Life Cycle Costing and Reliability H. Scott Matthews February 5, 2003.

Slides:



Advertisements
Similar presentations
State of Good Repair, Transit Rehab and Maintenance of Buses BusCon Jeff Hiott Sr. Program Manager September 11, 2012.
Advertisements

Executive Session Office of Asset Management
Life Cycle Cost Analysis for Bridges In Search of Better Investment and Engineering Decisions Presented by: Hank Bonstedt Executive Director Prestressed.
Worked Example: Highway Safety Modeling. Outline –Safety Modeling »Safety Modeling Process –Set-up for Worked Example –Develop / Build Safety Model »Project.
Life-Cycle Cost Analysis
1 Luis Rodriguez, P.E. Federal Highway Administration Life Cycle Cost Analysis Virginia Concrete Conference March 6-7, 2014.
TXDOT Asset Maintenance
GASB#34 Asset Management TEAM Transportation Fair Presentation by: Charles J. Nemmers, P.E. Charles J. Nemmers, P.E. October 8, 2004St. Louis, Missouri.
Presented by Matthew J. LaChance Pavement Solutions for State, County, and Municipal Infrastructures.
Toward a Sustainable Future Name of Conference, Event, or Audience Date Presenter’s Name | ©2011 Synapse Energy Economics Inc. All.
 Life cycle costing, LCC, is the process of economic analysis to asses the total cost of ownership of a product, including its cost of installation,
Global Infrastructure Stocks/ Reliability H. Scott Matthews February 12, 2004.
Life Cycle Implications of ECC- Bridge Components Andrew Shuck May 3, 2010.
Transforming Transportation: The Role of Intelligent Transportation Systems Matthew J. Schiemer, PE August 18, 2011.
1 Civil Systems Planning Benefit/Cost Analysis Scott Matthews Courses: and Lecture 9 - 9/29/2002.
Asset Management Scott Matthews January 22, 2004.
Life Cycle Cost Analysis in Pavement Design - In Search of Better Investment Decisions - Office of Asset Management Federal Highway Administration Executive.
Life Cycle Cost Analysis
Deficiencies, Needs H. Scott Matthews January 22, 2003.
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
Reliability / Life Cycle Cost Analysis H. Scott Matthews February 17, 2004.
Infrastructure Management Systems H. Scott Matthews March 31, 2003.
Built Infrastructure: Overview and Issues H. Scott Matthews February 10, 2003.
Critical Infrastructure Interdependencies H. Scott Matthews March 30, 2004.
PRIORITIZATION.
Performance Measures H. Scott Matthews February 3, 2003.
Built Infrastructure: Overview and Issues H. Scott Matthews January 29, 2004.
Presentation Roadmap Maintenance Contract Model Options
Thermally Insulated Concrete Pavements: Life-Cycle Cost Analysis Methods and Preliminary Results January 10, 2011 John Harvey Nick Santero Lev Khazanovich.
HDM-4 Applications. 2 Project Appraisal Project Formulation Maintenance Policy Optimization Road Works Programming Network Strategic Analysis Standards.
Cost Analysis of Military Training Marcel C. Smit SAS-095 workshop on Cost-Benefit Analysis of Military Training Amsterdam, The Netherlands 5-6 June 2012.
Traffic Incident Management – a Strategic Focus Inspector Peter Baird National Adviser: Policy and Legislation: Road Policing.
8 th Road Pavements Forum 17 Nov 2004 SABITA PROJECT: Warrants for upgrading SuperSurf J Lea and P Paige-Green.
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
Bridge Management New Bridge or Existing? New Design Conceptual Design Detailed Design Tender Preparation and Advertisement Construction Rehabilitation.
ETSI Methodology1 LCC Methodology Håkan Sundquist Structural Design and Bridges KTH.
Economic Analysis: Applications to Work Zones March 25, 2004.
AT Benefit Cost Analysis Model Highway Design, Project Management and Training Section Technical Standards Branch Presented by Bill Kenny, Director: Design,
Benefit Cost Analysis for WRTM Mike Lawrence Jack Faucett Associates ITS PCB T3 Webinar July 8, 2014.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
Smart Grid - Developments and Implementations Prof. Gady Golan – HIT, Israel Dr. Yuval Beck – HIT, Israel , Electricity 2012, Eilat.
USTC&TBA La Jolla, CA December, 8, Track Construction & Reconstruction: Asphalt Overlay Issues vs. Removal & Replacement.
Quantifying Transportation Needs and Assessing Revenue Options: The Texas Experience presented to The Arkansas Blue Ribbon Committee on Highway Finance.
1 How to Reduce Fleet Costs $$$ Presenters Gary Hatfield & William Gookin Mercury Associates.
Life Cycle Cost Analysis for Bridges In Search of Better Investment and Engineering Decisions.
Chapter 3 Framework for Treatment Selection From… Maintenance Technical Advisory Guide (MTAG)
Engineering Economic Analysis Canadian Edition
Maintenance & Rehabilitation Strategies Lecture 5.
Data Palooza Workshop May 9, 2013 Rabinder Bains, FHWA – Office of Policy and Government Affairs.
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
Institute of Transportation Systems > OPTIMISATION OF POINT LIFE CYCLE COSTS THROUGH LOAD-DEPENDENT MAINTENANCE > Slide 1 OPTIMISATION OF POINT LIFE CYCLE.
MIT - October 1, 2004Jeffrey D. Ensor 1 RSTP Planning for Operations Jeffrey D. Ensor Malaysia Transport Group M.I.T. October 1, 2004.
Gary Hicks and Rob Marsh Gary Hicks and Rob Marsh April 19, 2005 April 19, 2005 Pavement Preservation Sub-Group on Strategy Selection & Evaluation.
Risk Analysis for Major Rehabilitation. Major Rehabilitation Background  Prior to FY 1992  Funded under Operation and Maintenance, General, Appropriation.
BLOCK 4 SELECTION OF THE PREFERRED ALTERNATIVE Pavement Data Collection Project evaluation Select feasible alternatives Reconstruction Restoration Recycling.
Utah Research Benefits Value of Research Taskforce July 29, 2015 Cameron Kergaye Utah Department of Transportation.
Briefing for Transportation Finance Panel Nov 23, 2015 Economic Analysis Reports: 1.I-84 Viaduct in Hartford 2.I-84/Rt8 Mixmaster in Waterbury 3.New Haven.
Benefit/Cost Ratios, Internal rate of Return, valuation, and depreciation.
PAVEMENT TYPE SELECTION Hesham Mahgoub, PhD, PE. South Dakota State University South Dakota Department of Transportation, Office of Road Design.
Energy System Investment and Risk Management Unit 2A: Energy Economics and Markets Paul Rowley 1, Simon Watson 1 and Andy Williams 2 1 CREST & 2 Wolfson.
03/31/2010 v.20 DRAFT – DO NOT CITE OR QUOTE For NPC Study Discussion Only 1 Summary of Demand Perspective Hard Truths provided evaluation of baseline.
Design and Rehabilitation Strategies for Sustainable Concrete Pavements H. Thomas Yu Federal Highway Administration Office of Pavement Technology.
Road Investment Decision Framework
City of Abilene Pavement Condition Survey 2017 Results and Discussion
Multi-Year Programming and Predictive Modelling
Infrastructure Management Systems
Life Cycle Cost Analysis
Introduction and Applications
ITTS FEAT Tool Methodology Review ITTS Member States Paula Dowell, PhD
Worked Example: Highway Safety Modeling
Presentation transcript:

Life Cycle Costing and Reliability H. Scott Matthews February 5, 2003

Homework 1 Comments  Average 23.5/25  No major issues other than using wrong data (not sure where you got it)  Key things:  “Condition” is a vague word unless defined  “Conditions” getting better, may hit goal  Probably makes more sense to move towards reliability rather than condition- based assessment methods (more on that today)

Recap of Last Lecture  Defined and discussed performance  Humplick paper reminded us of multiple levels and perspectives  We hadn’t discussed users much before  Talked about why infrastructure matters  And why performance measurement is difficult  Overview of performance methods

Life Cycle Costing (LCC)  Mentioned earlier in course  Is a tool to assist decision makers in managing ‘total costs’ of projects  Includes design, construction, 4R’s (repair, rehabilitation, replacement, reconstruction), user costs, disposal  Converted into ‘present value’ costs  Generally an “economic-only” (costs only) framework  Others (around CMU and elsewhere) have added consideration of energy/environmental

More Background  ISTEA (1991) suggested LCC for pavement, bridge, tunnel projects  FHWA in 1996 linked funds availability to use of LCC in major projects  Why might you not want to use LCC?  How does this differ from Benefit-Cost Analysis?

Initial Costs  Usually site preparation and construction  Should consider ‘user costs’ (traffic, etc)  Where to get data - current/completed projects similar in design/scope

4R’s and Salvage Costs  Are dependent on technology and materials choices  E.g. depth of pavement affects useful life  Should not exclude costs that seem ‘too small’ - you don’t know ‘how small’ until total costs estimated!  Salvage - potential value of materials at end-of-life (e.g. scrap steel, asphalt, etc)

User (Delay) Costs  Consideration of opportunity cost of time for drivers when inconvenienced due to infrastructure downtime  E.g. congestion, re-routing around road  Should also consider vehicle operating delay cost (fuel, etc).  A cost/vehicle estimate used  $12-$25 for cars/big trucks gets used

Examples (No User Costs)  Project B:  Construction $350k  Prevent. Yr 8 $40k  Major Yr 15 $300k  Prevent. Yr 20 $40k  Prevent. Yr 25 $60k  30 $105k  NPV $610k  Project A:  Construction $500k  Prevent. Yr 15 $40k  Major Yr 20 $300k  30 $150k  NPV $705k

What’s Missing?  Note LCC for infrastructure generally does not consider any ‘pure benefits’ of using it  Its presumed that all alternatives would yield similar/equal value  This is usually the case, but could be affected by design or budget constraints (e.g. a 2 vs 4-lane road or bridge)

An Energy Example  Could consider life cycle costs of people using electricity in Texas  Assume coal-fired power plants used  Coal comes from Wyoming  Option 1 (current): coal mined, sent by train to Texas, burned there  Option 2: coal mined, burned in Wyoming into electricity, sent via transmission line to Texas  Which might be cheaper in cost? What are components of cost that may be relevant? Are there other ‘user costs’?

Reliability-Based Management  From Frangopol (2001) paper  “Funds are scarce, need a better way”  Have been focused on “condition-based”  Unclear which method might be cheaper  Bridge failure led to condition assessment/NBI methods  Which emphasized need for 4R’s  Eventually money got more scarce  Bridge Management Systems (BMS) born  PONTIS, BRIDGIT, etc.  Use deterioration and performance as inputs into economic efficiency measures

BMS Features  Elements characterized by discrete condition states noting deterioration  Markov model predicts probability of state transitions (e.g. good-bad-poor)  Deterioration is a single step function  Transition probabilities not time variant

Reliability Assessment  Decisions are made with uncertainty  Should be part of the decision model  Uses consideration of states, distribution functions, Monte Carlo simulation to track life- cycle safety and reliability for infrastructure projects  Reliability index  use to measure safety  Excellent: State 5,  >= 9, etc.  No guarantee that new bridge in State 5!  In absence of maintenance, just a linear, decreasing function (see Fig 1)

Reliability (cont.)  Not only is maintenance effect added, but random/state/transitional variables are all given probability distribution functions, e.g.  Initial performance, time to damage, deterioration rate w/o maintenance, time of first rehab, improvement due to maint, subsequent times, etc..  Used Monte Carlo simulation, existing bridge data to estimate effects  Reliability-based method could have significant effect on LCC (savings) Why?