Development Scenario of Tokamak Reactor for Early Demonstration of Electric Power Generation US/Japan Workshop on Power Plant Studies and Related Advanced.

Slides:



Advertisements
Similar presentations
Physics Basis of FIRE Next Step Burning Plasma Experiment Charles Kessel Princeton Plasma Physics Laboratory U.S.-Japan Workshop on Fusion Power Plant.
Advertisements

Stability, Transport, and Conrol for the discussion Y. Miura IEA/LT Workshop (W59) combined with DOE/JAERI Technical Planning of Tokamak Experiments (FP1-2)
Design Study of Fusion DEMO Plant at JAERI Japan Atomic Energy Research Institute K. Tobita, S. Nishio, M. Enoeda, M. Sato, T. Isono, S. Sakurai, H. Nakamura,S.
- 1 - Parameter Selection of Fusion DEMO Plant at JAERI M. Sato, S. Nishio, K. Tobita, K. Shinya 1), and Demo Plant Team Japan Atomic Energy research Institute,
First Wall Heat Loads Mike Ulrickson November 15, 2014.
ASIPP Zhongwei Wang for CFETR Design Team Japan-US Workshop on Fusion Power Plants and Related Advanced Technologies February 26-28, 2013 at Kyoto University.
PhD studies report: "FUSION energy: basic principles, equipment and materials" Birutė Bobrovaitė; Supervisor dr. Liudas Pranevičius.
Conceptual design of a demonstration reactor for electric power generation Y. Asaoka 1), R. Hiwatari 1), K. Okano 1), Y. Ogawa 2), H. Ise 3), Y. Nomoto.
Discussion on application of current hole towards reactor T.Ozeki (JAERI) Current hole plasmas were observed in the large tokamaks of JT-60U and JET. This.
Study on supporting structures of magnets and blankets for a heliotron-type fusion reactors Study on supporting structures of magnets and blankets for.
Introduction condition of a tokamak fusion power plant as an advanced technology in world energy scenario ○ R.Hiwatari, K.Tokimatsu, Y.Asaoka, K.Okano,
Physics of fusion power Lecture 14: Anomalous transport / ITER.
Neutronics Analysis on a Compact Tokamak Fusion Reactor CREST Q. HUANG 1,2, S. ZHENG 2, L. Lu 2, R. HIWATARI 3, Y. ASAOKA 3, K. OKANO 3, Y. OGAWA 1 1 High.
January 8-10, 2003/ARR 1 Plan for Engineering Study of ARIES-CS Presented by A. R. Raffray University of California, San Diego ARIES Meeting UCSD San.
1 1. Cover Page S. NISHIO Japan Atomic Energy Agency, Naka Fusion Institute, Naka-shi, Ibaraki-ken , Japan US - Japan.
Perspectives on Fusion Electric Power Plants Farrokh Najmabadi University of California, San Diego, La Jolla, CA FPA Annual Meeting December 13, 2004 Washington,
Optimization of Stellarator Power Plant Parameters J. F. Lyon, Oak Ridge National Lab. for the ARIES Team Workshop on Fusion Power Plants Tokyo, January.
2010 US-Japan Workshop on Fusion Power Plants and Related Advanced Technologies at UCSD CA, US, Feb.23-24, Commissioning scenario including divertor.
Contributions of Burning Plasma Physics Experiment to Fusion Energy Goals Farrokh Najmabadi Dept. of Electrical & Computer Eng. And Center for Energy Research.
Page 1 of 14 Reflections on the energy mission and goals of a fusion test reactor ARIES Design Brainstorming Workshop April 2005 M. S. Tillack.
Impact of Liquid Wall on Fusion Systems Farrokh Najmabadi University of California, San Diego NRC Fusion Science Assessment Committee November 17, 1999.
Characteristics of Commercial Fusion Power Plants Results from ARIES-AT Study Farrokh Najmabadi Fusion Power Associates Annual Meeting & Symposium July.
Optimization of a Steady-State Tokamak-Based Power Plant Farrokh Najmabadi University of California, San Diego, La Jolla, CA IEA Workshop 59 “Shape and.
US-Japan Workshop on Fusion Power Plants and Related Advanced Technologies High Temperature Plasma Center, the University of Tokyo Yuichi OGAWA, Takuya.
IPP Stellarator Reactor perspective T. Andreeva, C.D. Beidler, E. Harmeyer, F. Herrnegger, Yu. Igitkhanov J. Kisslinger, H. Wobig O U T L I N E Helias.
DEMO Parameters – Preliminary Considerations David Ward Culham Science Centre This work was jointly funded by the EPSRC and by EURATOM.
Physics Issues and Trade-offs in Magnetic Fusion Power Plants Farrokh Najmabadi University of California, San Diego, La Jolla, CA APS April 2002 Meeting.
Magnetic Fusion Power Plants Farrokh Najmabadi MFE-IFE Workshop Sept 14-16, 1998 Princeton Plasma Physics Laboratory.
Highlights of ARIES-AT Study Farrokh Najmabadi For the ARIES Team VLT Conference call July 12, 2000 ARIES Web Site:
Role of ITER in Fusion Development Farrokh Najmabadi University of California, San Diego, La Jolla, CA FPA Annual Meeting September 27-28, 2006 Washington,
Recent Results on Compact Stellarator Reactor Optimization J. F. Lyon, ORNL ARIES Meeting Sept. 3, 2003.
Y. ASAOKA, R. HIWATARI and K
1 Lecture #24 Fusion ENGR 303I. 2 Outline Fusion →Definition →Atoms usually used Previous attempts at fusion Current attempts at fusion →International.
Simple Core-SOL-Divertor Model To Investigate Plasma Operation Space Joint Meeting of US-Japan JIFT Workshop on Theory-Based Modeling and Integrated Simulation.
Indian Fusion Test Reactor
Power Extraction Research Using a Full Fusion Nuclear Environment G. L. Yoder, Jr. Y. K. M. Peng Oak Ridge National Laboratory Oak Ridge, TN Presentation.
Y. Sakamoto JAEA Japan-US Workshop on Fusion Power Plants and Related Technologies with participations from China and Korea February 26-28, 2013 at Kyoto.
Early Realization of Fusion Electricity Target and Path by Kunihiko OKANO Central Research Institute of Electric Power Industry (CRIEPI)
Case Study of Roadmap to Tokamak Demo Reactor in Japan International Workshop MFE Roadmapping in the ITER Era September 7, 2011 Princeton, New Jersey,
Status and Prospects of Nuclear Fusion Using Magnetic Confinement Hartmut Zohm Max-Planck-Institut für Plasmaphysik, Garching, Germany Invited Talk given.
Fusion: Bringing star power to earth Farrokh Najmabadi Prof. of Electrical Engineering Director of Center for Energy Research UC San Diego NES Grand Challenges.
Page 1 of 11 An approach for the analysis of R&D needs and facilities for fusion energy ARIES “Next Step” Planning Meeting 3 April 2007 M. S. Tillack ?
October 27-28, 2004 HAPL meeting, PPPL 1 Thermal-Hydraulic Analysis of Ceramic Breeder Blanket and Plan for Future Effort A. René Raffray UCSD With contributions.
Managed by UT-Battelle for the Department of Energy Stan Milora, ORNL Director Virtual Laboratory for Technology 20 th ANS Topical Meeting on the Technology.
Neutronics Analysis for K-DEMO Blanket Module with Helium coolant June 26, 2013 Presented by Kihak IM Prepared by Y.S. Lee Fusion Engineering Center DEMO.
ARIES “Pathways” Program Farrokh Najmabadi University of California San Diego ARIES brainstorming meeting UC San Diego April 3-4, 2007 Electronic copy:
Design study of advanced blanket for DEMO reactor US/JP Workshop on Fusion Power Plants and Related Advanced Technologies 23 th -24 th Feb at UCSD,
1 1 by Dr. John Parmentola Senior Vice President Energy and Advanced Concepts Presented at the American Security Project Fusion Event June 5, 2012 The.
ARIES-AT Physics Overview presented by S.C. Jardin with input from C. Kessel, T. K. Mau, R. Miller, and the ARIES team US/Japan Workshop on Fusion Power.
Programmatic issues to be studied in advance for the DEMO planning Date: February 2013 Place:Uji-campus, Kyoto Univ. Shinzaburo MATSUDA Kyoto Univ.
1 Neutronics Assessment of Self-Cooled Li Blanket Concept Mohamed Sawan Fusion Technology Institute University of Wisconsin, Madison, WI With contributions.
1 Neutronics Parameters for the Reference HAPL Chamber Mohamed Sawan Fusion Technology Institute University of Wisconsin, Madison, WI With contributions.
Burning Simulation and Life-Cycle Assessment of Fusion Reactors Kozo YAMAZAKI Nagoya University, Nagoya , Japan (with the help of T. Oishi, K.
Fusion Nuclear Science - Pathway Assessment C. Kessel, PPPL ARIES Project Meeting, Bethesda, MD July 29, 2010.
ITER STEADY-STATE OPERATIONAL SCENARIOS A.R. Polevoi for ITER IT and HT contributors ITER-SS 1.
Characteristics of Transmutation Reactor Based on LAR Tokamak Neutron Source B.G. Hong Chonbuk National University.
JT-60U -1- Access to High  p (advanced inductive) and Reversed Shear (steady state) plasmas in JT-60U S. Ide for the JT-60 Team Japan Atomic Energy Agency.
PERSISTENT SURVEILLANCE FOR PIPELINE PROTECTION AND THREAT INTERDICTION International Plan for ELM Control Studies Presented by M.R. Wade (for A. Leonard)
US-Japan Workshop on Fusion Power Plants and Related Advanced Technologies February 23-24, 2010 at USCD in USA Platform on integrated design of fusion.
Improved performance in long-pulse ELMy H-mode plasmas with internal transport barrier in JT-60U N. Oyama, A. Isayama, T. Suzuki, Y. Koide, H. Takenaga,
045-05/rs PERSISTENT SURVEILLANCE FOR PIPELINE PROTECTION AND THREAT INTERDICTION Technical Readiness Level For Control of Plasma Power Flux Distribution.
20th IAEA Fusion Energy Conference, 2004 Naka Fusion Research Establishment, Japan Atomic Energy Research Institute Stationary high confinement plasmas.
ZHENG Guo-yao, FENG Kai-ming, SHENG Guang-zhao 1) Southwestern Institute of Physics, Chengdu Simulation of plasma parameters for HCSB-DEMO by 1.5D plasma.
US Participation in the
The European Power Plant Conceptual Study Overview
Can We achieve the TBR Needed in FNF?
Trade-Off Studies and Engineering Input to System Code
Farrokh Najmabadi Professor of Electrical & Computer Engineering
Martin Peng, ORNL FNST Meeting August 18-20, 2009
Presentation transcript:

Development Scenario of Tokamak Reactor for Early Demonstration of Electric Power Generation US/Japan Workshop on Power Plant Studies and Related Advanced Technologies With EU Participation January 200 6, 584 EBUII (Engineering Building Unit II), UC San Diego, La Jolla, CA R.Hiwatari, Y.Asaoka, K.Okano, T.Kuroda a), S.Mori a), K.Shinya b) and Y.Ogawa c) Nuclear Technology Research Laboratory, Central Research Institute of Electric Power Industry (CRIEPI), Komae Japan a) Kawasaki Heavy Industries, Ltd., Tokyo, Japan b) AITEL Corporation, Yokohama, Japan c) The University of Tokyo, Kashiwa, Japan 1

Outline 1.Background and Objectives Why is a development scenario required and What is its objectives ? 2.A development scenario of ITER, Demo-CREST and CREST Characteristics of this development scenario, ITER, Demo-CREST, and CREST 3.Development issues on plasma performance What is the critical issue on the core plasma performance and to what extent it has to be developed in each step? 4.Development issues on reactor technology What is the critical issue on the reactor technology and to what extent it has to be developed in each step ? 5.Role of each development program Specification of the role of each development program (ITER, IFMIF, DEMO, inevitable support program) in this development scenario 6.Summary 2

Consistent ? Background Development Priority Development Time ScheduleDevelopment Goal Technological and physical Issue to be completed Development Scenario Specification of the role of each development program Effective Development Road Map to Realize the Fusion Energy Development scenario of tokamk fusion power plant Experimental Reactor ITER Feasibility of net electric power generation From 2015 to 2035 Demonstration Reactor Demonstration of net electric power generation In 2030~2040 Commercial Plant Introduction into market In 2050~ Tokamak devices JT-60U, JET etc Feasibility of burning plasma From 1980’s to present In this study How about the development scenario after the ITER ? 3

Objectives Key issues of development scenario 1.Development Goal Reactor type (Plasma Physics) Tokamak → variation of aspect ratio, Max.Bt (Helical → variation of plasma configuration) (Laser → central spark ignition, fast ignition) Engineering Blanket → Coolant, Breeder Maintenance scheme → sector type, module type 2.Development time schedule and the role of Demo When is the commercial plant ? → 2050’s is assumed When is the demo ? → available plasma performance and technology → the role of demo toward the commercial plant Now, the role of development scenario is to show several development path to fusion energy and its critical issues. (If possible, select the master plan and feed back to ITER and other R&D project). A~3.4(ITER-like), Btmax=13T~16T Water cool, solid breeder Sector type In 2030’s just after or during ITER Those help us to propose the appropriate next project when the ITER is completed. 4

Development scenario of tokamk fusion power plant Experimental Reactor ITER Feasibility of net electric power generation From 2015 to 2035 Tokamak devices JT-60U, JET etc Feasibility of burning plasma From 1980’s to present Overall Feature of Development Scenario The demonstration of electric power generation in the 2030’s is focused on. That means Demo-CREST has to be constructed just after or during the ITER project Testing by ITER is an important policy in this development scenario of Demo-CREST and CREST. This leads to the selection of A=3.4. This development scenario is characterized by a advanced tokamak plasma reactor with a water cooled RAF (Reduced Activated Ferritic Steel) blanket system. Commercial Plant CREST Introduction into market In 2050’s Demonstration Reactor Demo-CREST Demonstration of net electric power generation In 2030’s 5

Principles for the Demo-CREST Design 1.to demonstrate electric power generation as soon as possible in a plant scale, with moderate plasma performance which will be achieved in the early stage of the ITER operation, and with foreseeable technologies and materials (Demonstration Phase OP1~OP4) 2. to show a possibility of an economical competitiveness with advanced plasma performance and high performance blanket systems, by means of replacing breeding blanket from the basic one to the advanced one (Development Phase OP4, OPRS) Figure:Bird’s-eye of Demo-CREST CS Coil TF Coil PF Coil Blanket Maintenance Port Divertor Maintenance Port Cryostat Shield Demonstration Plant : Demo-CREST OP1OP2OP3OP4OPRS R (m) / A 7.25 / 3.4 // 1.85/ 0.35 q min /q 95 -/5.0-/ / 6.5 NN HH fn GW P b (MW) P f (MW) P enet (MWe) Basic Blanket Advanced Blanket

Commercial Plant : CREST Figure:Bird’s-eye of CREST R (m) /A5.4 / 3.4  /  2.0 / 0.5 Bt (T) / Ip (MA) 5.6 / 12 q o / q min / q / 2.4 / 4.3 NN 5.5 HH 1.5 fn GW 1.3 f bs 0.83 P b (MW) / E b (MeV) 97 / 2.5 P f (MW) 2970 P e /P enet (MWe) 1385 /1163 The aim of CREST design is to show the typical development goal to get the economic competitiveness. High beta  N ~5.5 Reversed Shear Profile control and high speed plasma rotation High efficiency  th >40% High thermal efficiency  th ~41% Advanced ferritic steel component with water cooled system High  and   ~2.0,  ~0.5 Active and passive feedback coils Quick Maintenance Full sector removal design for blanket (14 sectors) High availability (>80%) 7

ITER R= 6.2m, a=2.0m Bt max =13 T Demo-CREST R=7.3m, a=2.13m Bt max =16 T CREST R= 5.4m,a=1.59m Bt max =13T  th > 40% Demonstration Phase  th >30% Development Phase  th > 40% ITER Reference Plasma  N ~2.0 To get the Outlook for the DEMO 30MWe (Electric break-even) ITER Advanced Plasma  N =3.4 To become the promising candidate of alternative energy source 490MWe850MWe CREST-like Advanced Plasma  N > MWe1163MWe In the demonstration phase of Demo-CREST, the plasma performance parameters (  N, HH, fn GW ) completed in ITER are applied to the Demo-CREST operation, step by step In the development phase, the advanced blanket system for higher thermal efficiency enable to increase the net electric power, and conducting walls installed in this blanket system break the road to the more advanced plasma performance such as  N >4.0. Table:Electric power and technology advancement in Development scenario by CRIEPI Reactor technology advancement Plasma advancement Development Scenario of ITER, Demo-CREST, CREST 8

Development Issue on Plasma Performance ITERDemo-CREST CREST Ref.HPSSOP1OP4OPRS NN HH fn GW As for  N and HH, the Demo-CREST parameters are possibe in this HPSS ITER scenario, but fn GW of OP4 for Demo-CREST is a little larger than that of ITER. Hence, the physics of density limit and its attainable region should be examined in the ITER program In the development phase of Demo-CREST, the  N value is larger than the ideal wall limit of the present ITER design (  N ~3.8). Hence, this advanced plasma region should be explored, by other support devices and by itself, and this is why we think Support device is required. In case that ITER would be improved to achieve  N >4.0, of course, such high performance plasma should be demonstrated in the ITER burning plasma. Finally, the increase of plasma shape parameters from (k~1.85,  ~0.35) to (k~2.0,  ~0.5) is required to achieve  N ~5.0, however, several improvement for positional instability is supposed to be required in the present design of Demo-CREST 9

Development Issue on Plasma MHD Control In the demonstration phase, plasma performance is improved from OP1 to OP4, assisted by the conducting wall at r wall =1.3a just behind the blanket modules. NTM probably appears even in the low  N region corresponding to OP1 and OP2 When the plasma performance exceeds the no wall limit (OP3, OP4, OPRS), the suppression of RWM has to be considered. The increase of plasma shape parameters from (  ~1.85,  ~0.35) to (  ~2.0,  ~0.5) is required to achieve  N ~5.0 with r wal l=1.15a, however, several improvement for positional instability is supposed to be required in the present design of Demo-CREST 10

Development Issue on Heat and Particle Control Peak power load on the targets is limited to q div <10MW/m 2 One of the key parameters is the upstream SOL density ns One of the control issues is increase of ns without the degradation of core plasma performance. The radiation power required for q div <10MW/m 2 and its fraction to total heating power gradually increase from ITER, Demo-CREST (from OP1 to OP4), to CREST. Controllability of n s and impurity seeding level consistent with core plasma performance has to be precisely examined in ITER, and its operational window should be mapped out for the next step devises. □ : radiation fraction ○ : radiation power Design condition, n s ~2/3 enables to keep q div <10MW/m 2 by using impurity seeding in the SOL region in the design of Demo-CREST, CREST The ITER design is carried out with the conventional case of n s ~1/3 11

Development Issue on Superconducting Coil Figure Operating points of superconducting coils constructed so far and the target for fusion demo plant[N.Koizumi, et al., 20 th IAEA Fusion Energy Conf. IAEA-CN116-FT/P1-7] In the Demo-CREST design, maximum performance of super conducting coil is 16T 10MA/m 2 for TF coils (15MA/m 2 for CS coils), which is higher maximum magnetic field strength (B tmax ) with the same coil current density (Jsc) as the ITER design Demo-CREST CS Demo-CREST TF In the CREST design, B tmax ~13T, but higher Jcs (twice of the ITER design) is required. CREST CS CREST TF Nb 3 Al has a good potential 12

Development Issue on Blanket Concept Demo-CREST Blanket BasicAdvanced Structure materialRAFODS-RAF Breeding materialLi 2 TiO 3 Neutron multiplierBe(<773K)Be(<873K) Coolant Water (603K,15MPa) Water (773K,25MPa) Local TBR Thermal efficiency>30%>40% Note Conducting wall Basic blanket Advanced blanket The same outlet coolant condition (15MPa, 603K) as proposed in ITER TBM is applied, and this condition accepts the large breeding zone and the small cooling channel one in the blanket, because of relatively low temperature. In this blanket concept, the local TBR is estimated at 1.48, which allows the net TBR larger than 1.1. In the development phase of Demo-CREST, an advanced coolant condition (25MPa, 773K) with supercritical water, which is also proposed in ITER TBM, is applied. The local TBR of this advanced blanket system is TBR~1.34. Whether this local TBR is enough or not should be conformed in the previous demonstration phase. 13

Development Issue on Plasma Control Device ITER Demo-CREST CREST Beam energy E b ~1.0 MeV System efficiency  NBI =30~40% Gyrotron frequency f~170Mz for ECCD Steady state operation of the NBI system and the EC one Beam energy E b ~1.5 MeV for feasible current control. System efficiency  NBI >50% by developing a plasma neutralizer Gyrotron frequency f~300Mz for ECCD Beam energy E b ~2.5 MeV 14

Development Issue on Maintenance Method The handling device for shielding plugs in ITER can handle the weight of 40 tons. The full sector removal scheme for blanket and divertor systems is applied to the CREST design. The weight of the one sector (1/14 of the torus) is estimated at about 250 tons. The handling device is considered as a device scaled up form the one for the ITER shielding plug. The maximum weight to be handled in Demo-CREST is 130 tons of the outer shield The full sector removal scheme is very effective to the plant availability. In the CREST design, the plant availability achievable to more than 80% including an unexpected outage period. However, a system for extraction and attachment of the full sector with precise alignment has to be developed and demonstrated like the ITER maintenance system. A larger TF coil A heavier full sector 15

Development Issue on Structure Material Figure Design windows fo the structural materials for the DEMO reactor blanket. [M.Seki, et al., Fusion Science and Technology 42(2002)50] For the demonstration phase of Demo-CREST, the reduced activation ferritic steel (RAF) has a good potential, however, it should be noted that the neutron fluence experienced in ITER is not enough for Demo-CREST, because of neutron fluence 6~9 MWa/m2 (2.25FPY) more than that of ITER. Hence, the IFMIF program is indispensable. In the development phase of Demo-CREST, the oxide dispersion strengthened reduced activation ferritic steel (ODS-RAF) is probably required as the structure material for higher thermal efficiency. The advanced blanket system made of ODS-RAF also should be demonstrated in the ITER TBM program. In the CREST design, the design condition becomes more severe More advancement up to 10~15 MWa/m 2 (2.25FPY) is required. 16

Role of Each Development Program for Demo-CREST Demonstration Phase (1) Development Issues for Demo-CREST demonstration phase ITER NTM stabilization in a burning plasma RWM n=1 mode stabilization by both of the plasma rotation and control coils Demonstration of a steady state burning plasma operation fn GW ~1.0 with advanced plasma Small non-inductive current ramp up of f nonramp ~0.2 Accessibility for high n s ~0.67 with the radiated SOL-divertor plasma Support Device Steady state operation technique applicable to demonstrate electric power generation Demo-CREST Plasma Physics Issues 17

Role of Each Development Program for Demo-CREST Demonstration Phase (2) Development Issues for Demo-CREST demonstration phase ITER Outlet coolant condition (15MPa, 600K) of TBM for  th =30% Assured prospect for self-sustainment of tritium IFMIF Demonstration of RAF for neutron fluence up to 6~9 MWa/m 2 region Other R&D 16T 15MA/m 2 Nb 3 Al coil for CS coil (16T 10MA/m 2 for TF coil) Development of RAF 1.5MeV beam energy of NBI High frequency gyrotron f>300MHz for ECCD Scale up of handing device up to 130ton weight and maintenance scheme Effective tritium handling technique Waste management technique Demo- CREST Engineering Issues 18

Role of Each Development Program for Demo-CREST Development Phase (1) Development Issues for Demo-CREST demonstration phase ITER Control technique for precise current alignment of reversed shear plasmas fn GW >1.0 with the advanced plasma performance Support Device RWM n>1.0 stabilization by both of the plasma rotation and control coils for  N >3.5 Demo-CREST Plasma Physics Issues 19

Role of Each Development Program for Demo-CREST Development Phase (2) Development Issues for Demo-CREST demonstration phase ITER Outlet coolant condition (25MPa, 780K) of TBM for  th =40% IFMIF Demonstration of ODS-RAF for neutron fluence up to 6~9 MWa/m 2 region Other R&D Development of ODS-RAF with handling technique of supercritical water Demo- CREST Assured margin of local TBR for net TBR TBR net >1.1 Engineering Issues 20

Role of Each Development Program for CREST (1) Development Issues for Demo-CREST demonstration phase ITER Substantial non-inductive current ramp-up of f nonramp ~0.5 Support Device RWM n>1.0 stabilization only by the plasma rotation for  N >4.0 Control technique for positional instability close to  ~2.0 and  ~0.5 Demo-CREST Accessibility for  N ~5.0 of steady state burning operation Plasma Physics Issues 21

Role of Each Development Program for CREST (2) Development Issues for Demo-CREST demonstration phase ITER IFMIF Demonstration of ODS-RAF for neutron fluence up to 10~15MWa/m 2 region Other R&D 13T 20MA/m 2 Nb 3 Al coils 2.5MeV beam energy of NBI Sector removal maintenance scheme (sector weight is 250ton) Demo- CREST Demonstration of the advanced blanket system for  th >40% and TBR net >1.1 Engineering Issues 22

Summary We proposed the development scenario of ITER, Demo-CREST, and CREST aiming at the early realization of net electric power generation. This development scenario is characterized by a highly advanced tokamak plasma reactor with a water cooled RAF blanket system. As for plasma performance, MHD control for high plasma performance and heat and particle control are mainly discussed, and the role of each device (ITER, Demo-CREST, Support device) is specified, respectively. The typical development issue on the reactor technology (SC coils, blanket systems, plasma control devices, maintenance systems, structure materials) for Demo-CREST and CREST is also picked up, respectively. Such specification of each development role in the development scenario is the starting point to structure the effective development strategy of fusion energy, and this is very helpful to understand the development priority. 23