North American Energy Standards Board (NAESB) Electric and Gas Industry Coordination in New England: Cold Weather Conditions Houston, Texas February 9,

Slides:



Advertisements
Similar presentations
NAESB Strawman January 24-25, Problem Statement Enough generators must have fuel to meet peak load New England Cold Snap crisis heightened interest.
Advertisements

BG&E’s PeakRewards SM Demand Response Program Successful Approaches for Engaging Customers August 20, 2014.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Presentation Phase I of the Outage Inquiry Board of Commissioners of Public Utilities March 30, 2015.
1 Regulatory Developments and Impacts Involving Electricity Storage in Texas Elizabeth Drews 31 st USAEE/IAEE North American Conference Austin TX, November.
PJM©2014www.pjm.com Winter 2014 Overview & Recent and Upcoming Market Rule Changes Adam Keech Director, Market Operations.
NERC’s Long-Term Reliability Assessment (LTRA) Workshop: Natural Gas Dependency in New England Michael I. Henderson ISO New England Inc.
Reliability Risks and Lessons Learned In The Wake Of The Polar Vortex OPSI Annual Meeting October 14, 2014.
February 25, 2011 Demand Side Working Group EILS Update Mark Patterson ERCOT, Manager Demand Integration.
Understanding Ontario’s Electricity System
Connecticut’s Energy Future Connecticut Energy Advisory Board Conference Hartford, Connecticut December 2, 2004 Kevin Kirby Vice President, Market Operations.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
The Continuing Evolution of U.S. Electricity Markets
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
PJM©2013 Future Generation Mix in PJM Governor’s Conference on Energy Richmond, VA Steven R. Herling Vice President, Planning PJM Interconnection October.
ISO New England Regional Update Wholesale Electricity Markets & State Energy Policy Seminar Connecticut Business & Industry Association December 14, 2010.
Electric Generation Reliability Remarks Before the Pennsylvania Public Utility Commission 2011 Summer Reliability Assessment Meeting June.
OPSI Annual Meeting Bob Hayes Vice President Natural Gas Trading October 13, 2014.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation - ERO Perspective David R. Nevius and Michael J. Assante 2009 NRC Regulatory.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
National Petroleum Council Study Balancing Natural Gas Policy: Fueling the Demands of a Growing Economy September 2003.
1 New England Demand Response Resources: Present Observations and Future Challenges Henry Yoshimura Demand Resources Department ISO New England, Inc. Holyoke,
NPRR 365 Change in Resource Outage Approvals from 8 to 45 or 90 Days Woody Rickerson Director Grid Coordination
George A. Godding, Jr. Director, Management and Communications Office of Market Oversight and Investigations Comments are the speakers and do not necessarily.
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Overview of WECC and Regulatory Structure
Demand Response: Keeping the Power Flowing in Southwest Connecticut Presented by: Henry Yoshimura Manager, Demand Response ISO New England September 30,
Electric Energy Issues and the Region Connecticut Business and Industry Association Stamford, Connecticut December 2, 2004 Kevin Kirby Vice President,
FCC Field Hearing on Energy and the Environment Monday November 30, 2009 MIT Stratton Student Center, Twenty Chimneys Peter Brandien, Vice President System.
“Demand Response: Completing the Link Between Wholesale and Retail Pricing” Paul Crumrine Director, Regulatory Strategies & Services Institute for Regulatory.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Federal Energy Regulatory Commission Role Of The Market Monitor: ISO New England Dr. Hung-po Chao Director, Market Monitoring FERC Open Meeting Washington,
Linking the Wholesale and Retail Markets through Dynamic Retail Pricing Presented by: Henry Yoshimura Manager, Demand Response ISO New England September.
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
Updated 1/28/2011.
RGGI Workshop on Electricity Markets, Reliability and Planning Topic Session 3: RGGI Design, Markets and Reliability – Issues Relating to System Operations.
Reliable Power Reliable Markets Reliable People Transition of Authoritative Documents – Information Session September 2009 Doyle Sullivan Evelyn Kelly.
Chicago Advanced Energy Demand Response & CSP Evolution Kellen Bollettino Comverge Inc. 10/23/14.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
1 Demand Response A 28 Year History of Demand Response Programs for the Electric Cooperatives of Arkansas by Forest Kessinger Manager, Rates and Forecasting.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
DR issues in California discussed last year in March Historical DR in California: some background issues –Twenty years of programs/tariffs I/C and AC cycling.
FERC Staff’s Report on Demand Response and Advanced Metering.
CALIFORNIA ENERGY COMMISSION Outlook for California’s Electricity Supply and Land Use Implications BLM National Lands Conference David Maul Chris Tooker.
Craig Williams Market Interface Manager August 21, 2014 ISAS, Portland, OR.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
NAESB GEH Forum Dan Buckner Director of Fuels Origination and Strategic Development.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
Federal Energy Regulatory Commission 1 Overview of the Federal Energy Regulatory Commission (FERC) Roland W. Wentworth Office of Markets, Tariffs and Rates.
2015 NARUC Winter Meeting Nick Wagner – Iowa Utilities Board 1.
Energy Emergency Alert (EEA) UPDATE F EBRUARY 8, 2011.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
Black Start Service in New England System Operator’s Perspective Robert B. Burke ISO New England Inc. July 23, 2002 IEEE - Chicago, Illinois.
Natural Gas –generation intersection
Energy Day Strawman Proposal
Michael I. Henderson ISO New England Inc.
31st USAEE/IAEE North American Conference
December 9, 2005 Allison DiGrande, External Affairs Department, ISO/NE
Cold Snap Task Force Update
Benefits of New England’s Proposed Capacity Market
New England Resource Adequacy
Alternative ICAP Proposal
Winter Reliability Program Updated
Presentation transcript:

North American Energy Standards Board (NAESB) Electric and Gas Industry Coordination in New England: Cold Weather Conditions Houston, Texas February 9, 2005 Kevin Kirby Vice President, Market Operations ISO New England Inc.

2 ISO New England Overview Private, not-for-profit corporation created in 1997, regulated by Federal Energy Regulatory Commission Independent System Operator –Independent of companies doing business in the market –Independent Board of Directors Established as Regional Transmission Organization for New England – Feb. 1, 2005 Responsible for: –System reliability –Administration and oversight of wholesale electricity markets –Regional transmission tariff –Regional system planning

3 New England’s Electric Power Grid 6.5 million customer meters 350+ generators 8,000+ miles of high voltage transmission lines 4 satellite control centers 12 interconnections to neighboring systems 32,000 MW of installed generating capacity Peak load: –Summer: 25,348 MW –Winter: 22,818 MW ISO and satellite facilities 320 mi. 520 km 400 mi. 650 km

4 January 14-16, 2004 – “Cold Snap” Coldest winter period in New England in 20 years –Sixth coldest temperatures since 1960 –Coldest month for Boston in 100 years Record-setting winter demand for electricity and natural gas First extreme cold weather for new combined cycle gas units Regional gas pipelines had operational restrictions in effect Nearly 30 percent of the region’s generation capacity was unavailable Shortage of operating reserves led to emergency procedures The lights stayed on

5 New England Installed Capacity New England relies heavily on natural gas for power generation Total installed capacity –32,000 MW Approx. 40 percent is gas fired –Gas only: 21.7% –Dual-fuel (primary gas): 15.5% Subject to permit limitations Virtually all of the 10,000 MW of new generation capacity installed since 1999 is gas fired

6 Cold Snap Report ISO issued Interim Cold Snap Report in May –Received stakeholder comments from state regulators and market participants ISO issued Final Cold Snap Report and Management Response in October –23 recommendations formed basis for remedial actions in four areas: System Operations and Reliability; Market Timelines and Flexibility; ISO Operations and Implementation; and Market Monitoring and Analysis

7 Issues Defined Coordination and Timing: –Electric and gas system coordination and communication is critical during coincidental peak demand conditions –Timing of gas and electric trading deadlines are not well aligned –High gas price volatility leads to significant financial risk for gas units Infrastructure: –Natural gas remains “fuel of choice” for new generators –Natural gas pipeline owners are not expected to build infrastructure without commitments for long-term firm contracts –Over the next 10 years, new gas supply into New England may be LNG

8 Stakeholder Process ISO led stakeholder process to put changes in place for winter 2004/05 –Included representation from electric and natural gas industries, state policymakers and state regulators –ISO leveraged existing stakeholder process Fuel Diversity Working Group charged with Electric and Gas Wholesale Initiative to identify major issues and possible solutions Stakeholder meetings in March, May and November –ISO and NEPOOL established Cold Snap Task Force Reviewed market rules and operating procedures Developed straw proposals Stakeholder meetings in March and April Changes effected through new cold weather operating procedure –No changes to market rules

9 Stakeholder Process Meetings with Public Officials –Governors and State Regulators Jan. 2004: Real-time and follow-up briefings February – October: Briefings on new operating procedure –State Air Regulators May – December: Engaged New England Air Regulators as a region and as individual states Briefings on new operating procedure and impact on dual-fuel units Modification of certain permits to incorporate new operating procedure –Federal Energy Regulatory Commission FERC staff participated in stakeholder meetings November: Informational briefing for FERC staff

10 Actions for this Winter Communications and Information –Established regular contact between electric and gas system operators –ISO has new tools to check a generating unit’s availability to operate during extreme winter weather: Access to gas pipelines’ Electronic Bulletin Boards Information on gas pipeline contracts for gas-fired generation (firm vs. interruptible)

11 Cold Weather Operating Procedure Established a new operating procedure for Cold Weather Event Operations (OP20) Final action –August – September: Discussion at NEPOOL committees –October: Reliability Committee approval –November: Participants Committee approval ISO conducted drill –December: Successfully tested communications protocols with market participants and state regulators New operating procedure in effect for two years

12 Cold Weather Operating Procedure Assessment of weather and capacity situation –If the effective temperature is less than or equal to Oº F, then ISO declares: –Cold Weather Watch if capacity margin is at least 1000 MW –Cold Weather Warning if capacity margin is below 1000 MW –Cold Weather Event if capacity margin is below 0 MW requiring emergency actions to deal with a capacity deficiency (OP4)

13 Industry Coordination ISO confers with natural gas pipeline companies at least weekly during the winter –Normally occurs on Thursday –Communication is with individual pipeline companies to avoid antitrust conflicts Review conditions for upcoming week: –Weather and temperature forecasts –Posted notices by pipeline operators –Equipment-related restrictions on gas supply –Overall capacity requirements to serve electric load in New England

14 Evaluating Conditions ISO develops a Seven-day Capacity Margin Forecast each Friday by 11 a.m. –Includes assessment of notices issued by gas pipelines and the potential impact on gas unit availability –Includes assessment of weather forecast and the potential impact of Cold Weather Conditions (temperatures below zero) on gas unit availability ISO develops Cold Weather Conditions analysis by 12 noon on Friday –ISO will classify each day in coming week as: Cold Weather Watch, Warning, Event, or No Cold Weather Conditions –ISO updates analysis daily by 11 a.m.

15 Cold Weather Watch ISO forecasts that sufficient capacity is available A Cold Weather Watch triggers: –Special Notice posted to ISO website –Notification to satellite control centers –Cancellation of Economic Outages* if capacity margin drops below 1000 MW –Notification to state regulators (utility commissions and air regulators) * Market participants may request to remove a generator from service for economic reasons associated with market conditions – subject to recall by ISO.

16 Cold Weather Warning ISO forecasts that sufficient capacity may not be available A Cold Weather Warning triggers: –Request for dual-fuel units to take steps to switch to oil –Notification to state regulators (utility commissions and air regulators) –Cancellation of Economic Outages –Alert demand response resources to prepare for activation if a capacity deficiency is declared

17 Cold Weather Event ISO forecasts that sufficient capacity will not be available – emergency actions are expected A Cold Weather Event triggers: –Shift of the wholesale electric market timeline From 12 noon to 9 a.m. day prior to Operating Day –Commitment analysis by ISO Forecast Office 9 a.m. day prior to Operating Day –Earlier notice to gas units that will be needed Between 9:30 a.m. and 10 a.m. day prior to Operating Day –Daily review of gas nominations to determine if gas units have confirmed gas supplies

18 Cold Weather Event (cont.) A Cold Weather Event triggers: –Request for gas units that can burn oil to switch to oil –Cancellation of Economic Outages –Notification to state regulators (including air regulators), Electric & Gas Operations Committee, and market participants –Notification to NPCC and PJM of potential capacity shortage

19 Longer-term Actions Proposed market design changes in New England –Link capacity payments to generators’ availability to deliver during times of peak demand for electricity –Allow generators greater flexibility in submitting offers in the electricity markets –Encourage alternative resources (e.g. demand response) Increase dual-fuel capability and flexibility

20 Recent Cold Weather Conditions Coldest temperature to-date this winter (New England-wide): –Jan. 18, 2005: 5.7 degrees F (22,100 MW peak demand) Peak demand to-date this winter: –Dec. 20, 2004: 22,635 MW (7.3 degrees F) Conditions have not matched the consecutive days of extreme cold weather of the 2004 Cold Snap

21 First Test of Cold Weather Conditions Operating Procedure: Jan. 21, 2005 Wednesday, Jan. 19, 2005: ISO declares a Cold Weather Watch for Friday –Capacity margin expected to be adequate (greater than 1000 MW) Thursday, Jan. 20: ISO upgrades forecast to a Cold Weather Warning for Friday –Capacity margin expected to be tight (less than 1000 MW) Friday, Jan. 21: Warning Expires without ‘Event’ –Capacity margin at the time of peak: approx. 950 MW –Peak: 21,136 MW –No emergency procedures required (OP4)

22 Effect of New Procedure Signals the market that additional resources may be needed –Days in advance, not hours Improved coordination with generators and gas pipelines helps confirm unit availability in extreme weather conditions Fuel-switching keeps generation online and frees up natural gas for other users –Jan. 21: 750 MW of combined cycle gas-fired units switched to oil Canceling Economic Outages early improves readiness for peak hours Cold Weather Watch and Warning designed to avoid an ‘Event’ situation where emergency procedures are required

23 Questions?

24 For More Information Cold Weather Event Operations (OP20) – > Rules & Procedures > Operating Procedures > ISO New England Operating Procedures > OP20 Seven-Day Forecast – > Data & Reports > Forecasts > 7-Day Forecast ISO Cold Snap Report – > Data & Reports > Special Reports and Studies > January 14-16, 2004 Cold Snap Reports