1 Module produced with low R int sensors-Anthony AffolderSensor Meeting, Feb 11, 2004 Modules Produced With Low R int Sensors Anthony Affolder UCSB.

Slides:



Advertisements
Similar presentations
January 22, Run IIB Silicon workshop Purdue University Bortoletto Daniela, Bolla Gino, Canepa Anadi Hamamatsu testing I-V characteristics up to 1000V.
Advertisements

Study of the MPPC Performance - contents - Introduction Fundamental properties microscopic laser scan –check variation within a sensor Summary and plans.
Slide 1 Anthony Affolder US Module LT meeting June 17, 2004 UCSB Module LT Testing.
Slide 1X-Calibration Common Testing Issues-Anthony AffolderModule Testing Meeting, June 3, 2003 X-Calibration Common Testing Issues: Grounding, Environmental.
Workshop on CMS irradiation sensor Qualification&Assurance 1 Final set of measurement for the irradiation quality assurance. What test do we need? EFFICIENT.
6/22/2015Tracker Week April 2002IEKP 1 Summary of IQC-workshop IEKP - Universität Karlsruhe (TH)
October 2001Module Construction meeting IEKP - Universität Karlsruhe (TH) 1 Discussions on validation of irradiated MODULES W. de Boer, F. Hartmann.
Finding ST Sensors that cause CMN: A Follow up to TSC Meeting N. 215 Prof. J. Incandela UC Santa Barbara US CMS Tracker Project Leader Tracker Steering.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
UCSB Encapsulation Studies UC Santa Barbara Based upon a 6 week study by F. Garberson in collaboration with A. Affolder, J. Incandela, S. Kyre and many.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
Andrea Giammanco CMS Tracker Week April DS ROD Prototype: “final” optohybrids “final” CCUM integrated in the rod with new FEC_to_CCUM adapter (Guido.
Irradiation Goals Confirm that the breakdown performance improves with dose-Done Check that breakdown does not appear after inversion on n-type sensors-Done.
Influence of the humidity on the IV curves A.Chilingarov Lancaster University UK-Valencia Cluster Meeting RAL,
Embedded Pitch Adapters a high-yield interconnection solution for strip sensors M. Ullán, C. Fleta, X. Fernández-Tejero, V. Benítez CNM (Barcelona)
October 2001General Tracker Meeting IEKP - Universität Karlsruhe (TH) 1 Results on proton irradiation tests in Karlsruhe F. Hartmann IEKP - Universität.
Performance test of STS demonstrators Anton Lymanets 15 th CBM collaboration meeting, April 12 th, 2010.
FPIX_flip_chip_test module calibration tests November 14 th 2012.
Quality Test of L1 sensors HPK 10 sensors –Tested all, 6 sent to Fermilab – Test structures, HPK 133 L00 CDF ELMA 9 sensors –Tested 6 of 9.
The MPPC Study for the GLD Calorimeter Readout Introduction Measurement of basic characteristics –Gain, Noise Rate, Cross-talk Measurement of uniformity.
Minni Singla & Sudeep Chatterji Goethe University, Frankfurt Development of radiation hard silicon microstrip detectors for the CBM experiment Special.
Testing Site Qualification Purpose: –Perform detailed scans of the silicon microstrips to make sure they all work. –Check HPK. Candidates for Certification:
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
Update on Micron productions - Comparison of AC & DC coupled devices - Marko Milovanovic*, Phil Allport, Gianluigi Casse, Sergey Burdin, Paul Dervan, Ilya.
Noise study 6/May/’13 Kazuki Motohashi - Tokyo Tech.
Update of CMS Process Quality Control Sensor Meeting, CMS TK Week, , CERN Florence Anna Macchiolo Carlo Civinini Mirko Brianzi Strasbourg Jean-Charles.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
7. Direct Current circuits. 11 Find the currents, which flow in all the wires of the circuit in this figure 12  9 V 6 V b a cd 18 
Silicon strip tests Silicon upgrade workshop in Nashville June 9, 2003 Yuji Goto (RIKEN/RBRC)
Ideas for Super LHC tracking upgrades 3/11/04 Marc Weber We have been thinking and meeting to discuss SLHC tracking R&D for a while… Agenda  Introduction:
Interstrip PT Updates John Wright. Introduction In DC PT tests it was previously assumed that PT occurred between the implant and the bias rail only,
Paul Dolejschi Characterisation of DSSD interstrip parameters BELLE II SVD-PXD Meeting.
Irradiated 3D sensor testbeam results Alex Krzywda On behalf of CMS 3D collaboration Purdue University March 15, 2012.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
September 2002Lukas Tlustos, IWORID2002 Fixed Pattern Signal fluctuations in Si pixel detectors L. Tlustos, D. Davidson, M. Campbell, E. Heijne, B. Mikulec.
How to design a good sensor? General sensor desing rules Avoid high electric fields Provide good interstrip isolation (high Rint) Avoid signal coupling.
Konstantin Stefanov 05/10/ Detecting elements for the CALICE MAPS design How does the collected charge depend on 1.Diode size? 2.Diode position with.
Chapter 26 DC Circuits Chapter 26 Opener. These MP3 players contain circuits that are dc, at least in part. (The audio signal is ac.) The circuit diagram.
Comparison of the AC and DC coupled pixels sensors read out with FE-I4 electronics Gianluigi Casse*, Marko Milovanovic, Paul Dervan, Ilya Tsurin 22/06/20161.
Performance of the LHCb Vertex Locator Thomas Latham (on behalf of the LHCb VELO group) 11/06/20111TIPP Chicago.
Investigation of the effects of thickness, pitch and manufacturer on charge multiplication properties of highly irradiated n-in-p FZ silicon strips A.
INFN and University of Florence Test Beam Meeting Tracker Week
Irradiation and annealing study of 3D p-type strip detectors
INFN and University of Florence Test Beam Meeting Tracker Week
ALiBaVa A brief overlook of Liverpool software changes, common issues and questions. A. Affolder, A. Greenall, I. Tsurin, G. Casse, V. Chmill, M. Wormald,
HV-MAPS Designs and Results I
TIB module performance at X5 Test beam – preliminary studies
Anna Macchiolo, PQC Firenze
APV Lectures APV FE Basic Building Blocks How Our Testing Works
Update of US Testing Status
APV Lectures APV FE Basic Building Blocks How Our Testing Works
UCSB Testing 3 Stereo Modules Tested 1 SS6 Module Tested
HVCMOS Detectors – Overview
The measurement set-up
Noise in TOB modules and sensor quality
UCSB Qualification Module Grading
Sensor probing (Summary)
First UCSB TEC Module (Pictures)
CORRELATION BETWEEN LEAKAGE CURRENT AND NOISE
Modules Produced With Low Rint Sensors
Anthony Affolder UC Santa Barbara
Noise in TOB modules and sensor quality
Production Status 39 modules produced
5018 Sensors Channels 420 at 150 V.
Is Increased Bias Current and CMN Correlated?
Isolated Bad-CAC Strip at UCSB
Beam Test Results for the CMS Forward Pixel Detector
Module Failures on Rods
The MPPC Study for the GLD Calorimeter Readout
5018 Sensors Channels 420 at 150 V.
Presentation transcript:

1 Module produced with low R int sensors-Anthony AffolderSensor Meeting, Feb 11, 2004 Modules Produced With Low R int Sensors Anthony Affolder UCSB

2 Module produced with low R int sensors-Anthony AffolderSensor Meeting, Feb 11, 2004 Modules Produced with low R int sensors 5 modules were produced with a set of 10 sensors with low interstrip resistances  5036 (Sensors , ) Depletion Voltage 168 V  5041 (Sensors , ) Depletion Voltage 173 V  5077 (Sensors , ) Depletion Voltage 150 V  5187 (Sensors , ) Depletion Voltage 166 V  5100 (Sensors , ) Depletion Voltage 296 V

3 Module produced with low R int sensors-Anthony AffolderSensor Meeting, Feb 11, 2004 What we can(not) measure With the ARCS system, we can measure the isolation of the strips only through noise and calibration injection  Mostly a measure of the load capacitance on the channel We do not have the tools to measure other quantities which would be very important to the determination if these sensors are usable  Cannot measure R int vs V to know to what severity that the sensors have this problem  Cannot measure the charge collection efficiency, charge sharing, and single hit resolution with tools at UCSB Need a pinpoint penetrating laser/source scan

4 Module produced with low R int sensors-Anthony AffolderSensor Meeting, Feb 11, 2004 Results (I) With the previous caveats, all 5 modules look identical to other 10 modules made that day with unaffected sensors at 400 V bias voltage For the four modules with the low depletion voltage ( V), the modules showed regular noise response at the 10% level with a bias voltage as low as 20 V  In order to make a more strong statement, R int vs. bias voltage has to be known at low bias voltages  At such low voltages in becomes difficult to distinguish between under-depletion and R int effects

5 Module produced with low R int sensors-Anthony AffolderSensor Meeting, Feb 11, 2004 Result (II) For module 5100, a noise source on order of the same size as the other noise source can be seen on second half of module until 150 V bias applied  Since sensors have a depletion voltage of 300V, it is not possible with this measurement to know if increase noise is due to Rint effects or under-depletion To disentangle the two effects, measurements of signal are needed  Laser/source/beam

6 Module produced with low R int sensors-Anthony AffolderSensor Meeting, Feb 11, 2004 Conclusions 5 modules using low Rint sensors for Pisa have been built All 5 modules show regular performance in tests possible at 400 V 4 of the modules show regular noise down to 20 V 1 module shows increased noise up to 150 bias voltage  Not clear if it is R int or under depletion effect Karlsruhe has agreed to perform laser/source scans on modules 5100 and 5187 in order to address this issue and issues of charge sharing, hit resolution, etc.