Mercury Catcher Status V.B. Graves Hg Jet Design Meeting Princeton University Nov 15, 2004.

Slides:



Advertisements
Similar presentations
Regional Routing Model Review Frank Southworth Oak Ridge National Laboratory Oak Ridge, TN NETS Program Review December 12, 2005 Washington DC.
Advertisements

Regional Routing Model Review: B) A Multimodal Freight Routing Model Frank Southworth Oak Ridge National Laboratory Oak Ridge, TN NETS Program Review.
EPICS Channel Access Overview 2006
Mercury Intense Target (MERIT) Update Status of the Target System Design P.T. Spampinato V.B. Graves T.A. Gabriel Muon Collaboration Friday Meeting October.
Mercury Chamber Update V. Graves NF-IDS Meeting October 4, 2011.
A Free Jet Hg Target Operating in a High Magnetic Field Intersecting a High Power Proton Beam Van Graves, ORNL P. Spampinato,T. Gabriel, ORNL H. Kirk,
MERIT Hg System Design V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Review Meeting Brookhaven National Laboratory Dec 12, 2005.
NTOF11 Hg System Design Status Van Graves Tony Gabriel, Phil Spampinato Collaboration Meeting – Princeton University Apr 2005.
Titan-izing the Target Module V.B. Graves 16 Dec 2005.
MERIT Hg System Final Design Review Hg Target System Design Interfaces V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma.
POSTER TEMPLATE BY: Presentations.com POSTER TEMPLATE BY: Presentations.com Outlet Inlet n’=375 n=150 n φ =75 (dφ=1.2 ⁰ ) Extra Terms.
Target System Transportation and Decommissioning P.T. Spampinato V.B. Graves Hg System Safety Review CERN June 19-20, 2006.
Hg System Design V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
Managed by UT-Battelle for the Department of Energy Neutrino Factory Mercury Containment Concepts V.B. Graves 2 nd Oxford-Princeton High- Powered Target.
Neutrino Factory Target Cryostat Review Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
Neutrino Factory Mercury Flow Loop V. Graves C. Caldwell IDS-NF Videoconference March 9, 2010.
High Power Hg Target Conceptual Design Review Hg Jet Nozzle Analysis M. W. Wendel Oak Ridge National Laboratory February 7-8, 2005.
Neutron Scattering Experiment Automation with Python RT2010 Conference, Lisbon, Portugal (PCM-26) Piotr Żołnierczuk, Rick Riedel Neutron Scattering Science.
MERIT Collaboration Meeting ISSUES RELATING TO THE Hg-JET TARGET SYSTEM P.T. Spampinato V.B. Graves T.A. Gabriel Princeton University November 17, 2005.
MERIT Hg System Design Update V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting Princeton University Nov 17-18, 2005.
1Managed by UT-Battelle for the U.S. Department of Energy MERIT Videoconference 11 Mar 2009 Neutrino Factory Cryostat 1 Concept V.B. Graves MERIT Videoconference.
N UCLEAR S CIENCE AND T ECHNOLOGY D IVISION O AK R IDGE N ATIONAL L ABORATORY U.S. D EPARTMENT OF E NERGY Muon Collider-Neutrino Factory Collaboration.
High Power Hg Target Conceptual Design Review Hg Target System Cost Estimate V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February.
CERN Hg Jet System V.B. Graves P.T. Spampinato T.A. Gabriel MUON Collaboration Meeting Lawrence Berkeley National Laboratory February 16, 2005.
Mercury Nozzle Status V.B. Graves Hg Jet Design Meeting Princeton University Nov 15, 2004.
High Power Hg Target Conceptual Design Review Hg Target System Controls V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February.
High Power Hg Target Conceptual Design Review Hg Target Design P.T. Spampinato V.B. Graves T.A. Gabriel Oak Ridge National Laboratory February 7-8, 2005.
N UCLEAR S CIENCE AND T ECHNOLOGY D IVISION O AK R IDGE N ATIONAL L ABORATORY U.S. D EPARTMENT OF E NERGY Muon Collider-Neutrino Factory Collaboration.
KT McDonald Muon Collider 2011 June 28, The Target System Baseline K. McDonald Princeton U. (June 28, 2011) Muon Collider 2011 Telluride, CO More.
MERIT Hg System Final Design Review Hg Target System Design V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science & Fusion.
MERcury Intense Target (MERIT) Overview Van Graves, ORNL Syringe Procurement Kickoff Meeting Airline Hydraulics Bensalem, PA Oct 28, 2005.
Hg System Status V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting October 20, 2006.
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
High Power Hg Target Conceptual Design Review Hg Target Interface with Solenoid V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory.
1Managed by UT-Battelle for the U.S. Department of Energy NMFCC Friday Meeting 10 Apr 2009 Neutrino Factory Nozzle Layouts V.B. Graves NFMCC Friday Meeting.
IDS-NF Target Studies H. Kirk (BNL) July 8, 2009.
Hg System Decommissioning V.B. Graves P.T. Spampinato CERN Feb 7-8, 2008.
High Power Hg Target Conceptual Design Review Design Requirements, Interfaces, and Schedule P.T. Spampinato V.B. Graves T.A. Gabriel Oak Ridge National.
Target System Operations and Hg Handling P.T. Spampinato V.B. Graves MERIT Hg System Safety Review CERN June 19-20, 2006.
High Power Hg Target Conceptual Design Review Equipment Installation at CERN V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February.
1Managed by UT-Battelle for the U.S. Department of Energy NF Splash Mitigation 12 July 2011 Neutrino Factory Mercury Pool Splash Mitigation V.B. Graves.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
Mercury Chamber Considerations V. Graves IDS-NF Target Studies July 2011.
Water Tests of Hg System V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting Dec 8, 2006.
Target Design Meeting Nozzle & Hg Collection Tests, Design Requirements, Instrumentation, Containment, Windows, Diagnostics, Controls, Base Support Structure,
Hg Delivery System Fabrication Status V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting May 5, 2006.
HYSPEC Instrument: Status and Performance M. Hagen Neutron Facilities Development Division, SNS, Oak Ridge National Lab. W.J. Leonhardt and A. Ruga Condensed.
IDS-NF Mercury System Overview Van Graves IDS-NF 5 th Plenary Meeting April 9, 2010.
NTOF11 Collaboration Meeting Non-Design Issues for the Mercury Jet Target P.T. Spampinato V.B. Graves T.A. Gabriel Princeton University April 29-30, 2005.
Summary of Hg System Review at CERN Van Graves 13 Sep 2005.
Can Thermal Reactor Recycle Eliminate the Need for Multiple Repositories? C. W. Forsberg, E. D. Collins, C. W. Alexander, and J. Renier Actinide and Fission.
Oak Ridge Regional Emergency Management Forum David Milan Manager, Emergency Preparedness Department Pollard Auditorium October 26, 2006 Oak Ridge National.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1 SNS 2 Meeting Opening Remarks, Purpose Glenn R. Young Physics Division, ORNL August 28,
DOE Nanoscale Science Research Center Workshop: Enabling the Nanoscience Revolution Renaissance Hotel Washington, D.C. February 26-28, 2003.
MERIT Hg System Final Design Review Hg Target System Controls V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science &
Stepper Motor Control, PLC vs VME Herb Strong, Pam Gurd Spallation Neutron Source Oak Ridge National Laboratory October 17, 2007.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Modeling Electron and Spin Transport Through Quantum Well States Xiaoguang Zhang Oak Ridge.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1 GRAPHITE SUBLIMATION TESTS with Inert Gas Mitigation C. C. Tsai, T. A. Gabriel, J. R.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1 Ideas on a Framework and Methods for Estimating the Benefits of Government- Sponsored.
Fire Hazards Analysis the ORNL Approach Jeff Sipes Fire Protection Engineer April 17, 2007.
OPTICAL TOOLING Survey & Alignment. O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 2 Title_date OPTICAL INSTRUMENTATION AND TERMINOLOGY.
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
XAL based PV Browser Jeff Patton, Chris Fowlkes EPICS Collaboration Meeting – RDB SIG June 12, 2006.
Neutrino Factory Target Vessel Concept Update V. Graves Target Studies EVO June 12, 2012.
Neutrino Factory Target Cryostat Review (Update Aug 12) Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
Windows Version 3.1
Neutrino Factory Mercury Catcher Concept
V.B. Graves Hg Jet Design Meeting Princeton University Nov 15, 2004
Mercury Catcher Status
WARNING WARNING WARNING WARNING WARNING WARNING WARNING WARNING
Presentation transcript:

Mercury Catcher Status V.B. Graves Hg Jet Design Meeting Princeton University Nov 15, 2004

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Hg Jet Design Meeting – 15 Nov 2004 Hg Catcher Design  Purposes  Receive 20m/s Hg jet after beam interaction  Redirect flow out of primary tube  Minimize (or eliminate) any backsplash toward upbeam end  Considerations  Tilted solenoid puts roof of primary very near Hg jet path  Jet and beam paths nearly parallel at downbeam end  Jet may not be well-formed after beam interaction  Primary containment windows cannot withstand Hg jet impact

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Hg Jet Design Meeting – 15 Nov 2004 Current Catcher Concept  Deflector welded to primary containment tube  Leading edge positioned upstream of potential impact location  Smooth flow redirection out of primary tube directly into sump tank  Acts as a SS beam window  What thickness is allowable?  Assumed that imparted beam energy will not be heat issue  Assumed that windows need exposure to primary containment environment – true?  Would like to incorporate design into Princeton jet tests