Water vapour spectroscopy in the MSF Dr Robert McPheat CAVIAR Progress Meeting NPL 02/06/2008.

Slides:



Advertisements
Similar presentations
TAFTS: Comparing Uncertainties in Atmospheric Profiles with the Water Vapour Continuum Ralph Beeby, Paul Green, Juliet Pickering, John Harries.
Advertisements

Progress in water vapour spectroscopy at RAL Dr Robert McPheat CAVIAR Progress Meeting UCL, 13/05/2010.
Progress in water vapour spectroscopy at RAL Dr Robert McPheat CAVIAR Annual Meeting Imperial College, 16/12/2008.
1 Water vapour self-continuum in windows: Processing the recent MSF RAL measurements Igor Ptashnik University of Reading CAVIAR semi-annual meeting
Current CAVIAR activities at Cambridge A.J.L. Shillings and R.L. Jones 1 University of Cambridge, Department of Chemistry, Lensfield Road, Cambridge, CB1.
CAVIAR meeting May, 13, 2010 – UCL, London 1/11 Cambridge Centre for Atmospheric Science Broad Band Cavity Enhanced Absorption Spectroscopy of the Water.
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Operating Nitrox Systems 11 Presented by Nuvair. Operating Nitrox Systems2 Membrane systems produce nitrox efficiently Compressed air flows through the.
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
I.C. ENGINES LECTURE NO: 14 (5 May 2014).
Yu. I. BARANOV and W. J. LAFFERTY Optical Technology Division Optical Technology Division National Institute of Standards and Technology, Gaithersburg,
Vacuum Fundamentals High-Vacuum Technology Course Week 8 Paul Nash HE Subject Leader (Engineering)
Heating and cooling BADI Year 3 John Errington MSc.
Test Cryostat, OGSE and MGSE PACS IHDR: MPE 12/13 Nov 2003 AIV1 PACS Test Cryostat, OGSE and MGSE Gerd Jakob MPE.
CAVIAR water vapour laboratory FTS measurements Dr Robert McPheat CAVIAR Meeting Cosners’ House, 15/12/2009.
Update on the Leicester lab studies (WP2.2 cavity ringdown spectroscopy) Stephen Ball & Simon Neil (Leicester University) CAVIAR science meeting, NPL,
1 MICE Absorber working group Columbia, 13 June 2003 MICE Hydrogen System. Preliminary HAZOP. Elwyn Baynham, Tom Bradshaw and Iouri Ivaniouchenkov,
David Paynter, Igor Ptashnik, Keith Shine Department of Meteorology University of Reading Kevin Smith (RAL) June 2006 Pure water vapor continuum measurements.
FASSST Cavity Ringdown Spectroscopy of Atmospherically Broadened Lineshapes in the Millimeter Spectral Region Corey Casto Frank C. De Lucia The Ohio State.
1 CAVIAR meeting in NPL 2 June 2008 Water vapour continuum in near-IR band centres: Recent RAL measurements, results and problems I. Ptashnik & K. Shine.
Progress in water vapour spectroscopy at RAL Dr Robert McPheat CAVIAR Progress Meeting Cosners’ House, 14/12/2009.
Progress in water vapour spectroscopy at RAL Dr Robert McPheat CAVIAR Progress Meeting NPL, 29/09/2010.
Progress in water vapour spectroscopy at RAL Dr Robert McPheat CAVIAR Progress Meeting University of Leicester, 24/09/2009.
MICE Hydrogen System Design Tom Bradshaw Iouri Ivaniouchenkov Elwyn Baynham Columbia Meeting June 2003.
Weather and Climate.
Lesson 7 Steam Power Plant.
Photoelectron Spectroscopy Lecture 5 – instrumental details –General spectrometer design –Vacuum generation and measurement.
Objective Learn about Cooling and Cooling systems Define heat pump Learn about energy storage systems.
The Cooling System.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Effective lens aperture Deff
PHENIX UPGRADE Stony Brook Project Hadron Blind Detector Glove Box 31Aug05.
Section 703 Apparatus Inspection. Procedures The driver/operator should follow a systematic procedure for inspecting apparatus This ensures that all important.
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only.
Wood Preservation. Timber needs to be protected from:  Insects and fungi  Wear and tear  Effects of weathering Main types of preservatives:  Tar oils.
Managed by UT-Battelle for the Department of Energy Polarized 3 He Filling Stations Xin Tong (Tony) Instrument Development Group Neutron Facilities Development.
Comparison of Experimental and Theoretical Cross-sections of PFBAm By: Paul J. Godin, Stephanie Conway, Angela Hong, Karine Le Bris, Scott Mabury, and.
Safety Talk 3 / 1 Safety Talk 3 Safe Operation of Storage Tanks: Temperature and Pressure.
Misure ottiche su atmosfere planetarie in laboratorio
Precipitation Type: __________________ Amount: ________________ Name_________________ Date__________ Temperature High: __________________ Low: ________________.
Monday – VSP Room weekly checks Visually Check: Hvac system for leaks & valve settings Fresh water system for leaks & valve settings VSP linkage Autopilot.
Concept of Humidity What is the relationship between water vapor holding and temperature? Air hold more water vapour at higher temperature.
Beamline AILES : Mid IR to THz Spectroscopy The AILES Infrared and THz High Resolution Spectroscopy beamline at SOLEIL (Saclay, 30 km south of Paris) –
The Cooling System.
Elimination of the Vacuum Pump Requirement for High Resolution Rotational Spectroscopy Jennifer A. Holt Ryan Daly Christopher F. Neese Frank C. De Lucia.
Progress in water vapour spectroscopy at RAL Dr Robert McPheat CAVIAR Progress Meeting Cambridge, 19/02/2011.
Vacuum Studies of LHCb Vertex Locator Sensors Gwenaëlle Lefeuvre, Ray Mountain, Marina Artuso Department of Physics, Syracuse University Abstract : The.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
CEDAR MECHANICS Liverpool Conceptual Design (Subject to funding from STFC) 1 CEDAR Mechanics Conceptual Design.
Reaction Monitoring with ReactionView ® and ReactionProbe™ In-situ contamination and surface analysis with SpotView and SpotView-SL © Remspec Corp
Chapter 39 Cooling System Fundamentals.
H.-G. Moser, PXD Workshop, Valencia, January 2016 IBBelle for VXD 1 Use one unit first Assemble on a platform which fits in a 20’ container No redundancy.
3. Climate Control Systems Service Automotive – Heating & Air Conditioning Topics covered in this presentation: Gauge set and refrigerant Service ports.
Automotive Engines Theory and Servicing
Heat Transfer and Refrigeration Cycle
Climate Control Systems Service
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Heat Transfer and Refrigeration Cycle
Date of download: 10/23/2017 Copyright © ASME. All rights reserved.
High resolution far-IR spectroscopy of HFC-134a at cold temperatures
COMPONENTS OF SOLAR WATER HEATER
Liquid Gasket Suported by.
Module 3 Domestic Heating/MMA Welding
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
Recirculating CO2 System
TEMP MEASURING INSTRUMENTS
Wednesday, 9/7 Day 2 2- Fill out your Agenda. Science Starter:
The Heat Pump-pumps heat from a cold area to a warmer area.
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
Then cut lines (top sheet only!)
Presentation transcript:

Water vapour spectroscopy in the MSF Dr Robert McPheat CAVIAR Progress Meeting NPL 02/06/2008

SPAC Short path-length absorption cell (SPAC) –1.2 to 20 metres –Multi-pass reflective optics (White) –Being upgraded for CAVIAR -200 to 200ºC temperature range 5 bar maximum pressure No cold spots (including valves, feedthroughs etc.) Mirrors adjustable from outside Accurate temperature & humidity measurement Corrosion resistant Made first measurements Problems with thermal expansion –Can be used for hot measurements

SPAC upgrade OpticsInnerCooling Jacket

High temperature pressure gauge & filling line Temperature & pressure logging Temperature control Outer vacuum jacket Transfer optics vacuum tank Detector box

SPAC upgrade modifications

Second High Resolution Spectrometer Bruker IFS120 HR Upgrade –Upgraded electronics / moving mirror to same specification as IFS125 –Maximum spectral resolution of cm -1 –Spectral range of 10 to 40,000 cm -1

LPAC Vacuum Upgrades Replace unreliable pumps & gauges (dating from early 1970s) Oil free to avoid contamination –3 large dry pumps –1 dry backing pump –6 new gauges

Future Work Measurement of unsaturated strong lines Finish SPAC modifications –Measurements covering visible to FIR Need window & detector box modifications for FIR –Up to 450 K LPAC vacuum upgrade –Measurement conditions –243K to 293K –water pressures up to 0.75 SVP –resolution up to possible cm -1 but mainly at 0.03cm -1 –water/air mixtures at total pressures of 150, 500 & 1000 hPa