Goal of the experiment
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
Active Target for the low-energy short-lived radioactive beams
Ch. THEISEN – CEA Saclay MUSETT: the segmented Si array for the focal plane of the VAMOS spectrometer Ch. THEISEN – CEA Saclay.
GEANT Simulations and Track Reconstruction
Presentation transcript:

ACTAR - EURONS Collaboration meeting Project Coordinator: H. Savajols / P. Roussel-Chomaz Participating Institutions: 1.GANIL (AC) / DAPNIA (AC) / CENBG (AC) 2.DARESBURY (FC) 3.LIVERPOOL (AC) / BIRMINGHAM * 4.SANTIAGO DE COMPOSTELA (AC) / GSI (AC) / INP CRACOW * (* associated participant) I3 EURONS

Agenda  Financial revue  Detailed plan for the first 18 months Define R&D efforts Working groups Milestones and expected results  Short presentations Bertram Blank - CENBG TPC Fanny Rejmund - Range measurements Marielle Chartier - UK TPC  Next meeting (CENBG Bordeaux June 6-7) I3 EURONS

Budget over 3 years Start date  1 January 2003  Additional contacts between institutions (ex: Recent FRENCH-GERMAN COLLABORATION AGREEMENT I N2 P3 - DSM/CEA and GSI on Active Target : 2 * 21 days in 2005) I3 EURONS

ACTAR EC Budget - Overview Manpower : 1 year postdoc : 54 kEuros I3 EURONS

EC Budget - Overview 1 Travel : 844 Euros I3 EURONS

EC Budget - Overview I3 EURONS

Detailed plan for the first 18 months NB: Some of the tasks described below will not be completed before the 18 months deadline

Working groups focussing on R & D Task 1 : Definition of key experiments [0-4 months] Physics constraints (Resolutions, dynamic ranges needed, ancillary detectors) define 2 or 3 high priority experiments Participants : all institutes Head coordinator : Bertram Blank (CENBG Bordeaux)  White Paper end of May (Spiral2 and FAIR)  Discussion of the white paper (6-7 june CENBG Bordeaux)

Working groups focussing on R & D Task 1 and 2 : Development of event generators modeling key experiments [3-18 months] Detail simulations (GEANT, MAXWELL, …) to optimise the geometrical, electrical and magnetic field configuration (Best resolutions for given dynamic ranges) Participants : all institutes Head coordinators : Dolores Cortina-Gil (USC Spain)  Report June 2006  Preliminary description of detector geometry and response

Working groups focussing on R & D Task 3 Group 1 Tests properties of different gases at room temperature and pressure [6-18 months]  Test bench (USC Spain) Beam shielding (GANIL) Studies of interactions of heavy ions with matter [7-18 months] (energy loss, energy straggling, angular straggling, range)  MAYAITO test bench at GANIL SME line [ready for september months]  TPC test bench at the CENBG Van de Graf (p,d, 3 He, 4 He) [ready for september months]  test bench at the DAPNIA accelerator [in discussion] Participants : USC, GANIL, CENBG, DAPNIA Head coordinator : Fanny Rejmund (GANIL)  Detailed work program (september 2005)  Intermediate report (July 2006)

Working groups focussing on R & D Task 3 Group 2 Studies of cryogenic gases and gases at different pressures  GSI cryogenic chamber test bench Test of different readout chamber designs with existing prototypes (MAYAITO GANIL, CENBG TPC…) [3-18 months] Study of cylindrical geometry design option [12-18 months] Participants : GSI, GANIL, CENBG, Liverpool, Daresbury, Birmingham, DAPNIA Head coordinator : Roy Lemon (CCLRC)  Detailed work program (september 2005)  Intermediate report (July 2006)

Working groups focussing on R & D Task 4 Evaluation of existing ASICs [3-12 months]  Report end of 2005 Develop specification of front end and readout electronics [7-18 months]  pre-report july 2006 Participants : GANIL, CENBG, Liverpool, Daresbury, Birmingham, DAPNIA Head coordinator : E. Pollacco (DAPNIA)

Detail plan for the first 18 months  Preliminary description of detector and geometry  Selection of different options  Collaboration Workshop (July 2006)  Intermediate report to EURONS / EC 18 months Dead Line

What is missing...  Specific ASICs development (long time range, high dymanic …)  Specific front end electronics  Test module including magnetic field  Dedicated ray tracing algorithm development  Less detail studies due to the reduction of manpower financed by EURONS