Construction Contract Administration (ENGC 6363) ( FIDIC Chapter 15) EMPLOYER BY TERMINATION Presented by: Mustafa Al tayeb.

Slides:



Advertisements
Similar presentations
ISTISNA AS MODE OF FINANCE
Advertisements

A GIA is a contract between a surety company and a contractor (or subcontractor)/principal. A GIA is a standard, typical document in the construction.
CARLIN LAW GROUP, APC Grounds for Additional Time and/or Compensation A.Express Changes B.Constructive Changes C.Differing Site Conditions D.Express Suspension.
ISTISNA’.
Contracts – important issues
Contractual Obligations
I n t e g r i t y - S e r v i c e - E x c e l l e n c e 17 th Contracting Squadron 1 Termination of Commercial Contracts.
CONTRACT TERMS AND CONDITIONS--COMMERCIAL ITEMS ( ) (FEB 2007)
LAW OF GUARANTEE AND INDEMNITY
Contract Performance, Breach and Remedies Chapter 9.
CARLIN LAW GROUP, APC (619) Know Your Indemnity Obligation Know Your Risk Know Your Insurance Company by KEVIN R. CARLIN, ESQ.
Nabil dmaidi1 Miller Act H Enacted in 1935 H Federal Contracts over $25,000 H Contractor shall provide Bonds H Performance Bonds in the amount to protect.
REMEDIAL MEASURES.
Security of Payment workshop Andrew Robertson Important Disclaimer: The material contained in this publication is comment of a general nature only and.
LECTURE 7 CLAIMS RELATED TO SUB-CONTRACTORS
Subcontractors بسم الله الرحمن الرحيم Islamic university in Gaza Collage of Engineering Postgraduate program Construction Management Prepared by: Eng.
Completion Outstanding work and Remedying Defects In order that the Works and Contractor's Documents, and each Section, shall be in the condition required.
CONSTRUCTION ADMINISTRATION Preconstruction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
International Federation of Consulting Engineers Session 10: Integrity/Corruption Dr. Jorge Díaz Padilla.
Contracts: Third Party Rights, Discharge, Breach and Remedies Chapter 10.
Time for a new standard - AS General Conditions of Contract
The Islamic University of Gaza Engineering Faculty
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT Defects Liability [Construction Contract Administration] Chapter 11.
Performance & Termination of Contract (Discharge of Contract)
LOGO October The Employer FIDIC 1999 dasdas Supervisor: Dr.Kamalain shaath Done by: Mahmoud Abu Kmail Construction Contract Administration ENGC.
INTERNATIONAL SALES LAW - seminar 2004 ISL Contractual Risk Management in Transnational Sales Transactions ISL: objectives, functions and structure Management.
Contract price & payment
Insurance provisions under JCT 1998 and JCT Standard Building Contract 2005 Brian Lewis – QBE CAR.
Mikael Wahlgren NCC Construction Sverige AB ESCL Conference August 25th 2006 – Risk in Construction and how to deal with them. Duty for the contractor.
Mechanic’s Lien DENIZE & SARAH. WHAT IS A MECHANIC’S LIEN  A Mechanic’s Lien is a security interest in the title to property for the benefit of those.
Mechanics of Early Termination and Liquidation
AN INTRODUCTION TO FIDIC CONDITIONS OF CONTRACT PART (I) FOR E. P. C
Compensation events and claims Presented by Prof. Khem Dallakoti.
CONSTRUCTION CONTRACTS – MASTER CHART
CONSTRUCTION ADMINISTRATION Construction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
LECTURE 4 FORMULATION & PRESENTATION OF MONETARY CLAIMS  Recovery of Loss / Expenses / Damages  Notice of intention to claim  Particular and further.
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
Project Closeout Module #14 Prepared by Dr. Randy R. Rapp July 2005.
Angelica R. Armenta FAR Study Group – Jan Only contracting officers acting within the scope of their authority are empowered to execute contract.
Intellectual Property Rights Economy and Ownership of Results in IST Projects The Research Council of Norway Niels Peter Thorshaug.
1 中央大學營管所學分班 工程契約與文件管理 CHAPTER 16 TEST AFTER COMPLETION Silver Book, 2002 Clause 12. 授課教授 : 謝定亞 博士 學員 : 陳忠正 ( 研發中心管線組 )
From GlobeCast Asia Broadcast Service contract:. From GlobeCast Asia Broadcast Service contract(Cont’d):
Conditions Of Contract For Construction Conditions Of Contract For Construction Presented BY : Arch. INA’AM J. El TAWIL FIDIC 1999Conditions of Contract.
Highway to Hell or Strawberry Fields Forever Identifying and Dealing with Avoidable Project Risk.
Why Bond Forms Matter… A Practical Guide to Better Bonding Presenters: Joanne S. Brooks, Esq., Vice President and Counsel, The Surety and Fidelity Association.
CONTINUATION SA REPORT NI TAHNEE. ELEMENTS OF CONTRACTS.
Contract Performance In Traditional and E-Contracts; Breach of Contract and Remedies Chapter 18 & 19.
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
By Khalil T. Hasan Construction Solutions ( Joint Operation/Administration of multiple FIDIC Forms – A Case Study.
HOW TO PROTECT YOUR INTEREST IN A SALE CONTRACT Focus on what you “get” when you sign!
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
Construction Contracts Act, Adjudication & Payment Claims Conference 2016 The Right to Suspend Work Explained Lydia B. Bunni BL Wednesday 28 th September.
Insurance in Construction
Insolvency.
Administration of a FIDIC Contract - Project Control
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Administration of a FIDIC Contract - Award to Commencement -
Insolvency.
Insolvency.
PERFORMANCE OF CONTRACT OF SALE OF GOODS
بسم الله الرحمن الرحيم Tests on Completion Dr. Kamaleen Sha’ath
THE EMPLOYER Right, of access to the site.
Find the Problems with the Provisions May 11, 2016 Presented By:
STRUCTURE OF THE PRESENTATION
SECURITY DEPOSIT RECEIPT
EMPLOYER’S RIGHTS – COMMON LAW AND CONTRACTUAL DETERMINATION PROCEDURE
Construction Contract Administration
Presentation transcript:

Construction Contract Administration (ENGC 6363) ( FIDIC Chapter 15) EMPLOYER BY TERMINATION Presented by: Mustafa Al tayeb

15.1- Notes to Correct If the Contractor fails to carry out any obligation under the Contract, the Engineer may by notice require the Contractor to make good the failure and to remedy it within a specified reasonable time. TERMINATION BY EMPLOYER15-2

15.2- Termination by Employer The Employer shall be entitled to terminate the Contract if the Contractor: (a) fails to comply with Sub-Clause 4.2 [Performance Security] or with a notice under Sub-Clause ­15.1 [Notice to Correct], (b) abandons the Works or otherwise plainly demonstrates the intention not to continue performance of his obligations under the Contract. TERMINATION BY EMPLOYER15-2

( c) without reasonable excuse fails: (i) to proceed with the Works in accordance with Clause 8 [Commencement, Delays and Suspension], or [Commencement, Delays and Suspension], or (ii) to comply with a notice issued under Sub-Clause 7.5 [Rejection] or Sub- Clause 7.6 [Remedial Work], within 28 days after receiving it, TERMINATION BY EMPLOYER15-2

(d) subcontracts the whole of the Works or assigns the Contract without the required agreement, (e) becomes bankrupt or insolvent, goes into liquidation, has a receiving or administration order made against him, compounds with his creditors, or carries on business under a receiver, trustee or manager for the benefit of his creditors, or if any act is done or event occurs which (under applicable Laws) has a similar effect to any of these acts or events, or TERMINATION BY EMPLOYER15-2

( f) gives or offers to give (directly or indirectly) to any person any bribe, gift, gratuity, commission or other thing of value, as an inducement or reward: (i) for doing or forbearing to do any action in relation to the Contract or (ii) for showing. or forbearing toshow favour or disfavour to any person in relation to the Contact, or if any of the Contractor's Personnel agents or Subcontractors gives or offers to give (directly or indirectly) to any person any such inducement or reward as is described in this sub­ paragraph (f). However, lawful inducements and rewards to Contractor's Personnel shall not entitle termination. TERMINATION BY EMPLOYER15-2

In any of these events or circumstances, the Employer may, upon giving 14 days notice to the Contractor, terminate the Contract and expel the Contractor from the Site. However, in the case of sub­paragraph (e) or (f), the Employer may by notice terminate the Contract immediately. The Employer's election to terminate the Contract shall not prejudice any other rights of the Employer, under the contract or otherwise. TERMINATION BY EMPLOYER15-2

The Contractor shall then leave the Site and deliver any required Goods, all Contractor's Documents, and other design documents made by or for him to the Engineer. However, the Contractor shall use his best efforts to comply immediately with any reasonableinstructions included in the notice The Contractor shall then leave the Site and deliver any required Goods, all Contractor's Documents, and other design documents made by or for him to the Engineer. However, the Contractor shall use his best efforts to comply immediately with any reasonableinstructions included in the notice (i) for the assignment of any subcontract, and (i) for the assignment of any subcontract, and (ii) for the protection of life or property or for the safety of the Works. (ii) for the protection of life or property or for the safety of the Works. TERMINATION BY EMPLOYER15-2

After termination, the Employer may complete the Works and/or arrange for any other entities to do so. The Employer and these entities may then use any Goods, Contractor's Documents and other design documents made by or on behalf of the Contractor. The Employer shall then give notice that, the Contractor's Equipment and Temporary Works will be released to the Contractor at or near the Site. The Contractor shall promptly arrange their removal, at the risk and cost of the Contractor. However, if by this time the Contractor has failed to make a payment due to the Employer, these items may be sold by the Employer in order to recover this payment. Any balance of the proceeds shall then be paid to the Contractor. TERMINATION BY EMPLOYER15-2

15.3- Valuation at Date of Termination As soon as practicable after a notice of termination under Sub- Clause [Termination by Employer] has taken effect, the Engineer shall proceedin accordance with Sub-Clause 3.5 [Determinations] to agree or determine the value of the Works, Goods and Contractor's Documents, and any other sums due to the Contractor for work executed in accordance with the Contract Valuation at Date of Termination

15.4- Payment after Termination After a notice of termination under Sub-Clause 15.2 [Termination by Employer] has taken effect, the Employer may: 15.2 [Termination by Employer] has taken effect, the Employer may: (a) proceed in accordance with Sub- Clause 2.5 [Employer's Claims], (b) withhold further payments to l the Contractor until the costs of execution, completion and remedying of any defects, damages for delay (completion (if any), and all other costs incurred by the Employer, have been. established, and/or. (c ) recover from the Contractor any losses and damages incurred by the Employer and any extra costs of completing the Works, after allowing for any sum due to the Contractor under Sub-Clause 15.3 [Valuation at Date of Termination]. After recovering any such losses, damages and extra costs, the Employer shall pay any balance to the Contractor Payment after Termination

15.5- Employment's Entitlement to Termination The Employer shall be entitled to terminate the Contract, at any time for the Employer's convenience, by giving notice of such termination to the Contractor. The termination shall take effect 28 days after the later of the dates on which the Contractor receives this notice or the Employer returns, the performance Security. The Employer shall not terminate the Contract under this Sub- Clause in order to execute the Works him self or to arrange for the Works to be executed by another contractor. Contractor receives this notice or the Employer returns, the performance Security. The Employer shall not terminate the Contract under this Sub- Clause in order to execute the Works him self or to arrange for the Works to be executed by another contractor Employment's Entitlement to Termination

After this termination, the Contractor shall proceedin accordance with Sub-Clause 16.3 [Cessation of Work and Removal of Contractors Equipment] and shall be paid in accordance with Sub-Clause 19.6 [Optional Termination, Payment, and Release] Employment's Entitlement to Termination