Tracker Subsystem1 GLAST LAT Project FM7/9 PSR, Sept. 9, 2005 GLAST LAT Tracker Tower7/9 Pre-Ship Review INFN-Pisa.

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM15 PSR, Oct. 14, 2005 GLAST LAT Tracker Tower15 Pre-Ship Review INFN-Pisa.
Advertisements

Tracker Subsystem1 GLAST LAT Project FM1/3 PSR, April 20, 2005 GLAST LAT Tracker Tower-1/3 Pre-Ship Review INFN-Pisa.
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectMarch 24, 2003 HPS Tracker Peer Review, WBS Section 2-D 1 GLAST Large Area Telescope: Tracker Subsystem WBS Structural.
2005 LAT-COLLABORATION MEETING Gamma-ray Large Area Space Telescope A walk through the LAT Tracker towers alignment Nicola Omodei INFN-Pisa.
GLAST LAT Project Gamma-ray Large Area Space Telescope Status of the EM Thermal Tests GLAST Large Area Telescope: GLAST Large Area Telescope: Tracker Subsystem.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 5 of 12 Subsystem Acceptance 1 GLAST Large Area Telescope Pre-Environmental.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Tracker Test Plan Overview.
GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
Tracker Subsystem1 GLAST LAT Project FM16 PSR, Nov. 4, 2005 GLAST LAT Tracker Tower16 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
GLAST LAT ProjectMonthly Status Meeting, June 30, Cost/Schedule Reports for 4.1 LAT Presentation Presentation May 2005 Month End Gamma-ray Large.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
July GLAST Project Installation Review LATLAT 1 Tracker Tower Installation Review Peter Amnuaypayoat
GLAST LAT Project TKR Tower 4 and 5 hand-off review – June 8,2005 Hiro Tajima, TKR Tower 4 and 5 hand-ff review 1 GLAST Large Area Telescope: TKR Hand-off.
GLAST LAT Project – Cost and Schedule ReviewNovember 3, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review November 3, 2004.
GLAST LAT ProjectMonthly Status Review – Sept. 1, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
Tracker Subsystem1 GLAST LAT Project FM4/5 PSR, May 31, 2005 GLAST LAT Tracker Tower-4/5 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
Tracker Subsystem1 GLAST LAT Project FM-B PSR, 10 Feb, 2005 GLAST LAT Tracker Tower-B Pre-Ship Review Luca Latronico INFN-Pisa
GLAST LAT Project18 July GLAST Large Area Telescope: NCR 529 Systems Engineering R. Bright Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectPeer Review, March 24-25, E2 1 Gamma-ray Large Area Space Telescope 7E2: EM test plans GLAST Large Area Telescope: GLAST Large Area.
Tracker Subsystem1 GLAST LAT Project FM6 PSR, July 21, 2005 GLAST LAT Tracker Tower6 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectLadder wirebonds break - MRB 03 Dec 2004 L. Latronico1 Ladder Wirebonds break MRB Meeting – 3 december 2004.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
GLAST LAT ProjectDecember 2, 2003 R. Johnson Engineering Meeting 1 GLAST Large Area Telescope: Tracker Subsystem WBS Tracker EM Vibration Test Status.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 GLAST Large Area Telescope: Tracker Subsystem MCM Production Readiness.
GLAST Large Area Telescope:
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
Tracker Subsystem1 GLAST LAT Project Production Readiness Review, 25 August, 2004 GLAST LAT Tracker TOWER-A PRR TKR Tower Electrical Test Plan Luca Latronico.
Tracker Production Overview Readout Cables UCSC, SLAC (Parlex) SSD Procurement, Testing SLAC,Japan, Italy (HPK) Electronics Fabrication, burn-in, & Test.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
GLAST LAT ProjectMarch 24, G Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS G: Tower module assembly A.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
041103_SECCHI Status.1 SECCHI Status R.A. Howard STEREO SWG 2-5 May 2005 Hamburg Planetarium.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: Mechanical Parts and Materials.
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMonthly Status Review – Nov 3, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
Cable MRB July 13, 2005 R.P. Johnson. July 13, 2005R.P. Johnson2 Cable Status Needed in Italy to support Tower 8,9 Environmental Testing July 19.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
Gamma-ray Large Area Space Telescope Tower 1 TVAC tests Bad ladders issues.
GLAST LAT ProjectMRB 09/14/2005 L. Latronico1 Tower 14 – Layer Y0 malfunction MRB Meeting – 14 September 2005.
Tracker Subsystem GLAST LAT Project 1 ANNEX 1 to NCR/FM/INFN/PI/372 STATIC TEST TORQUE LOSS OUT OF SPEC’S ON BOTTOM TRAY S/N 005 Andrea Tenze
GLAST Large Area Telescope:
General overview Place : Institue of Space Astrophysic (IAS, Orsay)
GLAST Large Area Telescope:
Tower 8 – X6 anomaly MRB Meeting – 24 August 2005.
TOWER 3 CONFIGURATION Configuration:
Mini-Tower test results
THEMIS INSTRUMENT SUITE
Open Issues Modification of Cactus Arm bending tool required
We have no new trays for tower 4!!
GLAST Large Area Telescope:
7E: Tower test plans GLAST Large Area Telescope: Tracker Subsystem
GLAST Large Area Telescope
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
Presentation transcript:

Tracker Subsystem1 GLAST LAT Project FM7/9 PSR, Sept. 9, 2005 GLAST LAT Tracker Tower7/9 Pre-Ship Review INFN-Pisa

Tracker Subsystem2 GLAST LAT Project FM7/9 PSR, Sept. 9, 2005 Tower 7 - Assembly and test highlights June 14 - July 4, 2005 (INFN-Pisa) : –assembly of complete tray stack –incomplete cable set (C0,C1,C2,C3,C4,C7) –Sidewalls, alignment July 7-15, 2005 (Alenia-Roma) : –VIB, TVAC test RUN I NCR 544 layerX17 noise anomaly July 25-26, 2005 (INFN-Pisa) : –Tray 17 replacement –C5 installation July 28 – August 31, 2005 (Alenia-Roma) –TVAC (7/28-8/4) RUN II –VIB (8/31) RUN II (Z axis only) September 1-5, 2005 (INFN-Pisa) : –C6 installation –Solithane, EMI taping –Alignment verification, final CPT Full EIDP details (soon) at: – Aluminum service sidewall tray17 replacement tray to be replaced

Tracker Subsystem3 GLAST LAT Project FM7/9 PSR, Sept. 9, 2005 Tower 7 – Environmental test runs configurations

Tracker Subsystem4 GLAST LAT Project FM7/9 PSR, Sept. 9, 2005 Tower 7 Delivery configuration Tower PN: LAT-DS (rev3) Tower SN: 7 Details on NCR 530

Tracker Subsystem5 GLAST LAT Project FM7/9 PSR, Sept. 9, 2005 Tower 7 – Configuration and mechanical verifications Alignment, Mass, COG: Tower 7 well aligned and inside stayclear Mass (32.705Kg) and CG near estimated values (when used real masses) Full data available from EIDP and INFN-PISA web site Configuration: Kapton tape and foam applied on the flex cables as per LAT-DS layers of Poron foam THK used on Bottom and Top Tray (–X) side (in place of 5 layers) Base Plate assembly: Torque of nuts 5.3 Nm, spec is ( /-0 Nm)

Tracker Subsystem6 GLAST LAT Project FM7/9 PSR, Sept. 9, 2005 Tower 7 – Open NCRs INFN/PI-530: environmental test in non-flight configuration –both environmental test runs were performed with missing cables, as agreed by an MRB –As a consequence of the missing solithane, 4 screws loss nominal torque and 1 was halfway unscrewed on one sidewall after Z-axis vibrations: the screws were re-torqued to spec and the following X and Y axis vibrations did not show any torque loss the NCR can be closed – the NCR can be closed INFN/PI-543: layer X7 not read out (TVAC RUN I) –X7 could not be readout at power up after vib test. X7 was properly read at the following and first switch on during TVAC –The problem is due to a known and documented issue with resetting MCM (NCR 417) with missing cables –To avoid the many and unknown number of power cycle needed to re-establish a good configuration with as many readable layers as possible, hot/cold switch on and off were not performed the NCR can be closed – the NCR can be closed INFN/PI-544: layer X17 noisy at hot soak (TVAC RUN I) –As per MRB decision, tray 17 (MID010) was replaced with a new tray, and tower7 retested –the NCR can be closed INFN/PI-570: cold/hot power off/on not performed (TVAC RUN II) –Same as NCR 543 –the NCR can be closed INFN/PI-547: Vacuum level out of specification (TVAC RUN I) –The situation is similar to earlier TVAC tests and the proposal is to accept the test as for previous MRBs. Tower 6 was tested with tower 7 RUN I and the same NCR was closed

Tracker Subsystem7 GLAST LAT Project FM7/9 PSR, Sept. 9, 2005 NCR 534: 2 layers (Y2, X5) sometimes out of spec due to fluctuations in noisy channels; the NCR can be closed X17 fixed after tray M010 replacement X5 showed 1 noisy ladder when ramping from 3 rd cold to 4 th hot soak: similar isolated anomalies, appearing randomly and only once were observed in other towers and are very likely caused by noise pickup dependent on the setup and/or the readout system (remember NCR 461 on the interference between the 2 towers DAQ causing test failures) Tower 7 – Bad channels

Tracker Subsystem8 GLAST LAT Project FM7/9 PSR, Sept. 9, 2005 Tower 7 - Efficiency All layers well within spec (eff > 98%) Differences correlated to bad channels No change after z-axis vib retest taken in Alenia after 2 nd TVAC

Tracker Subsystem9 GLAST LAT Project FM7/9 PSR, Sept. 9, 2005 Tower 7 TVAC – vacuum out of spec RUN I Same behaviour as previous tests – proposal is to accept the test: Vacuum slightly higher than spec (~> vs 5x10 -5 Torr) during hot soaks Vacuum level improving with time same pressure behaviour in dry run with MGSE Same behaviour as tower6 TVAC, accepted during preship review (corresponding NCR 546 was closed)

Tracker Subsystem10 GLAST LAT Project FM7/9 PSR, Sept. 9, 2005 Tower 9 - Assembly and test highlights July 8-15, 2005 (INFN-Pisa) : –assembly of complete tray stack –incomplete cable set (C0-non-flight,C3 missing,C7-non-flight) –Sidewalls, alignment July 25 – august 4, 2005 (Alenia-Roma) : –VIB, TVAC September 5-7, 2005 (INFN-Pisa) : –C0, C7 replacement with flight cables –C3 installation –Solithane, EMI taping –Alignment verification, final CPT Full EIDP details (soon) at: – tray to be replaced

Tracker Subsystem11 GLAST LAT Project FM7/9 PSR, Sept. 9, 2005 Tower 9 – Configuration and mechanical verifications Alignment, Mass, COG: Tower 9 well aligned and inside stayclear Mass (32.840Kg) and CG near estimated values (when used real masses) Full data available from EIDP and INFN-PISA web site Configuration: Kapton tape and foam applied on the flex cables as per LAT-DS layers of Poron foam THK used on Bottom and Top Tray (–X) side (in place of 5 layers) Base Plate assembly: Torque of nuts 5.4 Nm, spec is ( /-0 Nm)

Tracker Subsystem12 GLAST LAT Project FM7/9 PSR, Sept. 9, 2005 Tower 9 – Open NCRs INFN/PI-541: environmental test in non-flight configuration –environmental test were performed with missing cables, as agreed by an MRB –Missing cables are the consequence of the following NCRs the NCR can be closed – the NCR can be closed INFN/PI-560: cold/hot power off/on not performed –To avoid the many and unknown number of power cycle needed to re-establish a good configuration with as many readable layers as possible, hot/cold switch on and off were not performed after a satisfactory running condition was found –the NCR can be closed INFN/PI-559: layers X2 and X12 not read out –Despite the many power cycles it was never possible to reset the tower as to read these layers; when a practical configuration was found with all layers readable but these 2, TVAC was run with such two layers disabled –Post environmental test show no problem in the performance of these two layers (see next slide) –the NCR can be closed

Tracker Subsystem13 GLAST LAT Project FM7/9 PSR, Sept. 9, 2005 Tower 9 - Efficiency All layers well within spec (eff > 98%) Total bad channels in tower ~50