22 May 2008Lynn Baker USSKA Consortia Meeting Washington, DC1 Project Manager, Responsibilities and Tasks –Coordination between groups within the TDP –Promote.

Slides:



Advertisements
Similar presentations
Square Kilometre Array (SKA) Project PRE-CONSTRUCTION PHASE Briefing for Industry & Science Organisations Tuesday 14 th August Wellington.
Advertisements

WENJIN ZHOU, PH.D. COMPUTER SCIENCE AND ENGINEERING WHAT I LEARNED FROM NSF CONFERENCE.
Antennas for MeerKAT March TDP AWG, 13-14/3/08, San Francisco MeerKAT Semantics K.A.T. = Karoo Array Telescope –KAT is Afrikaans for cat –MeerKAT:
ENROLLMENT GROWTH TASK FORCE December 17, COMMITTEE MEMBERS Co-Chairs – Greg Key and Dan Burcham THANK YOU  Maude Bigford  Sandy Britton  Matt.
5-6 May 2009 AWG Meeting LAX1 Technology Development Project US contributions to global.
Proposal Writing Workshop Features of Effective Proposals: Fellowship Track Washington, DC January 9, 2014.
ICS Management Poor management is the downfall of many software projects Software project management is different from other engineering management.
TDP activities in calibration and processing Athol Kemball for TDP Calibration & Processing Group (CPG) Department of Astronomy, University of Illinois.
US Technology Development Project for the SKA Jim Cordes AWG Meeting March 2008, San Francisco SKA Context TDP work plan Constraints and considerations.
US SKA TDP Hydroforming Production Cost Rev B 12m Primary & Support Structure US SKA Antenna Working Group Meeting May 7, 2009, Los Angeles, California.
Goals of DVA-1 Meeting Overall goal: build an SKA antenna with SKA feeds/receivers, verify performance and fabrication/costs for the next stages of the.
ALTERNATIVE MECHANICALS DVA1 Meeting at NSF Arlington VA April 15-16, 2010 Matt Fleming Contributions from Jack Welch Roger Schultz Gordon Lacy.
TDP calibration and processing group (CPG): activities and status Athol Kemball (for CPG) University of Illinois at Urbana-Champaign
The Frequency Agile Solar Radiotelescope Current Status & Plans T. S. Bastian NRAO.
UCLC Meeting UCLC Raison d’etre Steps to proposal (Oct 15 submission) Plans for Today Ritchie Patterson June 30, 2002.
SKA TDP Advisory Committee Report to US SKA Consortium, 17 November 2008, Madison Trish Henning.
22 May 2008 Jim Cordes US SKA Consortium Meeting Washington, DC1 Technology Development Project Presentation TDP OverviewJim Cordes »Programmatics »International.
Marco de Vos Summary, Conclusions & ActionsAAVP 2010 Summary, Conclusions and Actions Marco de Vos
Concepts for PEER Center going forward Jack Moehle.
Baseband processing, e-VLBI, and SKA simulations Steven Tingay Swinburne University of Technology MNRF Symposium, 8 June, 2004.
Dominion Radio Astrophysical Observatory DVA-1 Reflector Development Timeline Gary Hovey NRC-HIA Dominion Radio Astrophysical Observaotry.
CURRENT SKA TDP ANTENNA DESIGN 10 DVA1 Meeting at NSF Arlington VA April 15-16, 2010 Matt Fleming Contributions from Jack Welch Roger Schultz Gordon Lacy.
Receiver TDP Report to US SKA Consortium May 22, 2008 Sandy Weinreb, Joe Bardin, Glenn Jones, and Hamdi Mani California Institute of Technology
US SKA TDP Antenna Specification Structural Mechanical Rev B US SKA Antenna Working Group Meeting May 7, 2009, Los Angeles, California Matt Fleming Contributions.
SKA TDP & CART 15m (DVA-1) ANTENNA DESIGN 11 US SKA Consortium Meeting at Arlington VA June 3-4, 2010 Matt Fleming Contributions from Jack Welch Roger.
National Astronomy and Ionosphere Center © Germán Cortés M 2008 SKA TDP Antenna Optics By Germán Cortés M. Cornell University Ithaca NY 14853, USA National.
© 2003 Popkin Software & Systems Inc. TOGAF Tool Support Briefing – System Architect Matt Smith, Architecture Consultant © 2003 Popkin Software & Systems.
America Connects to Europe (ACE) and TransPAC3 (TP3) James Williams Director, International Networking Jim Williams -
U.S. Decadal Survey Process Disclaimer: I am one of many participants; it’s complicated; and others involved should speak up. Committee Members: Roger.
DVA Series Work Flow P. Dewdney Apr 15, SPDO DVP Work Flow 2 DVA-1 CPG.
America Connects to Europe (ACE) and TransPAC3 (TP3) James Williams Director, International Networking
SKA Introduction Jan Geralt Bij de Vaate Andrew Faulkner, Andre Gunst, Peter Hall.
Transition from SKADS to PrepSKA Richard Schilizzi Lisbon, 3 October 2008.
An African VLBI network of radio telescopes as an SKA precursor Michael Gaylard Hartebeesthoek Radio Astronomy Observatory (HartRAO) P. O. Box 443, Krugersdorp.
Rosie Bolton1 SKADS Costing work 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKADS Costing work: Spreadsheets to scalable designs Rosie Bolton Dominic.
US SKA TDP DVA-1 June 28-29, 2012Dish Verification Antenna No. 1 Critical Design Review, Penticton, BC Overview Of DVA-1 Optics Lynn Baker Bill Imbriale.
Proposed Versatile 1.2 to 14 GHz Radio Telescope Receiver S. Weinreb, JPL/Caltech, Draft July 5, 2005 Contents 1.Introduction and intended applications.
2 nd convergence workshop: introduction R. T. Schilizzi Penticton 22 July 2004.
Primary Beam Shape Calibration from Mosaicked, Interferometric Observations Chat Hull Collaborators : Geoff Bower, Steve Croft, Peter Williams, Casey Law,
SKA Dishes, CSIRO February 2013 SKA Dish Verification Antenna #1 Gary Hovey Astronomy Technology Program – Penticton 12 February 2013.
SKA DRAO SKA success dependent on technology development –major improvements in price/performance Survey Speed -> (A eff / T sys ) 2 x Field of View.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
Australian SKA Pathfinder (ASKAP) David R DeBoer ATNF Assistant Director ASKAP Theme Leader 06 November 2007.
June 3,4 2010Lynn Baker USSKA Consortia Washington, DC1 TDP / AWG Update Lynn Baker USSKA Consortia Meeting Washington DC June 3,4, 2010.
Summary of the Paris SKA Meeting 4-8 September 2006 R. T. Schilizzi.
End-to-End Performance Initiative March 9, 2001 Internet2 Spring Member Meeting.
The North America Array Technology Development and the Realization of the SKA-High Steven T. Myers & Jim Ulvestad NRAO 15 Oct 2009 USSKA Consortium Meeting.
Brian Cronin Federal Transit Administration ITSA Annual Conference May 4, 2005 Mobility Services for All Americans (MSAA) Foundation Research and Next.
US SKA TDP Antenna Design Progress US SKA AWG Meeting May 6, 2009, Los Angeles. California Matt Fleming Contributions from Jack Welch Roger Schultz Sandy.
Project Management Plan. Project Organisation DVA-1 Board n One member for each stakeholder n Oversees execution of DVA-1 on time and within budget n.
Planetary Data System (PDS) Tom Morgan November 24, 2014.
Grid as a Service. Agenda Targets Overview and awareness of the obtained material which determines the needs for defining Grid as a service and suggest.
6 May 2009Lynn Baker AWG Meeting LA1 TDP Antenna and Feed Plan Lynn Baker Antenna Working Group Meeting Los Angeles, CA May 6, 2009.
Alessandra CiocioCSAC meeting - January 11, MRC Report Status Schedule.
17 November 2008Lynn Baker US SKA Consortia Meeting Madison WI1 TDP Activity Report Lynn Baker US SKA Consortia Meeting Madison, Wisconsin November 17,
The North America Array Technology Development and the Realization of the SKA-High Steven T. Myers NRAO 14 May 2009 USSKA Consortium Meeting Washington,
RDA Plenary 5 Big Data (Analytics) IG Session
S4 will be a “big” Collaboration:
NGVLA Science Workshop, Socorro NM June 26, 2017
Wideband Single Pixel Feeds
Need for the ATA SKA Development Facility
Jim Cordes Cornell University
Reflector & Single Pixel Feed Panel Discussion
VLA to EVLA Transition Plan
DVA1 as Part of the Dish Verification Program (DVP) Washington, DC P
A Draft Funding Model for the SKA
DVA-1 Baseline Optical Design
EVLA Construction Status
Optical cameras (NIRST- HSC) plus DCS & ROSA
Agenda, Day 1, Tuesday, June 19
Presentation transcript:

22 May 2008Lynn Baker USSKA Consortia Meeting Washington, DC1 Project Manager, Responsibilities and Tasks –Coordination between groups within the TDP –Promote and facilitate communication among separated groups –Assist coordination between TDP and PrepSKA –Promote collaboration between TDP and other research groups –Develop project planning documentation –Assist with reporting requirements to the NSF, PrepSKA, others –Provide a central repository for reports & minutes, web based –Oversight of budgets, schedules, project performance –Engineering responsibilities, especially antennas

22 May 2008Lynn Baker USSKA Consortia Meeting Washington, DC2 TDP Participation (to date) Direct TDP Funding: Caltech Cornell/NAIC MIT/Haystack SETI Institute U.C. Berkeley U. Illinois Management: Cornell/NAIC US SKA Consortium In-kind participation: JPL NRL NRAO U. New Mexico ATNF DRAO U. Calgary South Africa

22 May 2008Lynn Baker USSKA Consortia Meeting Washington, DC3 TDP Antennas Working Group Jack Welch (UCB) Chair Matt Fleming (Minex/SI) German Cortes (Cornell) Dean Chalmers (DRAO) Bill Imbriale (JPL) Roger Norrod (NRAO) Roger Schultz (Schultz Associates) Sandy Weinreb (Caltech) External: –Dave de Boer (ATNF/ASKAP) –Peter Dewdney (DRAO/SPDO) –Justin Jonas (MeerKAT) or proxy

22 May 2008Lynn Baker USSKA Consortia Meeting Washington, DC4 TDP Calibration and Processing Group Athol Kemball (UI, Chair) Geoff Bower (UCB) Jim Cordes (Cornell) Joe Lazio (NRL) Colin Lonsdale (MIT/Haystack) Steve Myers (NRAO) Joeren Stil (U. Calgary) Greg Taylor (UNM)

22 May 2008Lynn Baker USSKA Consortia Meeting Washington, DC5 TDP Project PathfindersPrepSKA AWGCPG Technological Interactions

22 May 2008Lynn Baker USSKA Consortia Meeting Washington, DC6 Interaction between AWG and CPG –Science data products result from CPG modeled algorithms –CPG results define the required antenna specifications –AWG provides feasibility and cost models of specifications –Rescoping of science goals leads to multiple antenna options –Early AWG work will focus on low cost design and fabrication

22 May 2008Lynn Baker USSKA Consortia Meeting Washington, DC7 AWG Major Objectives –Fabrication methods and designs to provide low cost antennas –Cost modeling of antennas to estimate optimum parameters –Provide broadband feeds and low noise receivers AWG Work Blocks –Reflector fabrication techniques, especially hydroforming –Antenna mounts, structural support of reflectors –Analysis of environmental effects, solar, gravitation, wind, climate –Reflector optical designs to achieve specifications –Cost modeling of antennas –Broadband feeds, potentially 10:1 bandwidth –Low noise amplifiers matched to feeds

22 May 2008Lynn Baker USSKA Consortia Meeting Washington, DC8 CPG Major Objectives –Feasibility of calibration and processing meeting science goals –Cost modeling WRT array and antenna parameters –Provide antenna specifications to AWG –Demonstrate algorithms on pathfinder data –Liaison with other calibration and processing groups CPG Work Blocks –Signal transport –Calibration algorithms –Imaging, spectroscopy, time domain imaging –Scalability and high performance computing

22 May 2008Lynn Baker USSKA Consortia Meeting Washington, DC9 AWG Meeting, March 2008 First meeting of the AWG and associated experts –Extended presentations from four pathfinder projects –Presentations on composite and hydroformed fabrication –Presentations on low noise receivers and broadband feeds –Presentations on reflector optics designs and tradeoffs –Conclusions from the meeting included in the AWG work plan CPG Organizational Meetings, March & May 2008 –Discussions of goals, work plans and required staffing –Status of recruitment for project

22 May 2008Lynn Baker USSKA Consortia Meeting Washington, DC10 TDP/AWG URL: CPG URL: TDP Web Pages