Run 12 RHIC Machine/Experiments Meeting 3 Jan 2012 (4 th meeting) Agenda: Run 12 Priorities.

Slides:



Advertisements
Similar presentations
Run8 – Coming sooner than we had thought Mike Leitch Run8 Coordinator November 7 th /7/20071MJL.
Advertisements

Run 15 RHIC Machine/Experiments Meeting 7 Apr 2015 Agenda: Run 15 Schedule (Pile)
Run 14 RHIC Machine/Experiments Meeting 27 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run 9 polarized proton Log 9 Jan begin 45 degree cool down from room temp (3 MW-NEW) 2 Feb, Cool-down to 4.5 degrees begins 5 Feb, Blue ring cold but still.
RUN 12 RHIC MACHINE/EXPERIMENTS MEETING 18 October 2011 (1 st meeting) Agenda: Schedule issues (Pile) Machine Status (Fischer) STAR Readiness PHENIX Readiness.
1 RHIC Run-7 Au-Au Operation A. Drees APEX workshop, Nov 2 nd 2006 Run organization Previous run and expectation for Run7 Start-Up plan Problem areas.
Run 12 RHIC Machine/Experiments Meeting 24 Jan 2012 (5 th meeting) Agenda: G  for 100 GeV pp run 100 GeV pp Lumi Goals Power Update.
Run 11 as run 3 Jan, Begin cool-down to 4.5K 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins 24 Jan, 1 week Ramp-up with 8 hr/night.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
PHENIX Run-14 Status January 28, 2014 Klaus Dehmelt 1Klaus Dehmelt - Jan 28, 2014 RHIC Time meeting.
Run 12 RHIC Machine/Experiments Meeting 29 Jun 2012 Run 12 Summary Slides.
Internal target option for RHIC Drell-Yan experiment Wolfram Fischer and Dejan Trbojevic 31 October 2010 Santa Fe Polarized Drell-Yan Physics Workshop.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
Run 13 RHIC Machine/Experiments Meeting 21 May 2013 Agenda: Status Reports.
Run 13 RHIC Machine/Experiments Meeting 4 Jun 2013 Agenda: Status Reports Hydrogen Jet issue (Eyser)
1 QM2006 D.I.Lowenstein RHIC : The Path Forward Presented to Quark Matter 2006 Shanghai, PRC Derek I. Lowenstein Brookhaven National Laboratory November.
1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?
1. LANL-led silicon detector project (FVTX) installed into RHIC this FY, 4.5 cm from beam pipe Increased leakage current in detectors implies somewhat.
Run 15 RHIC Machine/Experiments Meeting 30 Sep 2015 Run 15 Summary Slides 1.
15 May 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Experiment Issues PHENIX (Leitch) STAR (Christie) Monopole.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Dec 27) – Dec. 1, Begin cooldown to 4.5K – Dec. 4, Cooldown to.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
May 17, 2005Wednesday Experiment Meeting BNL, Upton Acceleration beyond 100 GeV  Goal To evaluate the spin dynamics beyond 100 GeV  What’s the impact.
Run 14 RHIC Machine/Experiments Meeting 3 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run-10 Medium-Energy Running Update Stefan Bathe for PHENIX RHIC Machine-Experiment Meeting 3/30/2010.
General Status of STAR pp run as of June 1, pb -1 delivered ~1.78 pb -1 sampled 292 nb -1 delivered ~ 93 nb -1 sampled (93/180 ~ 52%) N.B
October 4-5, Overview of ARRA funded AIPs at C-AD Wolfram Fischer October 4, 2010.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
Run 12 RHIC Machine/Experiments Meeting 28 Feb 2012 Agenda: Discussion - when to end the 200 GeV pp run… presently scheduled to end early Friday morning,
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
Run 13 RHIC Machine/Experiments Meeting 9 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited again.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
Polarized proton projections Wolfram Fischer 11 May 2012 RHIC Spin Collaboration Meeting BNL.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
27 Mar 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Machine Issues - (Drees) –Experiment Issues PHENIX (Leitch)
Run 12 RHIC Machine/Experiments Meeting 7 Dec 2011 (3 rd meeting) Agenda: Run 12 Priorities.
Jefferson Lab Overview Bob McKeown April 20, 2015.
26 May 2015 Run 15, Time Meeting Agenda: Take 5 for safety E. Lessard Schedule P. Pile Linac Status D. Raparia AGS Status V. Schoefer Cryo Status R. Than.
STAR Run 16 Schedule Zhangbu Xu Machine/Experiment Schedule Meeting 01/05/2016.
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
Run 16 RHIC Machine/Experiments Meeting 5 Jan 2016 Agenda: Run 16 Schedule (Pile) AuAu Run Plan (Gu) Projections for deuteron-gold energy scan (Liu) STAR.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
Run 14 RHIC Machine/Experiments Meeting 6 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 7 Jun 2011 Agenda: √s = 200 GeV AuAu progress 27 GeV Run (or other)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 31 May 2011 Agenda: √s = 200 GeV AuAu progress Update on 250 GeV integrated Lumi.
Time Meeting March 29, W. Christie Blue Ring Magnet String issue: -on Friday morning 7am (18 March 2016) a problem developed in the RHIC Blue ring.
Run 13 RHIC Machine/Experiments Meeting 2 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited (A. Dress)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 29 Mar 2011 Agenda: Open.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 22 Mar 2011 Agenda: Open.
Run 16 plan based on 20 weeks cryo operation and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015 Today, 1 March 19 Jan, Begin.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Jan 12) – Dec. 1, Begin cool down to 4.5K – Dec. 4, Cooldown to.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
EC plans in connection with eRHIC Wolfram Fischer ILCDR08 – Cornell University, Ithaca, New York 10 July 2008.
Run 16 RHIC Machine/Experiments Meeting March 1, 2016 Agenda: Run 16 Power use/cost (Christie) Short presentation by PHENIX (Denis Jouan) AOB READYTALK.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Run 12 RHIC Machine/Experiments Meeting 6 Mar 2012 Agenda: Status reports Other business.
Run 14 RHIC Machine/Experiments Meeting 24 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run16 Y. Akiba.
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
MC1 – Colliders Invited Talks Proposals
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
Budget Planning Calendar
Main Design Parameters RHIC Magnets for MEIC Ion Collider Ring
Presentation transcript:

Run 12 RHIC Machine/Experiments Meeting 3 Jan 2012 (4 th meeting) Agenda: Run 12 Priorities

Run 12 Plan based on PAC recommendation/ALD Guidance and 20 weeks cryo operation 3 Jan 12 DRAFT – an example 20 week schedule 17 Jan, Begin cool-down to 4.5K 20 Jan, Cool-down to 4.5K in Blue Ring complete, begin magnet setup 24 Jan, Cool-down to 4.5K complete in both rings begin √s = 200 GeV pp setup 31 Jan, begin 2 week ramp-up with 8 hrs/night for experiments 14 Feb, begin 5 weeks pp physics with further ramp-up 20 March, end 5 week √s = 200 GeV pp run, begin ½ week setup for √s = 500 GeV pp 24 March, begin 1 week ramp-up to √s = 500 GeV with 8 hrs/night for experiments 31 March, begin 7 week pp physics run at √s = 500 GeV 19 May, end 7 week pp physics run at √s = 500 GeV If Uranium or Cu-Au… 19 May, begin 1 week setup for UU or CuAu (no overnight stores for experiments) May: IPAC 26 May, begin 1 week UU or CuAu physics run 2 Jun, end 1 week UU or CuAu physics run 5 June, cryo warm-up complete (20.0 cryo-weeks) Total Physics Weeks = 13

$ in BNL Balanced Billing Bank for FY12 (through Nov) = +$598K

Other Slides

D.L. November 23, 2011 update Our helium supplier no longer able to meet our peek demand of 4 trailers in a one week period. They can give us one trailer a week starting on December 31st, so we expect to have all the helium we need, on time, but we will have to store most of it in the dewars outside 1006B. This will result in our 4K cooldown being a little less stable and predictable than it has been for the past few years when we received all of the helium at 1005R over a short period of time. Because of this, I expect the 4K cooldown will take a least one additional day. Cryo Issue

Wolfram Fischer 8 For Run 12 the PAC recommends the following (in order of priority): 5 weeks of running with polarized proton collisions at 200 GeV. 7 weeks of running with polarized proton collisions at 500 GeV. 5 weeks of running with Cu+Au collisions at 200 GeV. 3 weeks of running with U+U collisions at 193 GeV. For Run13 the PAC recommends the following (not in order of priority): 12 weeks of running with polarized proton collisions at 500 GeV. 5 week of running with polarized proton collisions at 200 GeV. 7 weeks of running with Au+Au collisions at full energy. Recommendations following the June 6-8, 2011 PAC

Run 12 Plan based on PAC recommendation/ALD Guidance and 22 weeks cryo operation 22 Nov 11 DRAFT 17 Jan, Begin cool-down to 4.5K 20 Jan, Cool-down to 4.5K in Blue Ring complete, begin magnet setup 24 Jan, Cool-down to 4.5K complete in both rings begin √s = 200 GeV pp setup 31 Jan, begin 2 week ramp-up with 8 hrs/night for experiments 14 Feb, begin 5 weeks physics with further ramp-up 20 March, end 5 week √s = 200 GeV pp run, begin ½ week setup for √s = 500 GeV pp 24 March, begin 1 week ramp-up to √s = 500 GeV with 8 hrs/night for experiments 31 March, begin 7 week pp physics run at √s = 500 GeV 19 May, end 7 week pp physics run at √s = 500 GeV 17.4 cryo-weeks to this point, schedule beyond this point to be determined If Uranium… 19 May, begin 1 week setup for √s = 193 GeV/n UU (no overnight stores for experiments) 26 May, begin 3 week √s = 193 GeV/n UU physics run 16 Jun, end 3 week √s = 193 GeV/n UU physics run 19 June, cryo warm-up complete (22.0 cryo-weeks) Consistent with Fischer et. al. “RHIC Collider Projections (FY 2012 – FY 2016)” 14 October 2011

From Fischer et. al. “RHIC Collider Projections (FY 2012 – FY 2016)” 14 October 2011

Run 12 projection for √s = 200 GeV pp From Fischer et. Al. “RHIC Collider Projections (FY 2012 – FY 2016)” 14 October 2011

Run 12 projection for √s = 500 GeV pp From Fischer et. Al. “RHIC Collider Projections (FY 2012 – FY 2016)” 14 October 2011

Run 12 projection for √s = 193 GeV/n UU From Fischer et. Al. “RHIC Collider Projections (FY 2012 – FY 2016)” 14 October 2011

Run 12 projection for √s = 200 GeV/n CuAu From Fischer et. Al. “RHIC Collider Projections (FY 2012 – FY 2016)” 14 October 2011