Last Week Complete Trade Studies Individual trade studies were completed and submitted. Start CNC/Machining/Prototyping CNC machine was not operable Bits and mounts will be available this week Team HazardHawk 2008
Last Week Obtaining Electronic Components Components will be bought from Mr. Brownell when available
Concept Status Layout (0,0) is in center of circle (0,0) for all other pieces is the bottom left-hand corner Z-axis is out of the page
Concept Status 1/2” between all pieces 1/8” end mill used to machine Thanks to Edytka Christner and Jude Miller Feed rate End mill speed Acquiring bits and mounts Team HazardHawk 2008
Action Items CNC Body Mounts/Braces Turret Complete Prototype Performance Requirements Meeting will be held on 3/16/08 Document will be turned in on 3/18/08 Finalize CAD of Arm Mechanism Team HazardHawk 2008