Pre-Construction Phase 1 - Job Site Conditions Work Plan -2.

Slides:



Advertisements
Similar presentations
CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
Advertisements

A Joint Code of Practice Objectives and Summary Presentation
Bob Smith, P.E. Region 1 Benjamin Acimovic, P.E., Region 1
Construction Contracting
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Potential Second Access Currently we are working on approval access to 2 nd Avenue under CP tracks as shown in top left photo. Our entrance would be across.
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
Presenter: Victor C. Tyler, P.E. Estimating and Bidding Strategies that Drive Best Practices.
Construction Cost Estimation Michael Mincic Civil Engineering Technology Department 22 February 2007.
Professional Construction Management
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Team work : Jehad Khalaf Ehab Esheach Raed Shehada Khalil Abu Eed Supervisor: Dr. Kamalin Shaat Team work : Jehad Khalaf Ehab Esheach Raed Shehada Khalil.
Project Startup Hmwk Due 10/11/ # 1,3,7,8 8.9 #1 9.7 #1,3,4,5, #1,2,3,4,10.
1 Preconstruction Site investigation, Scheduling, Estimating, and design Preconstruction Site investigation, Scheduling, Estimating, and design Prepared.
PREPARED BY: Mohammed Tanbora SUPERVISED BY: Dr. Kamalain K. Shaat CHAPTER8: Application Of Controls.
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
Introduction -Discussed preparation of the overall plan for the project - as well as its implementation. -The control system quantitatively measures actual.
PROJECT DELIVERY SYSTEMS
ESTIMATING By Laith Jacob.
KFUPM, Department of Construction Engineering and Management Summary of AN IMPLEMENTATION MODEL FOR DESIGN-BUILD (D-B) PROJECT DELIVERY SYSTEM BY : MOHAMMAD.
APPLICATION OF CONTROLS CHAPTER 8 Presenting by : Mustafa Al tayeb Date 21/11/2005.
Construction Industry Development Board development through partnership Construction Procurement documents 2c.
Development plan and quality plan for your Project
Construction Engineering 221 Cost Estimating and Bidding.
Construction Contract Documents
Prof. Awad S. Hanna S TEPS IN THE D EVELOPMENT OF A D ETAILED E STIMATE.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Nabil dmaidi1 Bid Submission Documents A LATE BID IS NO BID.
Detailed Quantity Estimating Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Chapter 8 Pricing Generally. Objectives Upon completion of this chapter, you will be able to: –Describe the general process of pricing a construction.
Project Development Decision Tree PermittingIn-house Reqmts.Energy SalesFuel Consumption Plant Configuration Risk AssessmentCapital Costs Schedule Constraints.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
Company LOGO Introduction To An Example Project Prepared by: Alaa El Shorafa Munther Abdel-Hadi Ahmed El Zinati Shukri El Zaza Dr. Kamaleen Sha’th Supervision.
Specification & Quantities Estimating
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Lecture #2: The Design and Construction Team Professor: Robert Powell, AIA TA: Matt O’Brien, AIA August 20, 2008 AREN 231: Methods and Materials.
CVE 4070 Construction Engineering Value Engineering Prof. Ralph V. Locurcio, PE.
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Agency Construction Management :CM NOT AT-RISK
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specification-Show how project.
College of Environment Design Construction Engineering Technology Assessment of Constructability Practice Among General Contractors in The Eastern Province.
Weddell Power Station unit three
PREPAREDBY: PREPARED BY: Ahmed Al Tayeb Saed Al Qeshawe Tareq Amen Abdalla Syiam SUPERVISED BY: Dr. Kamalain K. Shaat CHAPTER8: Application Of Controls.
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
Contractor Alternate Design Serving the Public’s Best Interest.
You passed the Bond or secured some funds What do we do now? 2014.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specifications-Show how project.
Alternate Project Delivery Systems for Governments.
Construction Management At Risk Process
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
SEWER TRUNK LINE REHABILITATION PROJECT (Alexandria Place, Black Oak and Navy Drive) COUNCIL AGENDA ITEM 14.1.
 To provide a realistic accurate idea of the cost  Provide information about building or not.
USAID Afghanistan Engineering Support Program (ESP) Pre-Bid Meeting July 14, 2015.
Lease-Leaseback Project Delivery Method
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
CM at Risk v. Design-Bid-Build
Bidding Requirements Review Questions.
Costs and Economics of Construction
Financing Land Development Projects
9/18/2018 Bids CONTRACTING Khamis…..
STEPS IN THE DEVELOPMENT OF A DETAILED ESTIMATE
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Designers’ Manual Appendix Contents
Lecture 10 PROCUREMENT Ferdinand FASSA.
ESTIMATION Estimation is the scientific way of working out the approximate cost of an engineering project before execution of the work. It is totally different.
Chapter 2 – Review ‘construction management’
Honoraria for Design Build Projects Methodology Assessment Matrix
Presentation transcript:

Pre-Construction Phase 1 - Job Site Conditions Work Plan -2

Role of Prof CM in this phase - Developing proposed contract packages - Fair-cost estimates - Realistic schedules - Value engineering program

1- Job Site Conditions 1-1 Construction Site Conditions - Professional CM must become knowledgably of factors which effecting performance of construction work like successful subcontractors

- Program bid packages will not necessity work as well in other PLACES - Professional CM develop the progress in this manner to fulfill the obligation to the owner

1-1-1 Foundation and Earthwork Condition - Prof CM observe unusual conditions like presence of surface rocks or water. - If the construction manager is not aware of the potential problems and difficulties a meaningful estimate for the work can not be prepared, nor can a bid packages be framed that will minimize uncertainties, unneeded risks and hence the contingencies that would be included by bidder in their prices. (Example : 18 inch unsuitable material) (TABLE 5-1)

1-1-2 General planning - Prof cm can see access roads and rail roads and other factors firsthand. - Choose areas for locating temporary faculties. - Develop a preliminary plan for contractor storage area. - Allow for existing electric and water. - Observe interferences with existing facilities. - Develop plan for site security. (Example: change kind)

1-2 Area Construction Practice - Equally important to the job site investigation or even more important. - Even if the manager is familiar with the area,he should systemically review the local conditions,if he is operating in anew area the investigation is of paramount importance.

1-2-1 local work practices and jurisdiction Prof CM handling a phased construction program is constantly faced both : - with fitting his construction packages to design schedule. - with tailoring them to optimum size that will attract qualified contractors. Example: storm and sanitary swear pipes

1-2-2 Labor costs, productivity, and availability - Determination of productivity varies from contractor to contractor and from trade to trade. - Productivity will follow the extent to which contractor management has retained control over the labor.

- Estimating construction costs in areas where extensive coffee breaks, long lunch hours,early quitting are completely different from estimating similar work in areas where contractor management has good over the work force.

1-2-3 Locally favored methods and materials Designer specify methods,if the designer is unfamiliar with local conditions,investigation of locally favored method and materials can significant reduce project cost.

Key local prices - Obtain local prices for each items. - Compare prices with alternative method. - Making fair-cost estimate. Example : Precast Concrete : - Readily available. prices include: (sand,cement,gravel,concrete blocks,lumber,others) - Not readily available.

Thank you

2-Work Plan 2-1 Preliminary Estimate 2-2 Summary Schedules design and procurement schedules summary construction schedules 2-3 Work Packages construction economy design constraints

2-4 Value Engineering Program Conceptual Phase Detail design Phase Procurement Phase 2-5 Construction Planning Temporary Facilities Procedure Outline Cash-flow Requirements