Action Implementation and Evaluation Planning Whist the intervention plan describes how the population nutrition problem for a particular target group.

Slides:



Advertisements
Similar presentations
Project management.
Advertisements

Il Project Cycle Management :A Technical Guide The Logical Framework Approach 1 1.
Project Management Concepts
M & E for K to 12 BEP in Schools
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
CS3500 Software Engineering Project Management (1) In 1986 one well-known software engineer (Tom DeMarco) made the simple but important observation: “You.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Submission Writing Fundamentals – Part Webinar Series Leonie Bryen.
Decision Making Tools for Strategic Planning 2014 Nonprofit Capacity Conference Margo Bailey, PhD April 21, 2014 Clarify your strategic plan hierarchy.
Projmgmt-1/18 DePaul University Evaluating Schedule In MicroSoft Project Instructor: David A. Lash.
Parts of the project proposal
Action Logic Modelling Logic Models communicate a vision for an intervention as a solution to a public health nutrition (PHN) problem to:  funding agencies,
Evaluation is a professional and ethical responsibility and is a core part of PHN professional practice Commitment to evaluation helps build the PHN intelligence.
Modern Systems Analysis and Design Third Edition
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Action Implementation and Monitoring A risk in PHN practice is that so much attention can be devoted to development of objectives and planning to address.
© 2008 by Prentice Hall 1 Chapter 2. © 2008 by Prentice Hall 2 Project – a planned undertaking of related activities to reach an objective that has a.
1 SOFTWARE PRODUCTION. 2 DEVELOPMENT Product Creation Means: Methods & Heuristics Measure of Success: Quality f(Fitness of Use) MANAGEMENT Efficient &
Business Studies Grade 11.
Engineering Design Development. Turner College and Career High School.
Project Plan Development
Gantt Chart Engineering Design Development. Turner College and Career High School.
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Project Planning with IT Y/601/7321
TEMPUS IV- THIRD CALL FOR PROPOSALS Recommendation on how to make a good proposal TEMPUS INFORMATION DAYS Podgorica, MONTENEGRO 18 th December 2009.
This project is funded by the EUAnd implemented by a consortium led by MWH Logical Framework and Indicators.
January 2013 Action Plan Skills Building: Module 3 Planning the Details: Activities, Timelines, Resources, and More.
Project Management Tools A Loose Guideline on how to use shovels and rakes at AIAA A presentation for New Hires October 6, 1999.
Open Workbench By Wilmer Arellano Spring Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle.
Fundamentals of Evaluation for Public Health Programs ROBERT FOLEY, M.ED. NIHB TRIBAL PUBLIC HEALTH SUMMIT MARCH 31,
Using the Logical Framework to Develop Activity and Resource Schedules.
Part II: Planning Your Research Project Module Six: Proposal Development RESEARCH PROJECT MANAGEMENT 1.
Lecture 3 Managing the Development Project SFDV Principles of Information Systems.
MOD 6050 PROJECT MANAGEMENT AND FUND RAISING TOPIC – PROPOSAL WRITING AND FUNDRAISING (WK 6 &8) LECTURER: DR. G. O. K’AOL.
Monitoring & Evaluation: The concepts and meaning Day 9 Session 1.
Writing Winning Grant Proposals… All You Need Is a Little ESP! © Amy Duggins Pender 2010.
1 Designing Effective Programs: –Introduction to Program Design Steps –Organizational Strategic Planning –Approaches and Models –Evaluation, scheduling,
Lecture 3 Title: Information Technology Project Methodology By: Mr Hashem Alaidaros MIS 434.
Scheduling and risk Icelandic International Development Agency (ICEIDA) Iceland United Nations University Fisheries Training Programme (UNU-FTP) Iceland.
SOW / Open Workbench By Wilmer Arellano Summer 2013.
QUALITY OF THE MANAGEMENT PLAN 15 Points (recommend 5 pages)
Chapter 3 Managing the Information Systems Project
Information System Project Management.  Some problems that org faced with IS dev efforts include schedule delays, cost overrun, less functionality than.
Managing programs that promote personal effectiveness.
 2007 Johns Hopkins Bloomberg School of Public Health Section B Logic Models: The Pathway Model.
Monitoring Afghanistan, 2015 Food Security and Agriculture Working Group – 9 December 2015.
Defining and Managing Project Scope. MOV Scope Phases Time Estimates Resources Tasks Schedule Budget Sequence Project Planning Framework.
Monitoring and evaluation Objectives of the Session  To Define Monitoring, impact assessment and Evaluation. (commonly know as M&E)  To know why Monitoring.
Session 2: Developing a Comprehensive M&E Work Plan.
Chapter 7 Project Management and Event Implementation
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
Folie 1 Sarajevo, October 2009 Stefan Friedrichs Managing Partner Public One // Governance Consulting Project Management in the Public Sector Monitoring.
Project management. Software project management ■It is the discipline of planning, organizing and managing resources to bring about the successful completion.
Monitoring and Evaluation Systems for NARS Organizations in Papua New Guinea Day 5. Session 14. Work Plan and Budget for M&E.
Session VIII: Work Plan and Budget Plan
By Wilmer Arellano Spring 2010
HOW TO WRITE PROJECT PROPOSAL – FORM AND STYLE
Managing the Information Systems Project
Monitoring and Evaluation Systems for NARS organizations in Papua New Guinea Day 4. Session 12. Risk Management.
The Logical Framework Approach
Monitoring and Evaluation Systems for NARS Organisations in Papua New Guinea Day 2. Session 6. Developing indicators.
Project Management.
Assignment 2 The final assignment requires you to develop a hypothetical health promotion intervention in the format of a grant proposal. This will involve:
Project Management Process Groups
Modern Systems Analysis and Design Third Edition
Importance of Project Schedules
OGB Partner Advocacy Workshop 18th & 19th March 2010
Time Scheduling and Project management
Project intervention logic
Modern Systems Analysis and Design Third Edition
Presentation transcript:

Action Implementation and Evaluation Planning Whist the intervention plan describes how the population nutrition problem for a particular target group will be addressed (what type questions) The implementation plan details the specific tasks of the intervention identifying who is responsible for each task, the resources required and the timeline within which the task should be completed (how, who, when and with what type questions) Evaluation planning should occur in parallel with implementation planning to ensure the two processes are linked

Implementation and Evaluation Planning

Planning for Implementation Implementation planning starts with the strategy mix and systematically works through a process of:  Deconstructing strategies into activities  Considering the time and resources required for this work  Scheduling the sequence of work  Assigning who is responsible for each piece of work An implementation plan is a core project management tool and provides a hierarchical breakdown of the work to be done for the intervention Implementation and Evaluation Planning

Planning for Implementation A possible process for identifying activities and tasks for each intervention strategy includes :  Writing down each strategy (output)  Breaking each output into sequential units of work; activities  Break each activity into sequential smaller units of work called tasks  confirm the activities and tasks are appropriately grouped and classified  each completion of each set of tasks will result in achievement of the activity  Move activities and tasks around as necessary  give each item on the list a unique identifier to use as a reference → this information can be entered into a table for consultation Implementation and Evaluation Planning

Developing Work Package Plans After identifying the activities and tasks required for achieving each output, work package plans for each output can be detailed – one for each strategy Developing work packages for intervention outputs allows transparency activities and identification of key milestones for each work package Each work package should be developed by the intervention player responsible for implementing the activities and tasks Work packages can be illustrated in various forms and usually include specific reference to the sequence and duration of activities  Simple table format  Gantt chart Implementation and Evaluation Planning

Work package ID DescriptionWhoScheduled start Scheduled finish Predecessor WP 2 2.1Indentify nutrition expertise + develop session curriculum Project manager 05 Feb Feb Develop, consult and pilot curriculum Nutritionist20 Feb March Identify and book venue +catering Project officer 20 Feb March 2009 Work package schedule – example simple table format

Implementation and Evaluation Planning Work package schedule – example Gantt chart

Developing a Gantt Chart A Gantt chart is a horizontal bar chart that shows intervention activities and tasks in sequential order where bars represent the time estimates A Gantt chart is a flexible document that should be regularly updated through the life of the intervention A Gantt chart can be used for day-to-day management, planning and reporting A Gantt chart is useful to clarify planning estimates, work requirements and timelines with senior management Implementation and Evaluation Planning

Developing a Gantt Chart Implementation and Evaluation Planning The process to complete a Gantt chart follows:  List the work/work packages of the intervention – list each output in a separate cell in the first column  Identify resources – list resources required for each activity in the next column  Identify who is responsible – in the third column list who is responsible for delivering the activity  Estimate timeframes – create a timeline for the project in the remaining columns  Identify milestones – mark each significant event that acts as a progress marker (e.g. a black diamond) – add a milestone description

Developing Intervention Budgets Implementation and Evaluation Planning Budgeting is the determination of costs associated with the defined activities of the intervention Developing an intervention budget involves calculating the cost of the activities of the intervention A costing table can be developed for each strategy and then collapsed into a total intervention budget table Example cost titles include:  Personnel/staff  Catering/ venue hire  Travel  Design/ publishing/ printing

Implementation and Evaluation Planning Example - intervention costing table Personnel / Staff Catering/ Venue Hire TravelDesign/ Publishing Phone/ Postal IncomeTOTAL Activity 1.1 Activity 1.2 Activity 1.3 Activity 2.1 Activity 2.2 etc

Developing Intervention Budgets Implementation and Evaluation Planning A costing table should include both direct and indirect costs Direct costs = resources that are actually expended on the project activities Indirect costs are ‘in-kind’ expenses the partnering organisations are going to contribute to support the intervention A costing table should include a brief description of the items and calculation methodology Estimating intervention costs may involve:  Calling for quotes  Estimating the staff time an activity will require  seeking standard formulas for estimating on-costs and overheads  Applying standard government and consultancy rates for staff/consultants

Writing Action Statements Being able to accurately predict the resources needed to implement an intervention and justify this resource allocation is an important part of the grantsmanship process. A submission that fails to explain and justify how each item of funding (eg. Salaries, travel costs, equipment) relate to the activities outlined in the plan is likely to be considered high and will generally not be funded. Remember to show ‘in kind’ costs funding agencies like to see the organisation they are funding are also contributing to the intervention.

Evaluation Planning Implementation and Evaluation Planning Intervention evaluation is the systematic collection of data to enable critical appraisal of an intervention’s activities and outcomes to produce sensible conclusions and useful proposals that improve intervention efficiency, effectiveness or adequacy In simple terms: Evaluation assesses whether the  intervention objectives were met  methods used were appropriate and well-organised Evaluation findings are fed back into planning process to improve the next phase of the intervention and future interventions

Evaluation Planning Implementation and Evaluation Planning Evaluation starts at the planning stages of an intervention and continues throughout the life of the intervention It is important to plan evaluation strategies in parallel with implementation planning to:  Ensure the two processes are linked and inform each other  Inform stakeholders of the importance of evaluation  Assure stakeholders of the internal validity of the intervention  Increase participation in evaluation strategies

Levels of Evaluation Implementation and Evaluation Planning There are several different levels of evaluation in PHN practice: 1.Formative Evaluation - data collected prior to intervention implementation which is used to inform intervention design and assess capacity 2.Process Evaluation – assessed the intervention strategies and capacity building strategies 3.Impact Evaluation – measures whether the intervention objectives have been met 4.Outcome Evaluation – measures whether the intervention goal has been met 5.Economic Evaluation – measures cost-effectiveness of the intervention or intervention strategies

Implementation and Evaluation Planning Relationship of goals and objectives to evaluation Problem reflected in Goal measured by Outcome evaluation Determinants reflected in Objective measured by Impact evaluation Strategies reflected in Strategy Activities measured by Process evaluation Action Statements and Evaluation Levels

Implementation and Evaluation Planning Planning for evaluation involves considering two fundamental elements of evaluation: 1.Identifying a criterion of good performance (indicator) 2.Gathering the necessary data through observation and measurement too make an assessment Indicators are specific measures that signify the point at which goals and objectives have been achieved and are used as the criteria in intervention evaluation Each objective and strategy should have at least one clearly defined indicator of success – with the data source clearly stated Developing Evaluation Indicators

Writing Action Statements Evaluation planning should be heavily dependent and integrated with determinant analysis and related logic modelling. Evaluation needs to answer the questions: –Has the intervention changed determinants? –By how much? –How and why? (or just as important questions such as why not?)