Update of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Frame design Status TB-SWG May 2005 Presented by K. Ioki Prepared by M. Morimoto VV and Blanket Division, ITER Garching ITER.
MICE Collaboration meeting at RAL 26 th Oct ~ 29 th Oct, 2004 Wrap up on Radiation Shielding Module Design Stephanie Yang 26 th October, 2004.
April 23-24, 2009/ARR 1 Proposed Effort Over the Next 1-2 Years on ARIES-DB DCLL A. René Raffray, Siegfried Malang, Xueren Wang University of California,
Coolant Connections to the DCLL Blanket S. Malang, Dara Navaei, Xueren Wang ARIES Project MeetingARIES Project MeetingUCSD January 23-24, 2012January 23-24,
September 15-16, 2005/ARR 1 Status of ARIES-CS Power Core and Divertor Design and Structural Analysis A. René Raffray University of California, San Diego.
P ROGRESS ON THE O VERALL P OWER C ORE C ONFIGURATION OF THE ARIES-ACT X.R. Wang 1, M. S. Tillack 1, S. Malang 2 1 University of California, San Diego,
ARIES Meeting, UCSD L. M. Waganer, June 2006 Maintenance and Building Conceptual Approach L. M. Waganer The Boeing Company ARIES Meeting University.
January 8-10, 2003/ARR 1 Plan for Engineering Study of ARIES-CS Presented by A. R. Raffray University of California, San Diego ARIES Meeting UCSD San.
June 14-15, 2005/ARR 1 Status of ARIES-CS Power Core Engineering A. René Raffray University of California, San Diego ARIES Meeting UW June 14-15, 2005.
September 3-4, 2003/ARR 1 Initial Assessment of Maintenance Scheme for 2- Field Period Configuration A. R. Raffray X. Wang University of California, San.
June 14-15, 2006/ARR 1 ARIES-CS Power Core Engineering: Updating Power Flow, Blanket and Divertor Parameters for New Reference Case (R = 7.75 m, P fusion.
Status of the Modular and Field- Period Replacement Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and L. El-Guebaly ARIES Meeting.
January 11-13, 2005/ARR 1 Ceramic Breeder Blanket Coupled with Brayton Cycle Presented by: A. R. Raffray (University of California, San Diego) With contributions.
Magnet System Definition L. Bromberg P. Titus MIT Plasma Science and Fusion Center ARIES meeting November 4-5, 2004.
ARIES-AT Study L. M. Waganer 3 May 2000 Status of Vacuum Vessel Design L. Waganer 3 May 2000 ARIES Conference Call.
The shield block is a modular system made up of austenitic steel SS316 LN-IG whose main function is to provide thermal and nuclear shielding of outer components.
Status of the Power Core Configuration Based on Modular Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
November 4-5, 2004/ARR 1 ARIES-CS Power Core Options for Phase II and Focus of Engineering Effort A. René Raffray University of California, San Diego ARIES.
April 27-28, 2006/ARR 1 Support and Possible In-Situ Alignment of ARIES-CS Divertor Target Plates Presented by A. René Raffray University of California,
December 3-4, 2003/ARR,1 1 ARIES-CS Engineering Approach Presented by A. R. Raffray University of California, San Diego L. El-Guebaly S. Malang D. K.
February 24-25, 2005/ARR 1 ARIES-CS Power Core Engineering: Status and Next Steps A. René Raffray University of California, San Diego ARIES Meeting GA.
Maintenance Schemes For ARIES-CS X.R. Wang a S. Malang b A.R. Raffray a and the ARIES Team a University of California, San Diego, 9500 Gilman Drive, La.
Status of the Coil Structure Design and Magnetic-Structural Analysis Presented by X.R. Wang Contributors: UCSD: S. Malang, A.R. Raffray PPPL: H.M. Fan.
Status of Coil Structural Design and Magnetic-Structural Analysis Presented by X.R. Wang Contributors: ORNL: D. Williamson UCSD: S. Malang, A.R. Raffray.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
Ceramic Breeder Blanket Conceptual Design for ARIES-CS Contributors: S. Malang, A.R. Raffray, and L. El-Guebaly ARIES Meeting University of Wisconsin,
Comparison of 2-FP and 3-FP CS Coil Geometry Configurations Contributors: T.K. Mau, Rene Raffray and The ARIES Team ARIES Meeting General Atomics, San.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
December 3-4, 2003/ARR 1 Maintenance Studies for 3-Field Period and 2-Field Period Configurations Presented by A. R. Raffray Major Contributors: X. Wang.
Status of 3-D Analysis, Neutron Streaming through Penetrations, and LOCA/LOFA Analysis L. El-Guebaly, M. Sawan, P. Wilson, D. Henderson, A. Ibrahim, G.
The main function of the divertor is minimizing the helium and impurity content in the plasma as well as exhausting part of the plasma thermal power. The.
A design for the DCLL inboard blanket S. Smolentsev, M. Abdou, M. Dagher - UCLA S. Malang – Consultant, Germany 2d EU-US DCLL Workshop University of California,
US ITER TBM Meeting Idaho Fall, Idaho, Aug M Dagher P Fogarty 1.TBM/ITER General Arrangement 2.Equatorial Test port Configuration 3.Test Port.
Status of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray ARIES Meeting PPPL, NJ Sept.
Update of the ARIES-CS Power Core Configuration and Maintenance X.R. Wang S. Malang A.R. Raffray and the ARIES Team ARIES Meeting Madison, Wisconsin September.
Review of the mechanical design of the final focusing region of the HIF Point Design T. Brown ARIES Project Meeting January 8, 2003.
ARIES-IFE Study L. M. Waganer, June 7, 2000 Page 1 Considerations of HI Beam and Vacuum System Arrangement L. Waganer The Boeing Company 7 June 2001 ARIES.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
Maintenance Schemes for a DEMO Power Plant and related DCLL Designs Siegfried Malang 2 nd EU-US DCLL Workshop2 nd EU-US DCLL Workshop University of California,University.
ARIES -AT Study L.M. Waganer ARIES 3/20-21/00 Page1 ARIES-AT Vacuum Vessel Design Approach L. M. Waganer The Boeing Company 20 March 2000 UCSD San Diego,
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
RFCC Module Design Update  automatic tuners  cavity suspension  cavity installation Steve Virostek Lawrence Berkeley National Lab MICE Collaboration.
1 Solid Breeder Blanket Design Concepts for HAPL Igor. N. Sviatoslavsky Fusion Technology Institute, University of Wisconsin, Madison, WI With contributions.
Engineering Overview of ARIES-ACT1 M. S. Tillack, X. R. Wang and the ARIES Team Japan/US Workshop on Power Plant Studies and Advanced Technologies
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
January 30, 2007 Exterior Magnets Concept Blanket and Vacuum Vessel Chamber Integration and Maintenance G. Sviatoslavsky, M. Sawan (UW), A.R. Raffray (UCSD),
U PDATED ARIES-ACT P OWER C ORE D EFINITION AND S I C B LANKET X.R. Wang, M. S. Tillack, S. Malang F. Najmabadi and L.A. El-Guebaly ARIES-Pathways Project.
R EFINEMENT OF THE P OWER C ORE C ONFIGURATION OF THE ARIES-ACT SA X.R. Wang 1, M. S. Tillack 1, S. Malang 2 and F. Najmabadi 1 1 University of California,
ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 1 Maintenance and Building Conceptual Approach L. Waganer and R. Peipert The Boeing Company 4 October.
ARIES-CS Power Core Configuration Presented by X.R. Wang Contributors: Laila A. Ei-Guebaly, S. Malang, T.K. Mau, Richard Peiperty, A.R. Raffray and L.
ARIES Meeting, UCSD L. M. Waganer, June 2006 Maintainability and Availability Analyses L. M. Waganer The Boeing Company ARIES Meeting University.
December 13, 2006 Blanket and Shield Design Considerations for Magnetic Intervention G. Sviatoslavsky, I.N. Sviatoslavsky, M. Sawan (UW), A.R. Raffray.
Lukasz Krzempek TE-VSC-DLM 28th WP8 Bi-weekly meeting Tuesday, 24 November 2015 Vacuum layout (Experimental side)
A View of NCSX Structural System and Load Path for the Base Support Structure.
1 A Self-Cooled Lithium Blanket Concept for HAPL I. N. Sviatoslavsky Fusion Technology Institute, University of Wisconsin, Madison, WI With contributions.
Updates of the ARIES-CS Power Core Configuration and Maintenance
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
X.R. Wang, M. S. Tillack, S. Malang, F. Najmabadi and the ARIES Team
LARP Vertical Test Facility
DCLL Blanket Analysis and Power Core Layout for ARIES-DB
Design of Distribution Feedbox at LHC P7
University of California, San Diego
CERAMIC BREEDER BLANKET FOR ARIES-CS
University of California, San Diego
CERAMIC BREEDER BLANKET FOR ARIES-CS
Status of ARIES-CS Power Core Engineering
CERAMIC BREEDER BLANKET FOR ARIES-CS
ARIES-CS Maintenance Scheme and Blanket Design for Modular Approach
University of California, San Diego
Presentation transcript:

Update of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES Meeting University of California, San Diego November 4-5, 2004

2 Outline  ARIES-RS approach of containing the contamination during maintenance operation.  Engineering details of external VV design.  Approach to control the spread of radioactive particles for CS field-period based maintenance.  Engineering details of internal VV and maintenance ports design.  Approach to control the radioactivity for CS modular maintenance.

3 ARIES-RS Approach of Employing Large Transfer Flasks M. Tillack, S. Malang, L Waganer et. al., and the ARIES Team “Configuration and Engineering Design for ARIES-RS Tokamak Power Plant” Fusion Eng & Des.,38(1997)

4 Characteristics of External VV Based on Field-Period Maintenance Scheme Cross-section at 0 degree  External VV design will be adopted, and each field-period consists of three segments.  Replacement of entire field period requires opening of the VV over a field period.  For a blanket replacement, an entire field period compose of cryostat, coils and coil supporting tube, and blanket unit is withdrawn in radial direction.

5 External VV Assembly  The vacuum vessel is a three-period structure.  Uniform shape and size in toroidal direction is considered. This design will result in a simple geometry, and easy to assembly and fabricate.  The skeleton parts of VV (brown color) will be jointed together by welding.  The three VV doors will be joined together at bolted joints.  No structural re-welding will be needed during maintenance. Cutaway of the External VV Assembly

Vacuum Vessel Assembly Sequence Position the bottom part Weld other bottom parts Add/weld the top part Add/weld other top partsAdd the side flanges Add three doors and bolt together

7 Proposed Solution for Controlling the Spread of Radioactive Particles  A temporary tent will be attached to the VV side flanges and top flange to avoid the plasma chamber or the used components to expose to the building atmosphere.  Large flasks will be attached to the outer flanges of the tent prior to opening the tent and flask doors.  The replacement unit will be removed into the flask and transferred to hot cell.

8 Layout of the Temporary Tent for Controlling the Spread of Radioactive Particles Major Features:  The tent can be moved around from one field- period position to another by the installed rail systems.  Inside the tent, a negative pressure would be maintained, therefore, perfect seals would not be depended.  It is easy to clean the tent after maintenance operation.

9 Elevation View of Showing the Tent and Its Rail Systems Rail system

10 * Presented by Laila at the ARIES Meeting

11 Vacuum Vessel Arranged Between Shield and Coils for Modular Maintenance  VV is a complex (non-uniform size and shape), three-period structures nestled inside the coils.  VV serves as an additional shield for protecting the coils.  No disassembling and re-welding of VV are required for blanket replacement.  Minimum distance between FW and inner surface of the coils is 100 cm (100 cm=120(min. distance)- 5(SOL)-5(coil case)-10(half winding pack)).  The shield-only-zone design has to be used in these regions where there are no enough space.

12 Vacuum Vessel Arranged Between Shield and Coils for Modular Maintenance(Plane view)  The optimum locations for these ports are the 0°, 120°, and 240° cross-sections (assuming one port per field period).  The ports have to bridge the space between VV and bio- shield. Bellows at the connections between port and cryostat allow for differential thermal expansion.  In order to maintain the containment of tritium, there should be two doors of the port, one at the VV and one at the outside of the cryostat.

13 Maintenance Ports Arranged Between Modular Coils at 0°, 120° and 240° The geometry repeats every 120°.

14 Front View of Showing the Maintenance Port  The shape of the maintenance port is followed to the coil edges. This enables the maximum height and width of the ports and the articulated boom for module handling. Horizontal length at top: 2.7 m Horizontal length at middle: 4.5 m Horizontal length at bottom: 2.5 m Vertical length: 5.8 m

15 Vacuum Vessel Segments  VV is assembled by six segments, and two segments for each field-period.  Considering the twofold mirror symmetry, there is only one shape per field-period.  The port can be subdivided into two halves and welded to the VV segment to avoid at 0 degree cross section welds behind coils. 0-60° segment ° segment

16 Vacuum Vessel Assembly Sequence(1)  Position the coil supporting tube of the field-period.  Slide one VV segment into the coil supporting tube of the field period in toroidal direction from one end.  Install another VV segment by sliding it into the coils supporting tube from another end, then weld the two segments from inside at 60 degree. VV and Coils Sub-assembly

17 Vacuum Vessel Assembly Sequence(2)  Position and install two VV and coils sub-assembly, and joint together at 0, 120, and 240 degree by welding.

18 Vacuum Vessel Assembly Sequence(3)  Add and install the VV port extensions.

19 Approach of the Controlling Radioactivity Based on Modular Maintenance  ARIES-RS approach of controlling radioactivity will be adopted in the CS modular maintenance.  A large transfer flask will be attached to the outer flange of a maintenance port prior to opening the door of the port.  After a bio-shield door removed and stored, both doors will be opened, then the used blanket modules can then be moved into the flask and be transferred to hot cell.  All handling of the power core must be performed with remote control.

20 Summary  The external vacuum vessel with uniform shape and size is designed for the configuration based on the field-period maintenance approach.  A temporary tent is designed to contain the radioactivity during the maintenance operation for the field-period maintenance.  The internal vacuum vessel is arranged between shield and coils, and the shape and size is non-uniform for modular maintenance.  Transfer flask(ARIES-RS approach) is employed for controlling the the radioactivity for the modular maintenance.