Keck Interferometer Support Trade Study Christopher Neyman Junichi Meguro W. M. Keck Observatory Viswa Velur Caltech Keck NGAO Team Meeting #5 March 7,

Slides:



Advertisements
Similar presentations
Subaru AO in future. Outline Overview of AO systems at Mauna Kea and in the world. Ongoing plan of AOS at Subaru and Mauna Kea. What’s in future.
Advertisements

Interferometry It deals with experimental study of the phenomenon of interference. Instruments used in this study are based on principle of interference.
MCAO Laser Launch Telescope and Periscope Celine d’Orgeville and Jim Catone.
1 ATST Imager and Slit Viewer Optics Ming Liang. 2 Optical layout of the telescope, relay optics, beam reducer and imager. Optical Layouts.
NGAO Calibration/Simulation Source T. Stalcup, M. Pollard.
Science with the Very Large Telescope Interferometer (VLT-I) Jean-Baptiste Le Bouquin (ESO, Chile) for VLTI Team, AMBER team, MIDI team, PRIMA team… The.
Optical Astronomy Imaging Chain: Telescopes & CCDs.
The Project Office Perspective Antonin Bouchez 1GMT AO Workshop, Canberra Nov
Laser guide star adaptive optics at the Keck Observatory Adam R. Contos, Peter L. Wizinowich, Scott K. Hartman, David Le Mignant, Christopher R. Neyman,
Laser Launch System for the LBT Richard Davies Sebastian Rabien Max Planck Institute for Extraterrestrial Physics  Approaches of other observatories 
Trade Study Report: Fixed vs. Variable LGS Asterism V. Velur Caltech Optical Observatories Pasadena, CA V. Velur Caltech Optical Observatories Pasadena,
GMT Phasing GLAO – not needed LTAO – Phase stabilization done at ~1kHz with edge sensing at M1 and M2 – Phase reference set at ~.01Hz using off-axis star.
NGAO Companion Sensitivity Performance Budget (WBS ) Rich Dekany, Ralf Flicker, Mike Liu, Chris Neyman, Bruce Macintosh NGAO meeting #6, 4/25/2007.
W. M. Keck Observatory’s Next Generation Adaptive Optics Preliminary Design & Path Forward Peter Wizinowich, Sean Adkins, Rich Dekany, Don Gavel, Claire.
NGAO System Design Review Response Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting June 18, 2008.
Aug-Nov, 2008 IAG/USP (Keith Taylor) ‏ Instrumentation Concepts Ground-based Optical Telescopes Keith Taylor (IAG/USP) Aug-Nov, 2008 Aug-Sep, 2008 IAG-USP.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
Science Team Management Claire Max Sept 14, 2006 NGAO Team Meeting.
NGAO 1-tier Draft Optical Relay Design P. Wizinowich 12/7/07.
AURA New Initiatives Office S.C. Barden, M. Liang, K.H. Hinkle, C.F.W. Harmer, R.R. Joyce (NOAO/NIO) September 17, 2001 Instrumentation Concepts for the.
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
Keck Next Generation Adaptive Optics Team Meeting 6 1 Optical Relay and Field Rotation (WBS , ) Brian Bauman April 26, 2007.
PALM-3000 PALM-3000 Instrument Architecture Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting April 3, 2007.
AO opto-mechanical design architectures Cost Impact Don Gavel NGAO Team Meeting #5 February 5, 2009.
WFS Preliminary design phase report I V. Velur, J. Bell, A. Moore, C. Neyman Design Meeting (Team meeting #10) Sept 17 th, 2007.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
WBS 3.3 Laser Facility Jim Bell, Jason Chin, Erik Johansson, Chris Neyman, Viswa Velur Design Meeting (Team meeting #11) November 05, 2007.
WBS 3.3 Laser Facility Jim Bell, Jason Chin, Erik Johansson, Chris Neyman, Viswa Velur Laser Architecture Meeting Oct 1 st, 2007.
NGAO 1-tier Draft Optical Relay Design P. Wizinowich 12/3/07.
NGAO Status R. Dekany January 31, Next Generation AO at Keck Nearing completion of 18 months System Design phase –Science requirements and initial.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
Design Team Report: Laser Facility Chris Neyman Jim Bell, Erik Johansson, Jason Chin W. M. Keck Observatory Viswa Velur Caltech Optical Observatories Keck.
Chapter 25: Interference and Diffraction
NGAO Meeting #5 Introduction NGAO Meeting #5 Peter Wizinowich March 7, 2007.
WMKO Next Generation Adaptive Optics: Build to Cost Concept Review Peter Wizinowich et al. December 2, 2008 DRAFT.
P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002 Keck AO Overview to support summit tour.
NGAO Instrumentation Preliminary Design Phase Planning September 2008 Sean Adkins.
1 NGAO Science Instrument Reuse Part 1: NIRC2 NGAO IWG December 12, 2006.
Functional Requirements for NGAO Christopher Neyman W. M. Keck Observatory NGAO Team Meeting #9 August 24, 2007.
Throughput and Emissivity for Alternatives to the Baseline AO Layout Don Gavel NGAO Telecon January 28, 2009.
Trade Study Report: NGAO versus Keck AO Upgrade NGAO Meeting #5 Peter Wizinowich March 7, 2007.
AO Opto-mechanical System Design Status, Issues, and Plans Don Gavel UCO/Lick Observatory (for the opto-mechanical design team) Keck NGAO Team Meeting.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
1 Keck Interferometer Requirements and Implications for NGAO Christopher Neyman W. M. Keck Observatory Keck NGAO Team Meeting #2 November 14,
What Requirements Drive NGAO Cost? Richard Dekany NGAO Team Meeting September 11-12, 2008.
NGAO Controls Team Kickoff Meeting August 5, 2008 Erik Johansson.
Blue Dot Team « Multi aperture imaging ». BDT sept MAI techniques High accuracy visibility measurement Differential interferometry Nulling.
MCAO Adaptive Optics Module Mechanical Design Eric James.
Telescopes & recent observational techniques ASTR 3010 Lecture 4 Chapters 3 & 6.
‘OHANA Towards kilometric infrared arrays Visions for InfraRed Astronomy Paris March 21, 2006 Guy Perrin (+ many others including Pierre)
Multiplexed High Res Spectroscopy at Keck – J. Cohen (PI), H. Epps (Optical Design), M. Rich (Project Scientist) Keck instruments for optical spectroscopy.
An Approach to Stabilizing Large Telescopes for Stellar Interferometry It shakes like a…. [G. Vasisht, 31 March 2006] N. Di Lieto J. Sahlmann, G. Vasisht,
SAM PDR1 S OAR Adaptive Module LGS LGSsystem Andrei Tokovinin SAM LGS Preliminary Design Review September 2007, La Serena.
D.GuilhemITER IR/VIS Diagnostic -- April 4th Cadarache Euratom 1/22 ITER wide-angle viewing thermographic and visible system Y.Corre, S.Droineau,
Ground Layer AO at ESO’s VLT Claire Max Interim Director UC Observatories September 14, 2014.
FELT 1 Study of the capability and configuration of a fixed mirror Extremely Large Telescope (FELT) Low cost path to large telescope Primary concern is.
AURA New Initiatives Office. GSMT SWG Meeting L. Stepp, July 30, 2002 NSF Science Working Group Support Available from AURA NIO Available Personnel Current.
Keck Observatory Overview Peter Wizinowich W. M. Keck Observatory AOSC May 31, 2004.
Keck Next Generation AO Next Generation Adaptive Optics Meeting #2 Caltech November 14, 2006 P. Wizinowich for NGAO Executive Committee.
Charts for TPF-C workshop SNR for Nulling Coronagraph and Post Coron WFS M. Shao 9/28/06.
Astronomical Spectroscopic Techniques. Contents 1.Optics (1): Stops, Pupils, Field Optics and Cameras 2.Basic Electromagnetics –Math –Maxwell's equations.
Copyright © 2009 Pearson Education, Inc. Chapter 35-Diffraction.
Telescopes I. Refraction: Refraction is the _____________ of light as it passes through glass. II. Reflection: Reflection occurs when light _____________.
Interferometer configurations for Gravitational Wave Detectors
Astronomical Spectroscopic Techniques
Keck Observatory Status
Laser(s) for Keck Observatory’s Next Generation AO (NGAO) System
MICHELSON INTERFEROMETER
Trade Study Report: Fixed vs. Variable LGS Asterism
Presentation transcript:

Keck Interferometer Support Trade Study Christopher Neyman Junichi Meguro W. M. Keck Observatory Viswa Velur Caltech Keck NGAO Team Meeting #5 March 7, 2007 Video Conference: WMKO,CIT,UC

2 Keck Interferometer Support Trade Study Keck Interferometer Trade Study –Consider the relative performance, cost, risk, & schedule of feeding KI with NGAO or a repackaged version of the current AO system –Decoupling of NGAO from interferometer support may simplify & improve performance of NGAO –The feasibility of maintaining a version of the two current AO systems for KI use should be evaluated –Complete when NGAO baseline architecture selected

3 Overview Slide/Outline Introduction Concepts for Interferometer support –NGAO feeding interferometer –Dual IF AO Systems –Swapping Keck (I/II) AO with NGAO Cost of construction and operations for above concepts Conclusions and recommendations

4 Introduction Why Are We Doing This? Current Keck Interferometer –Visibility First fringes on AGN –Nuller MRI (LGS → faint objects) –Planet detection –Young stellar objects –AGN –Galactic center: tests of general relativity In general astrometry requires long time span (1 century) Relatively short for galactic center (years) Current project started in ~1993 with speckle, continuing with KII LGS PI retires in ~2030 Important not to over constrain NGAO design

5 NGAO Feeding Interferometer Legacy AO (arm A) and NGAO (arm B) Need to match polarization, rotation, fringe symmetry (Nuller only) Viswa Velur in consultation with Kent Wallace (JPL) looked at polarization matching: –Martin-Puplett polarization modulator Preferred over wave plates Basis of current KI nuller combiner –“In general the polarization issue with interferometry is an intractable problem” Use close to normal incidence (K mirrors problematic) Coating information is incorrect, proprietary, or unavailable Geometry match imperfect, tight tolerances, realignments frequent –Still need to determine polarization shift for NGAO relay Indiana Wells New designs as available from Brain Bauman

6 Differential Phase Shifts Can Reduce Fringe Contrast: a Real World Example Fall 2003 Both K1 & K2 recoated Only K1 recoated After recoating only K1 AO image rotator significant drop in V 2 V 2 returned to nominal values when K2 was also recoated Suspect phase shift caused by different protective layers on top of silver coating

7 Interferometer Only AO Systems Build two identical AO systems –ESO MACAO (One for each 8-m) Options available –Adaptive secondary High throughput system Expensive Facility investment: could be used for other AO systems and instruments –Basement AO systems Some space in coude crypt 589nm transmission through basement windows (Silica yes, ZnS no) –Mount AO system under current AO bench Room available Could use MEMs and other technologies to reduce size/costs

8 Interferometer Only AO Systems AO enclosure Primary mirror cell IF beam tubes

9 Interferometer Only AO Systems AO enclosure NGAO Primary mirror cell IF beam tubes IF AO system

10 Interferometer Only AO Systems IF beam tubes Cables Cooling lines

11 Interferometer Only AO Systems Need to move AO focus below Nasmyth deck –Use large f/# secondary Have f/25 for both telescopes (Keck II in storage) Possibly requires more secondary exchanges –Use 1:1 relay (Offner or others) Extra reflections (3-5 total for Offner) –Move secondary toward primary 1 cm at secondary, 74 cm at Cassegrain focus Large spherical aberration (much larger than typical DM stroke) –MEMs small foot print AO Mount in current enclosure near focus Relay light out Need ~2 arc minute field for LGS tip/tilt, Interferometer field small –Adapting Bauman’s off-axis ellipse relay should address these issues –See NFIRAOS petite

12 AO for Interferometry at ESO: 4 Identical AO Systems that Only Feed the Interferometer 4 identical AO systems located below each telescope Coude mirror m8 is AO bimorph ESO built 6 AO units in total –4 for IF –1 for IFU spec. –1 for IR echelle Possible cost savings

13 Swapping K( I / II ) AO with NGAO Need to repackage current AO –Optical/mechanical bench –Electronics –Cooling lines –If NGAO is cooled, need to maintain NGAO temperature/seal Method to swap AO –Cart: roll AO on/off deck –Crane: lift AO on/off deck Historically, when instruments are damaged, it has occurred during instrument exchanges Currently move DEMIOS in and out of beam Originally proposed for current Keck I AO system and rejected

14 Cost of IF Support Options Cost estimate (WAG level) –AO secondary $7.6 M: $15.2 M (2 systems) source GEMIN GLAO study –Conventional AO $2.2 M: $4.5M (2 systems) –MEMS AO $1.7M: $3.5M (2 systems) –Swapping NGAO with legacy AO No estimate done yet

15 Preliminary Recommendations Swapping Keck I/II with NGAO –Hardware costs relatively low –Cost of moving NGAO is higher than fixed NGAO –Appears risky in operation Matching NGAO to Keck –Challenging to match polarization states Two AO systems –AO secondary on each telescope Elegant solution, but costly Utility of a shared capability could offset higher costs –MEMs AO for each IF arm Relatively inexpensive Small footprint allows more mounting/packaging options