Testbeam 2010 with CAPTAN System Jianchun Wang Syracuse University.

Slides:



Advertisements
Similar presentations
A “BTeV” Hybrid Pixel Telescope for MTest David Christian May 4, 2007.
Advertisements

Collection Of Plots for A Testbeam Paper. List of Possible Plots R/Phi resolution, charge sharing, noise etc. Noise performance and few Landau distributions.
D. Elia, INFN BariALICE Offline Week - June Recent results from SPD beam test D. Elia, R. Santoro INFN Bari ALICE Collaboration - SPD Group.
Jaap Velthuis, University of Bristol SPiDeR SPiDeR (Silicon Pixel Detector Research) at EUDET Telescope Sensor overview with lab results –TPAC –FORTIS.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
FNAL TB09 Plots Alessandra Borgia Syracuse Unviersity Marina Artuso, Jianchun Wang, Ray Mountain January 20, 2010.
Update on Analysis of FNAL TB09 Jianchun Wang for the group Syracuse Univesity Jan 29 th,2010.
Standalone VeloPix Simulation Jianchun Wang 4/30/10.
Pixel Testbeam at Fermilab Jianchun Wang Syracuse University.
Slide 1 sCVD Diamond for the CMS Pixel Detector May 2004 R.Stone, Rutgers J.Doroshenko, L.Perera, S.Schnetzer RD42 Collaboration Meeting Overview.
VELO Testbeam 2006 Tracking and Triggering Jianchun (JC) Wang Syracuse University VELO Testbeam and Software Review 09/05/2005 List of tasks 1)L0 trigger.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
Jianchun Wang Marina Artuso Syracuse University 11/06/00 MC Simulation of Silicon Pixel Detector.
LHCb VELO Upgrade Medipix/Timepix PR01 Testbeam
FPIX0 Electronic Test Marina Artuso Paul Gelling Jianchun Wang  The system works fine with charge injection calibration  Gain curve, threshold, and noise.
Phase 2 pixel electronics 21 May 2015 – CERN, Geneva First look at data compression Konstantin Androsov – INFN Pisa & University of Siena Massimo Minuti.
Vth INFIERI workshop April 2015 – CERN, Geneva First look at data compression Konstantin Androsov – INFN Pisa & University of Siena Massimo Minuti – INFN.
Calibration, simulation and test-beam characterisation of Timepix hybrid-pixel readout assemblies with ultra-thin sensors International Workshop on Future.
Summary of CMS 3D pixel sensors R&D Enver Alagoz 1 On behalf of CMS 3D collaboration 1 Physics Department, Purdue University, West Lafayette, IN
First Results from Cherwell, a CMOS sensor for Particle Physics By James Mylroie-Smith
SLHC Sensors at Meson Test Ryan Rivera ESE/CD, Fermilab All-Experimenter’s Meeting April 19, 2010.
SPiDeR  SPIDER DECAL SPIDER Digital calorimetry TPAC –Deep Pwell DECAL Future beam tests Wishlist J.J. Velthuis for the.
15 Dec 2010 CERN Sept 2010 beam test: Sensor response study Chris Walmsley and Sam Leveridge (presented by Paul Dauncey) 1Paul Dauncey.
Status of Projectile Spectator Detector A.Kurepin (Institute for Nuclear Research, Moscow) I. Introduction to PSD. II. Conception and design. III. Development.
Test-beam Results for the CMS Forward Pixel Detector Carsten Rott Daniela Bortoletto, Gino Bolla, Amitava Roy Purdue University 28 April 2001.
David Emschermann CBM Collaboration Meeting - GSI – 12/04/2010 TRD geometry in CBMroot and conclusions for detector module design David Emschermann Institut.
3D-FBK pixel sensors with CMS readout: first tests results M. Obertino, A. Solano, A. Vilela Pereira, E. Alagoz, J. Andresen, K. Arndt, G. Bolla, D. Bortoletto,
Summary of CMS 3D pixel sensors R&D Enver Alagoz 1 On behalf of CMS 3D collaboration 1 Physics Department, Purdue University, West Lafayette, IN
11 Wish list for July May testbeam Keep It (Stupidly) Simple..
CEA DSM Irfu 20 th october 2008 EuDet Annual Meeting Marie GELIN on behalf of IRFU – Saclay and IPHC - Strasbourg Zero Suppressed Digital Chip sensor for.
Beam Tests of 3D Vertically Interconnected Prototypes Matthew Jones (Purdue University) Grzegorz Deptuch, Scott Holm, Ryan Rivera, Lorenzo Uplegger (FNAL)
Fermilab Test Beam analysis for CMS GE1/1-III GEM detector Aiwu Zhang, V. Bhopatkar, M. Hohlmann, A.M. Phipps, J. Twigger Florida Institute of Technology.
Pixel Offline Study Jianchun Wang Syracuse University 11/05/04, Pixel testbeam meeting.
Report on CMS 3D sensor tests Enver Alagoz 1 On behalf of CMS 3D collaboration 1 Physics Department, Purdue University, West Lafayette, IN
Forward Pixel Beamtest Analysis Carsten Rott Purdue University Januar 24, 2001.
IEEE October 16-22, 2004 First Look at the Beam Test Results of the FPIX2 Readout Chip for the BTeV Silicon Pixel Detector First Look at the Beam Test.
CMS Pixel upgrade test-beam summary (T992) Lorenzo Uplegger, Ryan Rivera for the CMS pixel upgrade collaboration 1.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
CMS pixel telescope at MTEST 1 A. Kumar, S. Kwan, A. Prosser, R. Rivera, M. Turqueti, L. Uplegger.
Test of Single Crystal Diamond Pixel Detector at Fermilab MTEST Simon Kwan Fermilab April 28, 2010.
FNAL Beam test results A. Zhang, V. Bhopatkar, M. Phipps, J. Twigger, M. Hohlmann HEP Group A, Florida Tech 2013/11/18.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
Status of 2009 Testbeam Paper and testbeam analyses Testbeam paper (2009) Some news from
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Tracking at the Fermilab Test Beam Facility Matthew Jones, Lorenzo Uplegger April 29 th Infieri Workshop.
News – 22 September 2010 Still more refinements on the understanding of the timepix calibration  We are now at the ~20 electron level of precision  Propose.
Irradiated 3D sensor testbeam results Alex Krzywda On behalf of CMS 3D collaboration Purdue University March 15, 2012.
FBK 3D CMS pixel sensors preliminary lab measurements E. Alagoz 1, A. Krzywda 1, D. Bortoletto 1, I. Shipsey 1, G. Bolla 1, and G. F. Dalla Betta 2, M.
Timepix test-beam results and Sensor Production Status Mathieu Benoit, PH-LCD.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
CdTe prototype detector testing Anja Schubert The University of Melbourne 9 May 2011 Updates.
BTeV Beam Test Results Jianchun Wang Syracuse University Representing J.A. Appel, J.N. Butler, G. Cardoso, H. Cheung, G. Chiodini, D.C. Christian, E.E.
Pixel Sensors for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
RD42 Status Report W. Trischuk for the RD42 Collaboration LHCC Meeting – June 12, 2013 Development of CVD Diamond Tracking Detectors for Experiments at.
Aras Papadelis. NIKHEF 1 Aras Papadelis B-physics meeting 15/ Results from the Nov2004 VELO test beam (and what followed…)
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Pixel Offline Status Jianchun Wang Syracuse University 10/28/04, Pixel testbeam meeting.
EUTelescope Testbeam Analysis: Summer 2014
Digital readout architecture for Velopix
Planes, Telescope, System
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
The Status of the Data Analysis of the Beam Test at FZJ
Lars Reuen, 7th Conference on Position Sensitive Devices, Liverpool
BTeV Pixel Silicon Detector
Test Beam Measurements october – november, 2016
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
Status of CMS-PPS timing detectors
Beam Test Results for the CMS Forward Pixel Detector
Presentation transcript:

Testbeam 2010 with CAPTAN System Jianchun Wang Syracuse University

Telescope Setup 2 Courtesy: Ryan Rivera

Telescope Configuration 3 Type Thickness (  m) Size (mm 2 ) HVComment TelescopeN-type Si300 ? 16 x x DUT sCVD5004x 4250 At 0 , 10 , & 20 , HV scan at 20  MCZ Si300 ?16 x , threshold scan Purdue 3D2008x8403d_4e_wb5_8, failed 2008x8403d_2e_wb216_6, HV & threshold scan 2858x8403d_2e_wb5_2, HV & threshold scan DUT YY 120 GeV proton beam Scint X Z Y XX YY  : –22  : +22  : +22  : –22  : 0, –10 , –20  Lab frame

Pixel Planes 4  Y X Looking from upstream Plane Station/Plaquette Z (mm)Comment RyanData 01/10/ Row/Y, as shown, rotated by  =+22  11/00/ Row/Y, flipped, 0 left-top, rotated by  =+22  20/ Row/X, as shown, rotated by  =–22  30/ Row/X, flipped, 0 right-top, rotated by  =–22  44/0 0 Row/X, as shown, rotated by  =0 , –10 , –20  (for 3D 00 flipped down, for MCZ it is 2x3) 53/02/226.6 Row/X, as shown, rotated by  =+22  63/12/327.4 Row/X, flipped, 0 right-top, rotated by  =+22  72/ Row/Y, as shown, rotated by  =–22  82/ Row/Y, flipped, 0 left-top, rotated by  =–22  Row/Y Row / X Viewing with sensor in front

PSI46 Readout Chip 5 Ultra-black black last DAC C0 C1 A0 A1 A2 signal CMS PSI46 readout chip  Zero suppressed analog signals, serial readout.  Double column logic.  Use 6 levels of analog signals for addressing  2 digs for double column: 0-25 (max 35).  3 digs for row x 2 column: (max 215). 52 col 80 row 9800  m 7900  m

Sensor Geometry 6 Size (row) = 100x = 8100  m Size (col) = 150x50+300x2 = 8100  m  m 100  m  m 150  m 150  m 300  m 2X3 Module

Purdue 3D Sensors 7

CAPTAN System 8 PCB – Processing and Control Board DCB – Data Conversion Board PDB – Power Distribution Board It is designed to be flexible to include other readout electronics.

Hit Data Format 9 Bit Byte3210 Item bit ItemTrigger Station Bit Byte7654 Item bit ItemAdcColumnAdccRowplaquetteChip Bit Byte before4567 Item bit ItemPlaquetteChipRowColumnAdc Before Reordering Bytes After Reordering Bytes Bit Byte before0123 Item bit ItemStationTrigger

Hit Maps 10 X in Plane Frame (mm) Y in Plane Frame (mm) X Z/beam Y/up Lab frame X Z Y Plane frame beam Diamond DUT at 20 

Cluster Size 11 Too many single pixel clusters. The resolution can not be as good as what was claimed. Thresholds are not the same for different telescope planes. Threshold needs to be further reduced. Gain, threshold calibrations are not available yet. Number of Pixels in a Cluster Diamond DUT

Charge Distribution 12 Gain calibration need more work. Gain for diamond seems wrong. This just give you an idea on how they work. Charge (Ke) Diamond DUT

DX 13 X – X 2 in Lab Frame (mm) Center aligned, no angle alignment yet

DY 14 Y – Y 0 in Lab Frame (mm)

Form Raw Tracks 15 Number of Raw tracksNumber of Hits Per Track Track window is quite lose for two reasons: Detectors are not aligned yet. Want to include interaction tracks.

Summary  Different radiation hard sensors are tested: sCVD diamond, MCZ, 3D.  We are more interested in the diamond detector. Properties extracted from this test beam will be important inputs to our upgrade simulation.  Get familiar with the CAPTAN system, get offline analysis package ready. We may have our own detector tested with the system in near future. 16

PSI Signal and Addressing 17 For each hit pixel, the readout chip produces a signal at six levels. The first five encode the pixel address. The 6 th represents the analog signal from the pixel. The first two encode the double column address. The next three encode the pixel address in that double column. Most significant bit for the double column address (C0) Least significant bit for the double column address (C0) Least significant bit for the pixel address in the double column (A0) Most significant bit for pixel address in the double column (A2) A1 Analog signal from the pixel (data) One pixel hit

18

CMS PLT Diamond Sensor  CMS PLD 500 um thick sCVD  Physical size 4.7 x