XMM-Newton 1 Maria Santos-Lleo Science Operations Status EPIC Ops-Cal Meeting April 8, 2008, Mallorca María Santos-Lleó (XMM-Newton Science Support Manager)

Slides:



Advertisements
Similar presentations
SADC Regional Science, Technology and Innovation (STI) policy review and Statistics meeting Republic of Zambia Ministry of Science, Technology and Vocational.
Advertisements

XMM-Newton 1 Matthias Ehle - SCI-OAX EPIC BGWG Meeting#6 November 5 th, 2007 BGWG Report from the June XMM-Newton User Group Meeting Matthias Ehle.
XMM XMM-NEWTON TTD Meeting: 8 April OPS-OAX (J. Martin) Autocommanding J.Martin, XMM-Newton SOE.
XMM EPIC MOS Jenny Carter EPIC Background, Operations and Calibration Mallorca, March/April 09 Jenny Carter, University of Leicester.
XMM EPIC MOS Jenny Carter 4 th EPIC BG WG Meeting Mallorca, 25/10/06 BGWG blank sky data analysis Jenny Carter, University of Leicester.
WORK PLAN FOR THE EPIC CALIBRATION TEAM (AND BEYOND)
10 July Yohkoh Galileo: To Infinity! … and Beyond! Lockheed Martin’s Role in the Yohkoh Galileo Project 10 July 2002.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
XMM 1 EPIC MOS Monitoring CAL/OPS Meeting MPE
XMM-Newton 1 Michael Smith, ESAC PN Monitoring MPE, May 2006.
XMM EPIC MOS Steve Sembay ESAC 04/10/05 Implementation of the MOS spatial/temporal DRM: Does it work ? Zeta Puppis: Checking the line.
MPE, 4th of May 2006 Page 1 XMM-Newton Status of EPICs Operations Stéphane RIVES 4th of May 2006.
XMM-Newton 1 Maria Santos-Lleo Science Operations Status EPIC Ops-Cal Meeting November 6, 2007, Mallorca María Santos-Lleó (XMM-Newton Science Support.
XMM EPIC MOS Andy Read 2 nd EPIC BG WG Meeting MPE, Germany 24/11/05-25/11/05.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Palermo, April 2007.
Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton EPIC SW Status Guillermo Buenadicha TOS/OFX, SOC Operations Support Group MPE, 4 th.
XMM-Newton 1 M.Stuhlinger/M.Smith, ESAC PN Monitoring Mallorca, November 2007.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Marcus G. F. Kirsch Mallorca, Summary status of the EPIC calibration.
XMM-Newton Status of EPIC Operations Guillermo Buenadicha & Pedro Calderón Mallorca 8-April-2008.
XMM-Newton 1 M.Stuhlinger/P.Calderon, ESAC Re-appearance of the MOS1 CCD1 meteorite column during revs Madrid, 23. March 2010.
XMM-Newton 1SCI-SA Status of MOS and PN Realtime Operations 1) Current Operations Status 2) Eclipse preparation improvements 3) Slew Exposures 4) Offset.
MOS 3x3 mode slow slew survey Richard Saxton October 2006.
XMM 1 MOS2 CCD5 anomaly Status of the investigations.
I. de la Calle Astronomy Science Operations Division Science Operations Department Background Working Group Meeting, Mallorca – 30/03/2009 XMM-Newton ESAC.
EPIC TTD#14 SCIENCE OPERATIONS Mallorca, 01 February 2005 L. Metcalfe SCI-SDX Science Support Manager 1 Science Operations & Data Systems Division Research.
Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Pedro Calderón Riaño Guillermo Buenadicha.
EPIC TTD#16 SCIENCE OPERATIONS MPE, 04 May 2006 L. Metcalfe SCI-SDX XMM-Newton Science Support Manager 1 Science Operations & Data Systems Division Research.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Cross calibration PKS
Slews: Fast and Slow. Fast Slew Status  XMMSL1: catalogue of slew sources released May 2006 Revs , 5180 detections, 2692 Revs , 5180 detections,
XMM EPIC MOS Jenny Carter 3 rd EPIC BG WG Meeting MPE, Germany 02/05/06 Blank sky data analysis Jenny Carter, University of Leicester.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, October 2006.
XMM EPIC MOS Andy Read EPIC CAL/OPS Meeting Mallorca, Spain 26-27/10/06 EPIC BGWG XMM-Newton EPIC BackGround Working Group founded.
Mallorca, 1st of February 2005 Page 1 XMM-Newton Status of EPICs Operations Stéphane RIVES 1st of February 2005.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC XMM-Newton Instrument Anomaly Tool & Cross-Calibration Tool Marcus G. F. Kirsch.
XMM 1Michael Smith, ESAC EPIC PN Monitoring Provided by Michael Smith.
The XMM slew survey: status and future Richard Saxton, Andrew Read, Michael Freyberg, Bruno Altieri.
Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.
EPIC Calibration Meeting, K. Dennerl VILSPA/Spain, 2004 March Detector noise & Vela observations application to Vela observations EPIC pn detector.
Page 1 ACTIONS EPIC_10/1 on Munoz. EPIC_10/1 on Munoz. –Closed: MS delivered Slew Data Files  EPIC_10/2 on Smith: to verify whether PHS_tools checks for.
XMM 1 EPIC MOS Monitoring CAL/OPS Meeting Mallorca
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Energy calibration refinement of the EPIC-pn Burst mode M.G.F. Kirsch 1, E.
1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton Ops. AGENDA Operations status and.
Martin Stuhlinger X-Ray Universe 2005, Sep.26-30, 2005 European Space Astronomy Centre Page 1 XMM-Newton ESAC Status of XMM-Newton cross-calibration with.
Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Guillermo Buenadicha PALERMO 11/04/07.
XMM 1 EPIC MOS Monitoring. XMM-Newton 2 Martin Stuhlinger, ESAC MOS Bad Pixel Monitoring.
GLAST LAT Project 1S. Ritz Purposes of the Data Challenges “End-to-end” testing of analysis software. –define the ends –define the tests (what is success?)
XMM EPIC MOS Andy Read EPIC CAL/OPS Meeting MPE, Germany 04-05/05/06 EPIC BGWG XMM-Newton EPIC BackGround Working Group founded (~1.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Long term EPIC in-orbit calibration plan Marcus G. F. Kirsch.
Science Operations Status Maria Santos-Lleo EPIC cal & ops meeting, Madrid March, 2010.
XMM-Newton EPIC OCB, 6-Nov-2007 EPIC OCB, 6-Nov XMM-Newton Future Instrument Operations Mallorca, 6 th -7 th November 2007 M. Casale, J.R. Muñoz.
RGS/MOS-cooling Results February 03, 2003 L. Metcalfe 1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton.
XMM EPIC MOS Andy Read OPS/CAL/BG (OCB) Meeting Mallorca, Spain 05-07/11/07 Report from the BGWG (05/11/07) Andy Read, on behalf.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
EPIC Calibration Meeting, Madrid Correcting spatial inhomogeneities of the absolute energy scale K. Dennerl, 2010 March 23 Correcting spatial inhomogeneities.
LSST Scheduler status Francisco Delgado Sr. Software Engineer Telescope & Site.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
A look at XMM slew data Richard Saxton, Andrew Read, Michael Freyberg, Bruno Altieri, Puri Munuera.
GLAST Science Support CenterNovember, 2005 GSSC User Committee Meeting Tools for Mission and Observation Planning Robin Corbet, GSSC
Swift HUG April Swift data archive Lorella Angelini HEASARC.
XMM 1Norbert Schartel Report From The Project Scientist Presentation for the XMM-Newton Users Group Meeting VI 19 th / 20 th May 2005 Norbert Schartel.
M. Pilar Esquej, XMM-Newton European Space Astronomy Centre Page 1 Status of the XMM-Newton Slew Survey P. Esquej, R. Saxton, B. Altieri, A. Read, M. Freyberg,
The Slow Slew Survey Richard Saxton / Pedro Rodriguez November 2006.
Status of EPIC operations Pedro Calderón Riaño, ESAC Leicester BOC meeting 6-8 March 2012.
1 SUZAKU HUG 12-13April, 2006 Suzaku archive Lorella Angelini/HEASARC.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, April 2008.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Annual Report of the DWP Experiment 9th CAA Operations Review
XMM-Newton slew sources A quick analysis
Presentation transcript:

XMM-Newton 1 Maria Santos-Lleo Science Operations Status EPIC Ops-Cal Meeting April 8, 2008, Mallorca María Santos-Lleó (XMM-Newton Science Support Manager)

XMM-Newton 2 Maria Santos-Lleo Contents  SOC moves  Science program: AO6, AO7 & AO8  Instrument operations (with inputs from M.Casale)  Science operations: new mode for EPIC  Next SAS release, version 8  Next XSA release, version 5.0, and slew catalogue update  Users feedback: UG recommendations  Symposium: The X-ray Universe 2008

XMM-Newton 3 Maria Santos-Lleo SOC moves …  EPIC Calibration Scientist: ● Marcus Kirsch: re-asigned to the MOC as SOE ● Matteo Guainazzi: new Calibration Scientist  Mission Planning and Community Support ● Michel Breitfellner left on February 29 ● Ignacio de la Calle: started on January 2008 (25% time: EPIC) ● Nora Loiseau: XMM-Newton Archive Scientist

XMM-Newton 4 Maria Santos-Lleo Science Program  AO6, May April 2008: status as of 4 April ● A+B performed: ks: 95% ● C: 1445ks: 19% (27-31% in last two AOs)  AO7, May 2008 – April 2009 ● Second phase ended February 8 ● Enhancement almost done (90%) ● Long term plan is underway  AO8 call: 26 August – 10 October, 2008

XMM-Newton 5 Maria Santos-Lleo Instrument Operations  Inscon phase-down ● Reducing slowly since December 2007 ● After 31 March 2008: no INSCON ● One “Data Aide” (0.5fte) as per 1 Feb off line: assessment of science images and operational history populate the OLB assemble a weekly report for the MOC, detailing operational issues …  Engineering Support to the MOC on Instrument operations: provided as of 01/12/07 by the SOC Operations Support Group (with a prime and a backup mobile phones)  Spacon team: at present still 10 people (out of 12) (because Herschel launch was delayed)

XMM-Newton 6 Maria Santos-Lleo Instrument Operations (II)  Delayed reaction to radiation alerts (max 30m): Rev 1471, 1486, 1487  EPIC temperature excursion in Rev-1489 (27/01/08): The CCD temperature increased to -75 C for PN and -52 C for MOS. ● Reason: initial TC failure due to Configuration Control problem at the MOC following the installation of a Control System SW patch ● Impacts: a close_cal observation of 50 Ksec for both MOS and PN showed no noticeable effect.  MOS instruments exposed to radiation in Rev 1519 (26/03/08) for about 3.5 hours: no alarm was triggered at the MOC. ● The MOS instruments: closed later (Rad Mon Warning Flag) ● Reason: incorrect LELA re-connection, following a communication line test that affected the NCTRS / LELA setup.

XMM-Newton 7 Maria Santos-Lleo Instrument Operations (III)  Incorrect rejoining of PN instruments into the Timeline: Offset calculation was skipped and tables in memory (applicable to close_cal) were used. ● Occurred twice: in Rev-1508 (03/03/08) & 1522 (31/03/08). ● Reason: procedure not correctly followed  Corrective actions ● Auto-commanding function should alleviate the Spacon load and increase safety. Validation is still on going (many bugs found and fixed) ● Supplement of Spacon training ● Optimization / simplification of procedures ● Automatic monitoring (with alarms) of the LELA health status and performance through the XMCS

XMM-Newton 8 Maria Santos-Lleo Science operations new EPIC mode: mosaic  EPIC: action from UG: /14: On the EPIC team to report on the impact of reducing the overhead for EPIC-pn thin, medium and thick filter exposures in modified mosaicing mode, by using a fixed offset table: Closed  Sky regions ~ few degrees with exposure times ≤ few 10ks: ● Sequence of pointings, EPICs always in FF ● Pn Offset: only 1 st exposure: 100 fr & closed fl. (PI team rec.) ● Different pointings: 0.’2≤d≤1º (close-loop slew), same filter ● X-ray instruments: continuously taken data, even during slews ● “Overhead” due to re-pointing ~ 1000 s → min exp-time 1500s

XMM-Newton 9 Maria Santos-Lleo EPIC mosaic: sample exposure maps 5x3 individual pointings with different angular offsets

XMM-Newton 10 Maria Santos-Lleo EPIC: true color images Pipeline production of EPIC true color images Work in progress XMM-SOC- USR-TN-16

XMM-Newton 11 Maria Santos-Lleo SAS & XSA  SAS 8.0 to be ready on May 20 ● Rgs wavelength grid, epic_lccorr, epfast, eslewchain, 2D PSF ● Final SAS build: April 23  XSA 5.0 due to spring-summer 2008 ● Mainly OM updates ● OM catalogue ● 2XMM catalogue update  Slew Catalogue update (Delta-2) ● Slews and , 8000 □ ● Total: □, 7700 sources (780 hard), 30% sky ● Public in XSA by May 2008 (TBC)

XMM-Newton 12 Maria Santos-Lleo Users FeedbacK: UG recommendations  Recommendation /39: The priority for timing modes of EPIC-pn needs to be focused on solving the current problems of the timing and burst calibration. Only after they are fixed, the UG would be glad to revise its recommendation about the modified timing. For the time being, the modified timing mode should only be made available on a case by case basis (Policies and Procedures updated for AO7)  Recommendation /45: The UG recommends that the Background Working Group makes a study of the needs for closed filter data

XMM-Newton 13 Maria Santos-Lleo The x-ray Universe 2008  Granada, May 2008  Early registration deadline: April 18  Program to be announced: ~ April 14  (UG: 6-7 May, 2008)  Proceedings of ‘The Next Decade’ workshop (ESAC 2007): Published in AN 329, Feb 2008, and sent to participants

XMM-Newton 14 Maria Santos-Lleo …Thanks !