Undulator-Based Production of Polarized Positrons Status Report on E-166 Undulator-Based Production of Polarized Positrons K.T. McDonald Princeton University.

Slides:



Advertisements
Similar presentations
POLARIMETRY of MeV Photons and Positrons Overview Beam Characterization – undulator photons – positrons Basics of the Transmission Method – for photon.
Advertisements

PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Fast and Precise Beam Energy Measurement at the International Linear Collider Michele Viti.
Muon g-2 and SLAC Detector Test T-519 Momentu m Spin e David Hertzog University of Washington.
MTest Facility Low Energy Beam Erik Ramberg AEM 15 October, 2007.
ATF2 Interaction Point Beam Size Monitor (Shintake Monitor) Status T. Yamanaka, M. Oroku, Y. Yamaguchi, S. Komamiya ( Univ. of Tokyo ), T. Suehara, Y.
Pair Spectrometer Design Optimization Pair Spectrometer Design Optimization A. Somov, Jefferson Lab GlueX Collaboration Meeting September
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
Undulator-Based Positron Production in the Final Focus Test Beam (E-166) The International Polarized Positron Production Collaboration K.T. McDonald, J.C.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
K.T. McDonald DoE Review Aug. 10, E-166 Experiment E-166 is a demonstration of undulator-based polarized positron production for linear colliders.
EPAC June 2003 The EPAC June 2003 Questions 1. Clarify the Motivation for the Proposal. 2. How to ensure the e+ polarimeter works right away? 3. What is.
5 th Rencontres du Vietnam - Aug. 7, 2004 Polarized Positrons…E166 A.W.Weidemann 1 Introduction (What, who) Motivation (Why) Experiment and Polarimetry.
E166 Collaboration J.C. Sheppard SLAC, October, 2003 E166 Background Test Simulations: Overview-what do we need J. C. Sheppard.
E166 “Polarized Positrons for Future Linear Colliders” John C. Sheppard E166 Co-spokesman SLAC: August 31, 2004.
K.T. McDonald DoE Review July 29, E-166 Experiment E-166 is a demonstration of undulator-based polarized positron production for linear colliders.
E166 Collaboration About 45+2 members from 16+1 institutions from all three regions (Asia, Europe, the Americas, and Daresbury) About 45+2 members from.
NLC - The Next Linear Collider Project NLC IR Layout and Background Estimates Jeff Gronberg/LLNL For the Beam Delivery Group LCWS - October 25, 2000.
IPPC June 2003 E-166 Background Studied 3-slides.
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
Left: The polarization of the undulator radiation as a function of energy. Right: Calculated positron longitudinal polarization as a function of energy.
NLC - The Next Linear Collider Project Sheppard/Pitthan June 26, 2015 Towards an Undulator Based NLC Positron Source Towards an Undulator Based NLC Positron.
K. LaihemE166 collaboration LCWS06 Bangalore March 12th 2006 The E166 experiment Development of a polarized positron source for the ILC. Karim Laihem on.
Undulator-Based Production of Polarized Positrons An experiment in the 50 GeV Beam in the SLAC FFTB E-166 Undulator-Based Production of Polarized Positrons.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Undulator-Based Positron Production in the Final Focus Test Beam (E-166) K.T. McDonald, J.C. Sheppard, Co-Spokespersons SLAC Experimental Program Advisory.
E166 Collaboration About 45+2 members from 16+1 institutions from all three regions (Asia, Europe, the Americas, and Daresbury) About 45+2 members from.
EPAC June 2003 Undulator-Based Production of Polarized Positrons A proposal for the 50 GeV Beam in the FFTB E-166 Undulator-Based Production of Polarized.
Linac Beams for Fixed Target Experiments Presentation by Roger Erickson SLAC Operations Review SLAC, June 15-16, 2004.
TEST BEAMS Stanford Linear Accelerator Center Ted Fieguth DoE/SLAC Program Review April & May 1, 1997.
K. Moffeit 6 Jan 2005 WORKSHOP Machine-Detector Interface at the International Linear Collider SLAC January 6-8, 2005 Polarimetry at the ILC Design issues.
NLC - The Next Linear Collider Project Backgrounds Update Tom Markiewicz SLAC LCWS Cornell 15 July 2003.
NLC - The Next Linear Collider Project Sheppard/Pitthan July 14, 2015 POWER Meeting June 8=9,2002 Durham, England POWER Meeting June 8=9,2002 Durham, England.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
M. Woods (SLAC) Beam Diagnostics for test facilities of i)  ii) polarized e+ source January 9 –11, 2002.
Background Issues: Real Time Radiation Measurement S.M.Yang EPC.IHEP Mini-Workshop on BEPCII Background Study March 2008 Institute of High Energy.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
Beijing, Feb 3 rd, 2007 LEPOL 1 Low Energy Positron Polarimetry for the ILC Sabine Riemann (DESY) On behalf of the LEPOL Collaboration.
Polarimetry at the LC Source Which type of polarimetry, at which energies for LC ? Sabine Riemann (DESY), LEPOL Group International Workshop on Linear.
E-165 (FLASH) Status 8:00am 6/13/2004. Thick Target Program Primary goal is to measure the fluorescence light output at different stages of shower development.
Development of a Positron Production Target for the ILC Positron Source Capture Optics Positron beam pipe/ NC rf cavity Target wheel Vacuum feedthrough.
FACET Update ARD Status Meeting Christine Clarke April 14 th 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
HPS T EST R UN C ONTINGENCY P LAN S. Stepanyan JLAB.
Integrated Radiation Measurement and Radiation Protection of BES Ⅲ Zhang Qingjiang, Wu protection group, accelerator center, IHEP,
1 Overview of Polarimetry Outline of Talk Polarized Physics Machine-Detector Interface Issues Upstream Polarimeter Downstream Polarimeter Ken Moffeit,
Oct. 6, Summary of the Polarisation Session J. Clarke, G. Moortgat-Pick, S. Riemann 10 November 2006, ECFA Workshop, Valencia.
1 G9a -FROST. 2 Experiments FROST New generation of CLAS photoproduction experiments with FROzen Spin Polarized Target (FROST) E02-112: γp→KY (K + Λ,
Undulator-Based Positron Production in the Final Focus Test Beam (E-166) The International Polarized Positron Production Collaboration K.T. McDonald, J.C.
Tsukuba-hall webcam 1 Beam Pipe and Vertex Detector extraction: on Nov. 10, 2010 Belle Detector Roll-out: Dec. 9, 2010 End-caps, CDC, B-ACC, TOF extraction:
Polarimetry Report Sabine Riemann on behalf of the DESY/HUB group January 24, 2008 EUROTeV Annual Meeting, Frascati.
D. Still-FNAL/Tevatron HALO '03 Tevatron Collider II Halo Removal System Dean Still Fermilab Tevatron Department 5/21/2003 Motives for the Collider Run.
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
WG3a Sources Update Jim Clarke on behalf of WG3a GDE Meeting, Frascati, December 2005.
Proposal for the End Station Test Beam (ESTB) at SLAC John Jaros ALCPG09 Albuquerque September 30, 2009.
Design challenges for head-on scheme Deepa Angal-Kalinin Orsay, 19 th October 2006.
CsI(Tl) Calorimeter and status of the E166 experiment E166 experiment CsI ( Tl) calorimeter construction. Test beam results vs. Geant4 simulation Schedules.
Conditions at a potential location of a beam dump experiment at LCLS-II Clive Field, SLAC: 4/29/16.
E-165 (FLASH) Status 8:00am 6/12/2004.
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
Preparation of the CLAS12 First Experiment Status and Time-Line
Status Report on E-166 Undulator-Based Production of Polarized Positrons K.T. McDonald Princeton University EPAC Meeting SLAC, November 15, 2003.
E166 - LEPOL - Low Energy Positron Polarimetry for the ILC
Electron Source Configuration
End Station Test Beam (ESTB) at SLAC
Fassò, N. Nakao, H. Vincke Aug. 2, 2005
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

Undulator-Based Production of Polarized Positrons Status Report on E-166 Undulator-Based Production of Polarized Positrons K.T. McDonald Princeton University EPAC Meeting SLAC, November 15, 2003

K.T. McDonald SLAC EPAC Meeting November 15, E-166 Experiment E-166 is a demonstration of undulator-based polarized positron production for linear colliders – E-166 uses the 50 GeV FFTB beam in conjunction with 1 m-long, helical undulator ( = 2.4 mm, ID = 0.9 mm) to make 10-MeV polarized photons. –These photons are converted in a ~ 0.5 rad. len. thick target into e+ (and e - ) with ~ 50% polarization. –The polarization of the positrons and photons will be measured. – E-166 was approved, following presentation to the EPAC in June 2003, for a main data run in 2005, pending demonstration in a test run in 2004 that beam-related backgrounds are sufficiently low.

K.T. McDonald SLAC EPAC Meeting November 15, (47 Collaborators) E-166 Collaboration (16 Institutions)

K.T. McDonald SLAC EPAC Meeting November 15, E-166 Beam Measurements Photon flux and polarization as a function of undulator K (P  ~ 75% for E  > 5 MeV). Positron flux and polarization vs. energy for K = 0.17, 0.5 r.l. of Ti (P e + ~ 50%). Positron flux and polarization for 0.1 r.l. and 0.25 r.l. Ti and 0.1, 0.25, and 0.5 r.l. W targets. Each measurement is expected to take about 20 minutes. A relative polarization measurement of 5% is sufficient to validate the polarized positron production processes. The undulator will be pulsed in a random pattern of beam pulses to permit continuous monitoring of undulator-off background levels.

K.T. McDonald SLAC EPAC Meeting November 15, E-166 Beam Request 6 weeks of activity in the SLAC FFTB: 2 weeks of installation and check-out 1 week of check-out with beam 3 weeks of data taking: Roughly 1/3 of time on photon measurements, 2/3 of time on positron measurements. Tentative schedule (November 2003): 2004: 2 weeks installation + 1 week background 28 GeV. 2005: 1 week installation + 3 weeks data 50 GeV. Request of June 2003:

K.T. McDonald SLAC EPAC Meeting November 15, Beam Background Studies in 2004 E-166 may have backgrounds due to: 1.Showers from beam electrons upstream of the undulator. 2.RF pickup from beam electrons near the dump. 3.Backsplash from the dump. 4.Showers from electrons that interact with the Protection Collimator in front of, or with gas in, the undulator tube. 5.Soft e  and  ’s that scatter within the polarimeters. The test 28 GeV in 2004 is to verify that sources 1-4 cause backgrounds less than 5% of the expected signals. High-quality beam tuning (as for E-144) is essential. The success of the test run is to be reviewed by a committee: Robert Noble (chair), C. Field, H. Lynch, and M. Ross.

K.T. McDonald SLAC EPAC Meeting November 15, Expected Signals, Allowable Backgrounds 1 x e -  4 x 10 9  4 x 10 9   2 x 10 7 e + 2 x 10 7 e +  4 x 10 5 e + 4 x 10 5 e +  1 x 10 3  4 x 10 9   4 x 10 7  Expected Signals (per e - ): CsI calorimeter: 10 3  5 MeV  5 GeV SiW calorimeter: 4 x 10 7  5 MeV  200 TeV Aerogel: 2 x 10 7  ’s x p.e./   2 x 10 4 photoelectrons Allowable Backgrounds (5% of signals): CsI: 250 MeV SiW: 10 TeV Aerogel: 10 3 p.e. EGS, Fluka  50 GeV will be ~ 3 28 GeV.

K.T. McDonald SLAC EPAC Meeting November 15, GeV Test Run Preparations: Overall Layout Use 28 GeV beam of same invariant emittance as at 50 GeV.  Spot size at 28 GeV is  50/28 = 4/3 times that at 50 GeV,  Use 1.2 mm undulator tube at 28 GeV.

K.T. McDonald SLAC EPAC Meeting November 15, GeV Test Run Preparations: Simulations EGS simulation of 28 and 50 GeV electrons hitting undulator Protection Collimator (PC).  3 times as much background energy into E-166 detectors at 50 GeV as at 28 GeV.  0.14 GeV per electron that hits the PC goes thru the 3-mm-diameter aperture of the collimator in front of the  converter.  70,000 e’s give 10 TeV in the SiW calor.  0.05 GeV per electron that hits the PC into the 400 cm 2 area of the CsI calor.  5 e’s give 250 MeV in the CsI calor. IF NO SHIELDING. The simulation does not yet include the ~ 3 m of iron/alnico between undulator and CsI calor., nor does it include any lead.

K.T. McDonald SLAC EPAC Meeting November 15, GeV Test Run Preparations: Implications of Simulations  polarimetry viable for up to ~ 100,000 e’s hitting the undulator Protection Collimator (10 -5 of the beam).  Beam tuning must be at least this good.  Average vacuum in undulator tube must be < Torr. Shielding of the CsI calor. must reduce background energy flux by ~ 20,000 in the worst case that is viable for the SiW calorimeter. 50 X 0 of lead attenuates energy by ~ 20,000 (EGS4).  Prepare to add ~ 50 X 0 of lead (30 cm) upstream of CsI calor. (in addition to the 150 X 0 of iron/alnico aleady there).

K.T. McDonald SLAC EPAC Meeting November 15, GeV Test Run Preparations: E-164/166 Sliding Table for Undulator Two positions: 1.Undulator tube and Protection Collimator on the electron beam. 2.Beam profile monitor + 1” beam pipe on the electron beam. Position 2 is default for other use of the FFTB than E-166.

K.T. McDonald SLAC EPAC Meeting November 15, GeV Test Run Preparations: Gear Near the Undulator Tube Trim Magnets Beam Position Monitor “Hard-Soft” Bend Magnet Optical Transition Radiation Monitor Wire Scanner

K.T. McDonald SLAC EPAC Meeting November 15, GeV Test Run Preparations: SiW Calorimeter - Prototype SiW calorimeter for  polarimetry is now in the FFTB tunnel. [T-467 parasitic data : no shielding, E165 beam  CsI backgrounds 10 5 times too high.] -The PCAL calorimeter of E-144 has been reinstalled above the FFTB dump magnets to monitor undulator scraping.

K.T. McDonald SLAC EPAC Meeting November 15, GeV Test Run Preparations: Aerogel Cerenkov Counters Two Cerenkov counters with aerogel of index n = are now in the FFTB tunnel. [T-467, 15 Nov 03: unshielded aerogel counters at position of CsI array see only 1200 particles/spill.] Index measured with a Michaelson interferometer.

K.T. McDonald SLAC EPAC Meeting November 15, GeV Test Run Preparations: CsI Calorimeters with PMT & Diodes One CsI calorimeter with PMT already in FFTB tunnel. One more with PMT, and another with photodiodes, ready by Dec. 1. (Thanks to BaBar.) Calibration via sources and cosmics. Light Readout: PMT

K.T. McDonald SLAC EPAC Meeting November 15, GeV Test Run Preparations: Data Acquisition PC-based data acquisition system with LabView software and CAMAC interface. Software will build on E-165 experience. System now installed in Bldg 407.

K.T. McDonald SLAC EPAC Meeting November 15, E-166 gear can remain in place during E-164/165/SPPS running provided: –The undulator tube/1” tube sliding table is set to 1” tube on beam. –The radiation safety dump for the E-164  line is moved upstream and placed on a sliding table. For E-166 to run: –The retractable components of E-164/165/SPPS should be removed from the e and  lines. –The E-164 pair spectrometer in the  line must be removed. –The air gaps in the e line downstream of the FFTB dump magnets, used by E-164/165, should be closed up (with vacuum pipes). 28 GeV Test Run Preparations: Compatibility with E-164/165, SPPS

K.T. McDonald SLAC EPAC Meeting November 15, GeV Test Run Beam Requirements

K.T. McDonald SLAC EPAC Meeting November 15, Stages of the 28 GeV Test Run 1.Tune 28 GeV beam with long pulse for low losses. (No installation needed.) 2.Tune beam through the undulator tube. (Install undulator tube and nearby beam diagnostics.) 3.Study backgrounds in prototype E-166 detectors. (Install shielding and reconfigure the FFTB  line. Prototype detectors already installed.) Beam tuning is critical,  Schedule initial tuning well before end of FFTB running.

K.T. McDonald SLAC EPAC Meeting November 15, GeV Test Run Preparations: Timeline/Milestones 1 Dec 2003: – All detectors for the test run complete. – Complete design of sliding tables for undulator and E-164  line dump. 1 Jan 2004: – Complete installation and checkout of detectors in FFTB tunnel (during occasional accesses). – Complete checkout of BPM’s, OTR, 2 nd soft bend magnet. – Complete design of shielding for detectors. 1 Feb 2004: – Complete fabrication of the two sliding tables. – Complete fabrication of detector shielding components. 15 Feb 2004: – Complete installation of sliding tables, E-166 beam diagnostics, and detector shielding (requiring a 2 week shutdown of the FFTB).

K.T. McDonald SLAC EPAC Meeting November 15, From a Successful Test Run in 2004 to the Data Run in Fabricate the undulator and power supply. 2.Fabricate the magnetized iron absorbers. 3.Fabricate the positron polarimeter transport magnets. 4.Fabricate the 4 x 4 CsI calorimeter. 5.Implement the final shielding configuration.

K.T. McDonald SLAC EPAC Meeting November 15, E-166 Institutional Responsibilities Electron BeamlineSLAC UndulatorCornell Positron BeamlineCornell/Princeton/SLAC Photon BeamlineSLAC Polarimetry: OverallDESY Magnetized Fe AbsorbersDESY Cerenkov DetectorsPrinceton Si-W CalorimeterTenn./ S. Carolina CsI CalorimeterDESY/Humboldt DAQS. Car./SLAC

K.T. McDonald SLAC EPAC Meeting November 15, Appendix: Preliminary Concept of Detector Shielding at 28/50 GeV Bright items to be 28 GeV; faint items 50 GeV.

K.T. McDonald SLAC EPAC Meeting November 15, Appendix: Preliminary Concept of Higher Acceptance Positron Transport Add focusing element(s) near positron production target to increase acceptance.